QTZ100(TC6010) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ100(6010) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q: how much does a whooping crane eat per day?
- To figure out exactly how much they eat you would have to know the exact weight of the bird, the calories in the food, and the condition of the bird. Which is a very long way of saying that I don't know the answer to your question, but there is a mathematical way to figure it out if you are really interested.
- Q: I loved Dr. Crane and his sexy glasses and eyes. Plus, I just love Cillian Murphy, haha. Is his character back in the Dark Knight, I heard he was...but I was wondering if anybody could confirm it?
- Dr.Crane/Scarecrow is in the beginning of the movie and he gets his but kicked by Batman and gets arrested. It's not a big deal in the movie its just 10 minutes of action that makes people happy.
- Q: How much do you know about construction cranes??
- that depends, what do u need to know
- Q: plz help me
- The Whooping Crane (Grus americana) is a very large crane. It is the tallest North American bird and the only crane species found solely in North America. Adults are white; they have a red crown and a long, dark, pointed bill. They have long dark legs which trail behind in flight and a long neck that is kept straight in flight. Black wing tips can be seen in flight. Immature birds are pale brown. Their breeding habitat is muskeg; the only known nesting location is Wood Buffalo National Park in Canada and the surrounding area. They nest on the ground, usually on a raised area in a marsh. The female lays 1 to 3 eggs. Both parents feed the young. Usually no more than one young bird survives in a season. Loads more on Wikipedia (link below) - good luck
- Q: I need a web site for crane documentation. What I need, is a site, where from I can get, when needed, hydraulic and electric schematics for all kind of cranes (crane trucks, bridge cranes, etc)Thank you,
- try okorder /
- Q: How do you get a crane down from a tall building once it's completed?
- You don't have to worry about that in the deep south! There are no high buildings
- Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
- Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
- Q: How do you jump a crane? I know you jack it up but how is that done?
- I have no idea what you mean by jump a crane? What type of crane? Truck mounted, overhead, pedestal?
- Q: Before the Advent of the Railroad Steam Recovery Crane Car (pictures below), how were Locomotive Steam Engines recovered after a derailment from the 1830's to the 1890's?
- Block and tackle. Some disassembling required. Consider this Stonewall Jackson raided Grafton WV and took several locomotives over land to a southern rail head. The special equipment was developed due to increased engine size. When steam cranes were/are used temporary tracks are laid at the wreck site for several reasons. one of which is to get equipment in and the other is to haul the wreckage out. The actual number of cranes required depended on the engine/s in the wreck, location on the wreck, skill of the operators and extent of damage. If the locomotive was damaged to much, it might be cut up. If the location was too difficult for recover, they were abandoned or buried. Rumor has it that there are several locomotives left at the bottom of slides awaiting for some one with enough money to recover them for restoration. Like the story of legend concerning a 1953 Corvette in a old barn. Hope that answers all your questions.
- Q: What kind of personnel should be installed for the tower crane installation and disassembly?
- According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;
Send your message to us
QTZ100(TC6010) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords