• Tower Crane of Chang Li Model Number  QTZ40(4510) System 1
  • Tower Crane of Chang Li Model Number  QTZ40(4510) System 2
  • Tower Crane of Chang Li Model Number  QTZ40(4510) System 3
Tower Crane of Chang Li Model Number  QTZ40(4510)

Tower Crane of Chang Li Model Number QTZ40(4510)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ40(4510) Description

Feature: Tower Crane

Condition: New

Application: All kinds of costruction

Rated Loading Capacity: 4T

Rated Lifting Moment:500/630/800/1000/1200KN.m

Max. Lifting Load: 4T

Max. Lifting Height: 150m

Span: 42M

Place of Origin: Henan, China (Mainland)

Brand Name: Yu Jie

Model Number: QTZ40(4510)

Certification: ISO,CE,BV,SGS

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Tip Load: 0.8

Trolley travel speed: 38/25m/min

Slewing speed: 0.6r/min

Jacking up: 0.4m/min

Powed: 380V/50HZ

Lifting character: 2/4 Fall

QTZ40(4510) Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ40(4510) Specification

 Tower Crane of Chang Li Model Number  QTZ40(4510)

QTZ40(4510) Pictures

 

Tower Crane of Chang Li Model Number  QTZ40(4510)

Tower Crane of Chang Li Model Number  QTZ40(4510)

Tower Crane of Chang Li Model Number  QTZ40(4510)QTZ40(4510)  FAQ

Q: What kinds of ur tower crane are available now?

A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane.


Q: What is the brand for your tower crane motor?

A: All the selected motors are outsourced from the same company as Potain China, which passed CE inspection (if you need, we could provide related certificate)


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



 

 


Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q: why do siberian crane migrate in india?
The Siberian Cranes nest in western Siberia . During Winter season in Siberia , they migrate to India which is their wintering ground.The migration route stretches for 4000 miles. Their resting place at the time of migration is the Lake Ab-i-Estada in Afghanistan. The Kaladeo Ghana National Park or the Bharatpur National Park has been declared a world heritage site because the Siberian Crane traverses nearly half of the globe to reach it. The Siberian Crane is presently an endangered species. Larger numbers of birds have been hunted down over the years especially when they undertake the perilous journeys across the Himalayas to reach the wet land. They are shot down in Pakistan to be gifted to friends and relatives. This has led to a severe decline in the number of Siberian Cranes in the world. The immediate need of the hour is to provide safety to the Siberian cranes along their migration route. This popular visitor has not been seen in the last two years in India. The last pair of Siberian Cranes which had made the Bharatpur Bird Sanctuary their seasonal home in the year 2002 was not seen in the year 2003. Their absence is indeed painful and one of the aims of the Crane foundation is to bring back the Siberian Crane to India.
Q: for my homework : the question was explain how a skyscraper crane uses physics moments but no where can i find out the answer and dont want a detention ekkk x
OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
Q: Can someone find me a map that shows the geographic location of the white naped crane?
it's not a map but it tells where theyre habitat range is.
Q: What kind of flower is the Sunset Crane?
Okay, i'm going to get every backyard gardener east of denver jumping down my throat on this one, but it's time you all wake up and know the real name of one of your favorate potted plants. only then will you beleave me when i tell you the sunset crane is a type of geranium. the true geranium. not the plant most people know as the geranium is botanically Pelargonium. that silly looking, red flowered, fuzzy leafed thing everyone loves to stick in a pot by their front door every summer back east and mistakenly call a geranium is not really a geranium. even the fancy Martha Washington geranium is not a geranium. it is the Martha Washington Pelargonium. but whats the use? unless you are a botanist everybody back east is going to say i'm just another fruit cake from california. (born and raised in wisconsin i'd like to add) okay, your sunset crane is botanically a geranium, often called by it's common name cranesbill. okay, you have the real best answer, so go ahead and pick the wrong best answer from some smuck from back east who knows best. sure i have two post graduate degrees in science, been a univ certified master gardener for over 15 years and just might know a tad bit more then the eastern fair weather, summer time gardener. but don't let that prevent you from thinking i'm nuts and choosing a better, best answer. i'm used to it. grandma is always right... until her plant dies. then they call me for the real low down.
Q: Recently a pair of Demoiselle Crane had a chick, it was al healthy right from the very beginning, its parents used to feed him/her a regular diet which usually consisted of insects and worms, it is almost a 30 days old however since yesterday he is not standing or walking on its own legs but just sitting on the knees
Your baby crane might have stepped on something, But this is nothing like malnutrition, From what ive learned the crane may have a joint dysfunction in the knee but this very common in cranes, I really think you should take an X-ray of the cranes legs because,(and the baby cranes feet will expand over time) This could get worse. This is more than likely a leg dysfunction. Hope this helps.
Q: how much does a crane operator make ?
Tons of money. I use to off load ships in the San Diego harbor and they were long shore men or women. The crane operator made about $40 per hour.
Q: I just made origami cranes and want to hang them up, each by themselves with just a peice of string....how should i go about doing this? how is it usually done?
TAke a needle threaded with a long piece of black thread, and make a small knot at end of long thread. Push the needle thru the middle of the crane's back and pull the thread all the way thru the hole till the knot catches. pull the needle off the loose end of the thread and make another knot on that end. take a push pin or thumb tack and push the pin thru the knot, then push the pin or tack into the ceiling. FYI, tape never works - I have tried. The black thread lets them flutter a bit, and is invisible most of the time. p.s. ask your parents if you can hang stuff from the ceiling first. they may not want you to do that since it will leave holes in the ceiling when you take them down.
Q: What are the necessary safety devices on a tower crane?
(1) lift height limit position limiterFor cranes with variable boom angles, the lifting motion must be stopped immediately when the top of the lifting device rises to the 8OOmm at the lower end of the boom.For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately.(2) lifting moment limiter and maximum lift limiter;When the lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped.If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value.When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.
Q: Can the attached arm of the tower crane be welded?
The following points: the calculation of tower crane according to the instructions provided with the attachment of the building, a maximum load attachment device (Fig. 14-44), therefore, should be in the way of adhering bar load as the design or check attached bar section basis.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords