• China Manufacturer of best Prices Tower Crane System 1
  • China Manufacturer of best Prices Tower Crane System 2
  • China Manufacturer of best Prices Tower Crane System 3
  • China Manufacturer of best Prices Tower Crane System 4
  • China Manufacturer of best Prices Tower Crane System 5
  • China Manufacturer of best Prices Tower Crane System 6
China Manufacturer of best Prices Tower Crane

China Manufacturer of best Prices Tower Crane

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our China Manufacturer of best Prices Tower Crane


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our China Manufacturer of best Prices Tower Crane


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our China Manufacturer of best Prices Tower Crane

ItemParameter
Free standing height (m)46
Max height with attachment (m)150(200)
Working range can be adjusted(m) 44/50/55
Min working range(m) 2.5
Max lifting capacity(t)8
Tip load @ 56m(t)1.3
Hoist mechanismFalls24
Lifting capacity(t)0-20-40-40-8
Speed(m/min)0-800-400-400-20
MotorYZRWFc250M-4/8 30/30KW
Trolleying mechanismSpeed(m/min)12/27/53
MotorYZTDE132L-4 /8/16 3.3/2.2/1.1KW
Slewing mechanismSpeed(r/min)0-0.6
MotorYZR132M2-6-3.7KW×2
Climbing speed(m/min)0.5
Counterweight(t)14.1
Mast section size(L×W×H)mm1800×1800×2500
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)42
Rated working voltage & current380V/128A

China Manufacturer of best Prices Tower CraneChina Manufacturer of best Prices Tower CraneChina Manufacturer of best Prices Tower CraneChina Manufacturer of best Prices Tower Crane

China Manufacturer of best Prices Tower Crane


China Manufacturer of best Prices Tower Crane

FAQ China Manufacturer of best Prices Tower Crane

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q:He is one of my favorite poets. I want to read more of his work.
How about my favorite poem about Hart Crane? AT HART CRANE’S TOMB by Glenn Robert Swetman In his mind’s dark, he spoke a frivolous age where marriage of the like was spring, where vitelline worlds of virgin instinct were crushed in the obscene cleanliness of a raccoon’s paw. Did he imagine that his great sun could come trailing yellow handkerchiefs of light, like a queer comet? No, there is something out there that commands, and not worlds of perfect clipping will turn these rotund hedges into maypoles—and live. That’s why the green expands as it reaches. He must have seen this finally. His leap Into the green sea was, aesthetically, clean.
Q:I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
I dont know how, maybe polio, but he does have a disability.
Q:Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
Construction cranes are erected on site. They are usually assembled on the ground with small cranes, then lift themselves up. The erection sequence is carefully figured, so minimal other equipment is needed. For conventional cranes that are permanent and thus only assembled once, portable cranes are used to erect them. Still, generally pretty much on the ground. Some have counterbalances that are permanently fixed, others have a rail type mechanism that moves in and out.
Q:What are the types of tower cranes?
The tower crane is divided into: fixed tower crane mobile tower crane self lifting tower crane mobile tower crane is divided into: rail type tire type automobile type self lifting tower crane is divided into: attachment type climbing uses: concrete with cage for loading and unloading installation general building mixed
Q:I herd that there was some sort of legend that if you make a certain # of paper cranes you get a wish! Do you believe this to be true? Do you have to make 100 cranes or 1000 cranes?
It sort of depends, maybe. And the legend says that it is indeed and unfortuantely 1,000 cranes. It also says you have to make all of these within a year, and it is a DIY project
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
Q:i want to know about the origami cranes
im pretty sure the origiami craft originated in Japan. i'm not too sure, but i did look it up, and it said japan. so im guessing thats right.
Q:From what I'm understanding in the first stanza, a women lost her lover to the war because he fell off his horse...Is that right?
Yes, Stephen Crane talks about lost love and sacrifices in his poem. The basic casualty of war. A lover, a father and son are lost in his story and those that are left behind he tries to console. The poem is noted for the ironic use of war is kind. We all know that War is really not kind. The poem’s speaker, simultaneously sympathetic with the victims of war and cynical about the purposes of war, implicitly criticizes the image of the romantic hero, showing in graphic scenes the realities of battlefield death and the emotional torment it causes for those left behind.
Q:how do you make one of them, put me through sep by step with photos.
Hi okorder /
Q:I have to build a hydralic system that can pick up a paper clip . the supplies you are allowed to use are 10 straws, 5 pipe cleaners, 1 yard of masking tape. 10 note cards. 2 syringes and tubing. 5 rubber bands. 8 popsicle sticks. 2 feet of string. 1 magnet. Please help.
build a basic crane out of your materials and thread the string to the magnet hold it on with tape secure opposite end of the string to the plunger on one syringe. and fix this syringe(syringe 1) to the frame of the crane. position the plungers of both syringes at mid point, and fill both with water, and fill your tubing with water. connect the needle ends of both syringes together with the tubing. pushing the plunger on syringe 2 will cause the plunger in syringe 1 to move out. pulling the plunger on syringe 2 will cause the plunger on syringe 1 to retract and can be used to lift the paperclip.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords