• Tower Crane of Jing Kui Model Number   QTZ40(4708) System 1
  • Tower Crane of Jing Kui Model Number   QTZ40(4708) System 2
  • Tower Crane of Jing Kui Model Number   QTZ40(4708) System 3
  • Tower Crane of Jing Kui Model Number   QTZ40(4708) System 4
Tower Crane of Jing Kui Model Number   QTZ40(4708)

Tower Crane of Jing Kui Model Number QTZ40(4708)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ40(4708)  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 4T

Rated Lifting Moment: 400

Max. Lifting Load: 4T

Max. Lifting Height: 129

Span: 47

Place of Origin: Christmas Island

Brand Name: JINKUI

Model Number: QTZ40(4708)

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

QTZ40(4708)   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ40(4708)    Specification

 Tower Crane of Jing Kui Model Number   QTZ40(4708)

QTZ40(4708)    Pictures

 

Tower Crane of Jing Kui Model Number   QTZ40(4708)

Tower Crane of Jing Kui Model Number   QTZ40(4708)

Tower Crane of Jing Kui Model Number   QTZ40(4708)

QTZ40(4708)    FAQ

Q: What is the brand for the tower crane converter?

A: Normally, more than 10t series tower crane is equipped with converter. The selected converter includes SCHNEIDER, SIMENS, YASKAWA…it could be selected as per clients’ request.


Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.


Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


 

 

 

 


Q: How much do you know about construction cranes??
that depends, what do u need to know
Q: I'm talking about the movie, for those of you who have seen it. If you have seen it, you can probably recall one of the final scenes where head Gamemaker Seneca Crane is being walked to his death by two Peacekeepers. I really want a picture of this! Why? Because the Peacekeeper on the right is my dad! I think it would be awesome if I could get him a picture of this since he is so proud of it! So if anyone knows where I can find a clip of this scene, or knows where I could get a picture, could you please tell me? I'd really appreciate it! Thank you!
I don't think it would be out there yet, as the movie just came out. I would try searching Seneca Crane and then your dad's name. You also might be able to find it on YouTube. It's really cool that your dad was in the movie!! Good luck finding the picture!
Q: I need the answer badly
The world would be a little less beautiful. The blue crane's role as a predator in its ecosystem would be left empty, allowing its former prey to breed without check until (hopefully) another predator moves in to pick up the slack. Otherwise the ecosystem will be out of balance.
Q: Would David have made a better babysitter than a crane driver?
none of the crane accidents were fatal, a black lad was slightly injured though
Q: How do cranes get put together?
They're just born that way! lol, just kidding!
Q: i will like to crane operator?
You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
Q: I am looking for guidance on determining the optimal design parameters for the design of an overhead travelling crane when considering a span of 60m and a lift requirement of 2500Tonnes. If not possible what would be the maximum lift for the same span
is the 60 is the traveling distance or the span? if it is the span then this no way can be achieved or found, also 2500 tons is not logic for a single lift, you need to verify the design requirements. Usually crane span is related to structural frame spans, the lift has to be a practical one, which ranges from 1 ton to a 250 tons which is again very rare, majority traveling cranes are from 1 ton to 25 tons
Q: I'm not sure how to set this problem up. Any help would be greatly appreciated. Thank you :)
We start using by defining mechanical Power: = P=Work/time What is the work here? We lift the box a given distance. Work=mgh Since we know the power of the crane, we can simply plug in the values and solve for t: t=mgh/P This is only true if the crane has a constant power, which seems to be the case LeSmartOne
Q: The machine weight is 17500 KgEach crane capacity is 12500 KgThe lenght of beam is 4.5m and square cross section areaMaterial of beam is ASTM A 615 Gr60Machin connect to beam in 3 pointWhat is the beam cross section area dimension?
You left out crucial information and working it out with risky assumptions takes too much work. Whatever this was supposed to mean Machin connect to beam in 3 point What is missing is whether the cranes connect to the end and the entire weight of the machine is in the middle - or is the machine attached at 3 distributed points. In addition, there has to be some condition - looking at the ASTM spec will give strength, but you have specified whether the beam is to be just at failure or 50% safety factor, etc.
Q: cover up? I know he was into pornography and who knows what else!
Crane had just spurned his long-time friend John Carpenter. Carpenter was tried for the murder based on blood found in a car he rented, however he was acquitted as a murder weapon could not be found. The case remains officially unsolved.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords