Top Cup for Scaffolding and Formwork System
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Top Cup Description
Top cup is an accessories of cuplock system, which is the most popular used scaffolding system in the world. It will greatly reduce the cost because of the following advantages.
2.Main Features of Top Cup
It will greatly reduce the cost because of the following advantages
1)Extremely tight
2)Easy to install
3)It can be used again and again for nearly 20years
3.Top Cup product pictures:
4.Heavy Duty of Top Cup Product Description
Product: | Top Cup |
Raw Material: | malleable |
Weight: | 0.25kg |
Standards: | BS1139 (1982 & 1991), EN74 class A & B |
Surface treatment:
| Self color, Electro galvanized, Hot dip galvanized, or painted |
Fit pipes diameter: | 48.3mm |
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1)How many Scaffolding your company have?
Here comes our 5 types of Scaffolding systems:
- Cup lock Scaffolding
- Ring lock Scaffolding
-Kwistage Scaffolding
-H-frame Scaffolding
-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.
2)How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
- Q: Exterior wall scaffold construction plan?
- Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
- Q: What are the requirements for the sampling inspection of scaffolding?
- Inspection and acceptance of cantilever scaffold1 after the erection of the cantilever support, the scaffold is erected;2 before loading on the work layer;3 after each set of 10m height;4 after reaching the design height;5 in the case of more than six winds and heavy rain;6 use more than a month.Cantilever scaffold inspection document1 special construction plan and design documents;2 safety technical disclosure;3 the provisions of appendix D, table D.1.
- Q: What does scaffold one's days mean? kill time?
- In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
- Q: Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q: On Wednesday day I'm planning to get this done (the top piercing). I've been thinking about it for a while now really want it.What problems can I have with this piercing?How long does it take to heal ect?Thanks =)
- i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
- Q: Fastener type steel pipe scaffold accessories
- fastenerFastener type steel pipe scaffold fastener malleable iron casting should be adopted, its basic form has three kinds: vertical cross bar for a connection between the rectangular fastener, fastener for rotating connecting parallel or oblique bars and rods for butt joint butt joint fastener.
- Q: Fastener type steel pipe scaffold composed of two components? What are the roles?
- 2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q: I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
- Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
- Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
- It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
- Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
- That first answer is correct. When I worked as a construction electrician back in the 1980's the OSHA requirements were not so strict, but now the harnesses and tie-offs are required for any work platform over 6' from the ground.
Send your message to us
Top Cup for Scaffolding and Formwork System
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords