Climbing Frame JS-C300 Series for construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 5000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
It takes cold-formed Rib-Grip jointing system to connect the tubes with aluminum cast joints. High strength tubing is hydraulically cold-formed to lock mechanically into pre-cast grooves outside and inside the heat-treated joints Aluminum fittings. This method of producing aluminum scaffolding components gives tensile joint strengths up to three times greater, than that of traditional welded types, and the national detected shows that the pulling-out force of jointing reaches to 4 ton.
Customers specification are accepted
Aluminum Tube:
specially used for cold-formed jointing system, AL5086
Models in JS-C300 Series
• Climbing Frame of Single-width, Heavy-duty (360kg) (794 lbs):
JS-C300-2SH, JS-CH300-2.5SH
• Climbing Frame of Single-width, Medium-duty(270kg) (595 lbs):
JS-C300-2SM, JS-CM300-2.5SM
• Climbing Frame of Single-width, Light-duty (200kg) (441 lbs):
JS-CL300-2SL, JS-CL300-2.5SL
Features
• BS EN 1004-3-8/12-D;Industrial Strength Tower Class 3 Loading 2kn/m2
• Designed for ascending vertically by side rung, working platform can be assembled in
any rung with rung spacing of 300mm.
• casting available in A380 for die-casting and ZL111 for casting processing techniques
• Easy and convenient to pass through the standard doors and walkways.
• Light-weight, high tensile, trouble-free assembly, safe, durable and cost-effective
Technical Data of Climbing Frame JS-C300 Series | ||||
L×W×PH Working Height (m) Tower Height (m) Platform Height (m) | 2m/2.5m× 0.678m × 2m (up to 8m) | |||
4 | 6 | 8 | 10 | |
3 | 5 | 7 | 9 | |
2 | 4 | 6 | 8 | |
Loading Capacity | Maximum uniformly distributed load capacity available in 200kg, 270kg and 360kg for platform and 400kg, 540kg and 700kg for the whole tower (not including the self weight and ballast). |
- Q:What are the safety requirements for the dismantling of construction scaffolding
- (1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
- Q:what happened when author dimmesdale went to the scaffolding in town square?
- Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
- Q:Mobile scaffolding accessories prices
- ! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
- Q:The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
- 1, the height of the super 24M drop steel scaffolding; 2, attached to the lifting of the scaffolding, including the overall lifting and chip upgrade; the 3, cantilevered scaffolding; the door scaffolding, scaffolding, the scaffolding, scaffolding, the scaffolding; the 5, hanging basket, scaffolding, scaffolding, and so on; 6;
- Q:I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
- Theres no difference scaffold is what they call it in like europe, indusstrial is usa
- Q:What issues need to pay attention to the construction of high-level scaffolding
- To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
- Q:In the U.S.I live in Illinois as well so... yeah :DThank you!
- Location Pierced through from the top rim and coming out on the side rim Procedure can be pierced as two separate piercings and then a long barbell fitted when healed , though more successful and comfortable when pierced straight through initially , the barbell then fitting comfortably as guaranteed to line up exactly This can be multiple pierced with barbells sitting parallel to each other, or designed to sit diagonally forming a cross as well as even being placed vertically from Helix to the lobe. These are only possible where the main cartilage shape of the ear does not protrude preventing a straight passage for the jewellery to sit comfortably. Procedure Needle piercing Complications As there are two piercings and each has the potential to swell a barbell at least 4mm larger than the ear is required to allow for swelling
- Q:by scaffolding ?
- I'm guessing it is a reference to large breasts. But I could be wrong.
- Q:Because my friend wants it done but isn't sure :)
- Old enough to spell PIERCED right. <3
- Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
- Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Climbing Frame JS-C300 Series for construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 5000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords