• Topkit/Topless Tower Crane Free Standing Height 50.5M System 1
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 2
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 3
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 4
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 5
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 6
Topkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Topkit/Topless Tower Crane Free Standing Height 50.5M:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Topkit/Topless Tower Crane Free Standing Height 50.5M:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Features of our Topkit/Topless Tower Crane Free Standing Height 50.5M:


ItemParameter
Free standing height (m)50.5
Max height with attachment (m)200
Working range can be adjusted(m) 48/54/60
Min working range(m) 2.5
Max lifting capacity(t)10
Tip load @ 60m(t)2.4
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-2.50-50-50-10
Speed(m/min)0-800-400-400-20
MotorYZPBF250M1-6-45KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-56
MotorYZPBE132S-4-5.5KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTW112M-4-5.5KW×2
Climbing speed(m/min)0.5
Counterweight(t)48m jib 54m jib60m jib
15.4517.8518.9
Mast section size(L×W×H)mm2000×2000×3000
Working temperature-40-+60°C
Total power(KW)63
Cable type ( within 35 meters from site power source to lower electric box of tower crane )50mm2(3+2, 5 cores)
Startup voltage & current380V×95%=361V       219A
Rated working voltage & current380V/121A

Topkit/Topless Tower Crane Free Standing Height 50.5MTopkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M


Topkit/Topless Tower Crane Free Standing Height 50.5M

FAQ Topkit/Topless Tower Crane Free Standing Height 50.5M;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: would someone who study both white crane kung-fu & ninjutsu be called a mixed martial artist?
It is mixing two martial arts but its not mma. MMA is more for fighting. While the styles you speak of are thought to be more of an ART. White crane kung-fu is not even used today and very rare to find. Most people that claim to teach it are probly teaching there own crane style. That goes for the same as ninjutsu. Both I styles i find to be not affective when matched up against an mma fighter. Some people from watching movies have this belief that ninjutsu is some deadly art when what is left of it today is not. Ninjutsu has not evolved and does not possess the ground game the brazilian Jui jitsu posses. Its also widely known that finding a true ninjutsu school is next to impossible. Now to Emerald. Your wrong. I must disagree with just about all your points. Its widely known that Boxing is the oldest known martial art in the world. Next to that is wrestling. You forget that another popular style among MMA practitioners is Muay Thai which has been around just as long as kung fu. It is also known to be one of the most powerful styles used today. Sorry to say its been proven that a master of one art will lose to a master of BJJ. We all remember the gracie challenge that got this started. U must of never seen all the karate and kung fu guys get choked out. Ignorance is bliss. Your styles failed and that is why they are no longer is use in mma today. Watch the UFC then watch your karate point sparing. Think about it.
Q: i am a student of class 12 can anyoone tell me how do i make a project on an electromagnetic crane?
act ur age man i did that project when i was in 6th
Q: If a crane fly loses a leg will he be okay? Is it painful for him or do they just 'release' them like a lizard can release it's tail?
Chances are, it won't be O.K. Some spiders can release their legs, but only if given fair warning (a gentle tug). If the crane fly lost his leg violently, he will probably die from the injury. Whether or not the injury kills him, he will, of course, be more vulnerable to predators. Not to be morbid or cold, because I really do love animals, and hate to see harm come even to the under appreciated invertebrates, but the Crane fly usually only lives a couple of days, so as long as he mated, his job on earth was finished anyway.
Q: in the Open Boat by Stephen Crane, in part IV why are the characters not identified?
The characters are defined by their roles on the boat. Their previous experiences or personalities don't matter here. It is just the narrow repetitive experience of rowing and how they each contribute to it. Each character is Everyman, being thrown around by the merciless, indifferent hand of Fate. I think that Crane was squarely in the company of Naturalists (they think there's no such thing as individual agency, like Darwinism in fiction). The interesting thing to think about here is that one character has a name - Billie, the oiler. Why is this? He's the strongest, he's the most experienced and he's the one that dies. He's an individual to the reader but Fate doesn't care. I'm sure you can flesh the ideas out now.
Q: the highest ranking American serviceman, at least in the so called prison camp
no, he was brutally murdered
Q: What is tower crane? What are the types and features?
[definitions]Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q: the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
Q: Before the Advent of the Railroad Steam Recovery Crane Car (pictures below), how were Locomotive Steam Engines recovered after a derailment from the 1830's to the 1890's?
Block and tackle. Some disassembling required. Consider this Stonewall Jackson raided Grafton WV and took several locomotives over land to a southern rail head. The special equipment was developed due to increased engine size. When steam cranes were/are used temporary tracks are laid at the wreck site for several reasons. one of which is to get equipment in and the other is to haul the wreckage out. The actual number of cranes required depended on the engine/s in the wreck, location on the wreck, skill of the operators and extent of damage. If the locomotive was damaged to much, it might be cut up. If the location was too difficult for recover, they were abandoned or buried. Rumor has it that there are several locomotives left at the bottom of slides awaiting for some one with enough money to recover them for restoration. Like the story of legend concerning a 1953 Corvette in a old barn. Hope that answers all your questions.
Q: Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
Why should they be? That stance is from an art that is practiced by a small number of practitioners in Okinawa known as Hakutsuru, which means White Crane. It was hollywood-ized... so what? The original movie was written by a practitioner of Goju Ryu, who trained in NYC under an instructor from the Bronx named Kao Loong Ong. He knew there was a link between White Crane and the development of Okinawan Karate. Robert Kamen trained with Kayo, as he is known, who is Chinese and is well known in NYC's China Town. If they should apologize, hollywood must apologize for their misrepresentation of SO many things - insults to practically all the cultures of the world.
Q: I only wish to know about Tower Cranes, not any other type of crane. Also only wish to know about cranes on the job, not sitting in a crane yard. I am an operator and looking to move and want to know where the work is best so a list of top five would be terrific. Thanks.
We have been told that our state bird was a crane. That's because there are so many of them here all the time. Construction is booming in Oklahoma. I think most of them are coming from the east and west coasts. They can get a much larger house here for a whole lot less. They are sold when they are being built.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords