Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with QTD160
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTD160 Description
Feature: Tower Crane
Condition: New
Application: construction
Rated Loading Capacity: 12ton
Rated Lifting Moment: 1600KN.m
Max. Lifting Load: 12ton
Max. Lifting Height: 200m
Span: 3~55m
Place of Origin: Shandong, China (Mainland)
Brand Name: MEIDA
Model Number: QTD160 luffing jib tower crane
Certification: ISO,CE,GOST,BV
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Free standing height: 27m
Rated hoisting capacity max radius: 2ton
Mast section dimension: 2*2*3m
Jib length: 50m,55m
Slewing speed: 0.8r/min
Relay elements: Schneider
Tower Crane Power: 83.1kw
Max.lifting capacity: 12ton
Tower crane Material: Q345B Steel
Tower crane Color: as customers' requirement
QTD160 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Impeller blasting/rust protection paint
4. Advanced painting process
5. Potain masts designed with dismountable panels, making teansport easier and cheaper.
6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
7. Engineers available to service machinery overseas.
QTD160 Specification
QTD125 Pictures
QTD125 FAQ
Q: What kinds of ur tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane.
Q: What is the brand for your tower crane motor?
A: All the selected motors are outsourced from the same company as Potain China, which passed CE inspection (if you need, we could provide related certificate)
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
- Q: Please write in days, hours, weeks, etc.I need math help!!!!
- If it takes 7*60 + 11 = 431 seconds to make 1 crane, then making one million would take 431,000,000 seconds. There are 3600s*24hr*365.25d = 31,557,600 seconds in an average year. Dividing 431 million by this gives a little over 13 years, with a remainder of 20,751,200 seconds. There are 3600*24*30 = 2,592,000 seconds in an average month. So that gives 8 months with a remainder of 15,200 seconds. There are 3600 seconds in an hour, so that gives 4 hours plus 800 seconds. The 800 seconds = 60*13 + 20 = 13 minutes, 20 seconds. This works out to 13 years, 8 months, 4 hours, 13 minutes, and 20 seconds. Though answers can vary depending on how many days you define to be in a year, and how many days in a month.
- Q: I was told that this was taking place, so i would like to fax the info to the proper local
- Is it a seeing eye dog?
- Q: How much do you know about construction cranes??
- that depends, what do u need to know
- Q: I still cannot grasp how a crane was taken apart on a building with no roof
- They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
- Q: Once, I pulled a book off a shelf in a library and found a very uplifting message on a sticky note that made my day. It's inspiring me to do the same, only with paper cranes since I love origami. I'm going to college in the city, and I was thinking about writing positive messages on them and planting them everywhere (discreetly, of course). What are your thoughts on this? It sounds fun, but what are the consequences? Is it even that big of a deal, or do you think it's a waste of time?
- I love doing things like this! Whenever my friends go to the mall we do this. We put inspirational quotes and images everywhere we can. In the pockets of clothing, on top of the sale signs, all over the cafeteria. There isn't anything wrong with doing it, and people love it! I'm sure the cranes will be beautiful and many people will appreciate them. Be sure to write look inside on the outside of each crane if you're hiding the message on the inside! This is such a cool idea, I'd love it and I'm sure it won't even be a slight nuisance to anyone. Have fun!
- Q: this wind speed refers to that height of wind speed?
- This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
- Q: The arm of a crane at a construction site is 12.1 m long, and it makes an angle of 30° with the horizontal. Assume that the maximum load the crane can handle is limited by the amount of torque the load produces at the base of the arm. (a) What is the magnitude of the maximum torque the crane can withstand if the maximum load the crane can handle is 500 N?(b) What is the maximum load for this crane at an angle of 35° with the horizontal?
- (a) What is the magnitude of the maximum torque the crane can withstand if the maximum load the crane can handle is 500 N? τ = FL τ = 500(12.1cos30) τ = 5239.45 τ = 5240 Ν?m (b) What is the maximum load for this crane at an angle of 35° with the horizontal? τ = FL F = τ / L F = 5239.45 / 12.1cos35 F = 528.6109... F = 529 N I hope this helped. Please remember to vote a Best Answer from among your results. It's good karma as it keeps things in balanced exchange.
- Q: I need several quotes from Thousand Cranes by Kawabata (Don't remember first name, it starts with a Y) depicting passion.At least two.Best answer goes to whoever provides the most useful quotes, not a randomly compiled list.
- Yasunari. okorder /
- Q: For my science fair project we have to build someething using simple machines, me and my partner decided to do the crane, but we havent been able to find any place that shows intructions on how to build it. If you can please included a step by step plan, the things you will need ( whether or not they are hard to find/ and if so where i might be able to find them ), and your sourcetruely i appreciate this sooo much thankyou in advance everything counts so please make it as detailed as possible and if you know any other sites that show please include thank you sooo much :)
- you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
- Q: How to improve the stability of tower crane
- The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
Send your message to us
Tower Crane for Sale,Tower Crane Price Luffing Jib Tower Crane with QTD160
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords