Tower Crane Lifting Machines Famous Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detail of Tower Crane
Feature: Tower Crane Condition: New Application:Building,Construction,Industrial
Rated Loading Capacity: 1.6-8T Rated Lifting Moment:100KN.M Max. Lifting Load: 8T
Max. Lifting Height: 200M Span: 2.5-55M Place of Origin: China (Mainland)
Brand Name: CMAX Model Number: TC5516(QTZ100) Certification: ISO,CE
Warranty: 1 Year Free standing height (M):44 Max. Working Range(M): 55
Tip Lifting Weight(T): 1.6 Working Range(M): 45,50,55 Climbing speed(M/MIN): 0.5
Counterweight(T): 17.6 Working Temperature(°C): -40-+60 Type: Topkit Tower Crane
Delivery Date:25-30 days Mast Section Size(L*W*H)MM:1600*1600*3000
Main Features of Tower Crane
1. TC5516(QTZ100) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 55m, TC5516(QTZ100) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
5. Provide stepless speed regulation. Oustanding in working efficiency, operating stability and reliability.
6. Reduce future maintenance cost.
7. With scientific layout and beautiful appearance.
8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
9.After sales service will be offered which will get rid of all your worries in the purchase of our products
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
- The flare boom is just that, a stationary boom that supports the flare line. It is not a crane, those are completely separate and usually on the side of the platform away from the flare boom. The flare has to be set out from the platform so the radiant heat from the flame doesn't harm the people on board or the equipment. Yes there is normally a standing pilot and there will be a flame if there is a need to burn off the natural gas during an upset or emergency.
- Q:I was just wondering this since I come from Northern Ireland and in Belfast I think they're probably the most prominent landmark but are they actually famous and if you saw them would you know where they were?
- The cranes are iconic in Belfast and Northern Ireland. The company itself is most famously known for the building of the Titanic they also specialize in off-shore construction as well. I would say they are well known in Ireland and in some parts of the UK. They are probably known a bit in England as they were very interested in Belfast's heavy industry in the past. I don't think many people outside of Ireland and the UK would know about the Harland and Wolff cranes tbh. You can see them from many places in Belfast and they are a prominent landmark.
- Q:How do you win something from those crane machines in stores?????
- Skill and practice. And a machine that isn't rigged to make you lose. Alot of places loosen up the claw so it can't grip the prizes. Find a newer machine and bring plenty of spare change. You might get some strange looks sitting in front of one of those things for a long period of time, but that's how I decorated my daughters shelving in her room. Skill and practice.
- Q:im 35 and in august i get my license back and i am going after my childhood dream of being a crane operator and was wondering how i need to go about achieving this?
- I am sorry I do not know where are you from as different country might have different requirement on getting a Crane Operator licence. Anyway, I believe the basic is the same: You need to attend a theory class on crane operations which usually include topics like design theory of cranes, slinging and lifting, signalling. After this, there will be a practical session to test your understanding and practical operations on an actual crane in the training center's facility. Good Luck and May You Attain You Dream :)
- Q:would someone who study both white crane kung-fu & ninjutsu be called a mixed martial artist?
- Not by most MMAists. Strictly speaking, studying two martial arts is just cross training. To be MMA, the elements of the two would have to be blended together and trained in a realistic way (sparring), with equal attention being paid to the stand-up, clinch, and ground-fighting phases of combat.
- Q:I was wondering if anyone knows what period this book is set in? I know that it's set in the slums of New York and the story was published in 1893. But what time period does the story actually take place?
- I studied in in university - it's contemporary to when it was written, so it may as well be set in 1893. Crane was in his early 20's when he wrote it. He was addressing a societal issues of the day, particularly living in the slums of New York and the shift in American culture/economy from primarily agricultural to industrial. It addressed poverty, disaease, social ills and the dreariness of poor city life. The book was quite controversial when it first came out.
- Q:why are siberian cranes endangered?
- Would you spend a winter in Siberia if you could fly south?
- Q:How to choose tower crane in engineering, such as arm length and lifting weight?
- How to choose tower crane in engineering:1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
- Q:Can someone find me a map that shows the geographic location of the white naped crane?
- it's not a map but it tells where theyre habitat range is.
- Q:What is the present status of large Boom Tower Crane?
- Large boom crane arm depicts one and another new history. New York's World Trade Center towers is the skyscraper that is the highest and has the most floor in New York City .Its main building is steel and concrete composite structures,using steel 78 thousand tons.The Building started in 1966 and lasted seven years, with 110 layers, 411 meter in height as a giant skyscraper it is writed in history. During in Construction
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane Lifting Machines Famous Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords