Tower Crane of Chang Li Model Number Slewing Motor QTZ200 (7020)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ200(7020) Description
Feature: Tower Crane
Condition: New
Application: Buliding Construction
Rated Loading Capacity: 1T
Rated Lifting Moment: 400KN.M
Max. Lifting Load: 5T
Max. Lifting Height: 135m
Span: 47m
Place of Origin: Henan, China (Mainland)
Brand Name: YUJIE
Model Number: QTZ200(7020)
Certification: CE,ISO,IAF
Warranty: 15 months
After-sales Service Provided: Engineers available to service machinery overseas
Color: as your request
Materials: Q235 for tower crane
Angle: Squire Steel and Angle for tower crane
QTZ200(7020) Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
QTZ200(7020) Specification
QTZ200(7020) Pictures
QTZ200(7020) FAQ
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
Q: What is the meaning of the tower crane’s code?
A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.
Q: What is main advantage for manufacturing construction machinery?
A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies providing worldwide after-sales service;
- Q: what is the common cause of crane accidents
- Although mechanical failure does occur, most crane accidents are caused due to human error. Here are some examples: 1) Operating a crane during adverse weather conditions, such as wind conditions 2) Overloading a crane/ improper load calculations 3) Inexperienced or untrained personnel 4) Improper rigging of the load 5) Bypassing safety devises 6) Improper selection of the crane for the environment (ground conditions, power lines etc.) based on the type of load 7) Shock-loading a crane 8) Failure to perform maintenance and inspections in accordance to manufacture specifications I hoped this helped Cheers
- Q: If I have one week, is that enough time?
- It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
- Q: Please help me on this question, I can't seem to find it anywhere on the internet! :(
- No animals depend on Siberian crane but they are a source of food to carnivores in the wild.They are usually secondary source because there are mroe source of food that carnivores could eat.SO if they are extinct,it would not be a problem...its only destroying natures beauty!
- Q: How much height should tower crane work at M?
- High building one meter high voltage line to keep the relevant national standard to ensure the forearm and the adjacent adjacent tower crane tower crane standard section has a safe distance of 2 meters, big boom high high tower mechanism area covering more than one meter, the end will need to receive from the nearest cab hook.
- Q: My boyfriend's a little sick right now, and he's going to have a surgery over summer. I'm in the process of folding him 1000 cranes (like the Japanese legend), and in every crane I wrote a message. I have a list of all the messages so far. I'm not sure how to give it to him, though. 1000 cranes is a lot of cranes... and I don't want to make him carry a big heavy box or anything. I also want him to be able to read the messages... something I didn't think of much when I decided to write them on the paper I folded the cranes with...Anyway, I was thinking about a scrapbook or something. But that would be a really big scrapbook. And I'd have to probably write out all 1000 messages again in it... Plus, I'm not sure if I can find a scrapbook with enough pages.Any ideas?
- A clear Glass vase would be cool, the colors of the cranes would make it decorative, and he could reach in to read one whenever he needs a pick me up. It is especially a good idea for the hospital, since they sometimes frown on flowers for allergy reasons. I also love the idea of a mobile, but that would be huge and time consuming, also the messages would be hard to read. But perhaps you could take 20 and turn those into a mobile, tie them to a stick with sewing thread, and plant the stick in the jar or vase you use to display the others.
- Q: Please give a scripted answer. Funniest Denny Crane comment and action gets the 10 points
- Denny Crane. Now bring in the hookers. Did I mention I made Paula all she is..., was that just that I made Paula. Denny Crane Don't make me shoot you.
- Q: Construction tower crane operator certificate expires, how to verify?
- Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163 Http://www.cqybjs (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
- Q: What are the necessary safety devices on a tower crane?
- (3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.
- Q: What is the dumbest bird in the aviary community? Is it really the Crane?
- great question! I would love an aviary that was half open/half closed. I would love the birds to have the option at all times of choosing the protected surroundings (from weather, sounds, other animals, etc) of inside. Just as convenient would I love their ability to be outside in the fenced aviary so as to choose t heir own environment filled with trees, shrubs, plants, fountains but with enough room for me to observe and enjoy their interaction.
- Q: A 3000-lb wrecking ball hangs from a 40-ft cable of density 10 lb/ft attached to a crane. Calculate the work done if the crane lifts the ball from ground level to 40 ft in the air by drawing in the cable.
- The total work done by the crane equals the potential energy gained by the wrecking ball and the cable; the potential energy gained is W = V_final = Mg L + ρ L g L/2 which is the final potential energy of the wrecking ball and the cable added together. In the case of the cable, you take the center of mass of it which is located right at the center (L/2). The result is then W = 3000*32*40 + 10 * 40 * 32 * 40 / 2 = 4096000 ft-lbf = (4096000)*(0.001285067) BTU = 5263.63 BTU
Send your message to us
Tower Crane of Chang Li Model Number Slewing Motor QTZ200 (7020)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords