• Cup-lock Scaffolding for Formwork Support System System 1
  • Cup-lock Scaffolding for Formwork Support System System 2
Cup-lock Scaffolding for Formwork Support System

Cup-lock Scaffolding for Formwork Support System

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Cup-lock Scaffolding for Formwork Support System

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Cup-lock Scaffolding for Formwork Support System

Equipment of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

Avoid using bolt in assembly and low down labor intensity

Reliable bending, shearing, torsional strength of dentition &cup-lock connection, the overall of it is more stable than normal

Not easy to lose fastener, portable firm and easy to maintain and transport 

 

3. Cup-lock Scaffolding Images

 

Cup-lock Scaffolding for Formwork Support System

 

Cup-lock Scaffolding for Formwork Support System

 

4. Cup-lock Scaffolding for Formwork Support System Specification

There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar. 5 times fast of adapter plug assembly and dis-assembly than normal. Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage.

 

5. FAQ of  Cup-lock Scaffolding for Formwork Support System

1) What can we do for you? 

    We can ensure the quality of the Cup-lock Scaffolding for Formwork Support System and avoid extra expenses for customers.    

    We can provide you the professional technical team.    

    We can provide professional building proposal for your project.       

    Please feel free to customize. 

 

2) What promises can be done by us?

    If interested in Cup-lock Scaffolding for Formwork Support System, please feel free to write us for any QUOTE.

    If need any technical and building assistance, we could provide on-site professional staff for instruction.

    Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

    Response will be carried out  in 24hours  after receiving any complain or request.

    Any formwork cost can be refund after order is confirmed. 

    If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    Packing: wood package and adhesive tape

    Shipping: by sea

    Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.

Q: If I built a box using standard diameter scaffolding tube (48mm) and connected it using kee clamps rather than standard scaffolding connectors, do you think it would be strong enough to support a 2000lb bar being dropped on it from a 2m height without breaking? I want to build it without welding, but am concerned over the strength of such a box connected only with kee clamps.
though that page doesn't seem to be quite complete
Q: I mean, anybody knows when will they finish the exterior restoration?
My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
Q: Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
Must be 120 steps according to the distance control, set up close to the bottom plate beam always available for 60 or 90 bars and the adjustable bracket is adjusted.
Q: Bowl buckle scaffold steps can only be used in the number of meters 3
6 vertical protective scaffolding = natural floor to the top of the cross bar between the tower set up the actual length of the towerThe total amount of construction work of the comprehensive scaffold is calculated according to the total floor area of the building
Q: All i can find is full time positions but none for turnarounds
Assuming you mean fling and that you only want to fling them virtually you could use Java.
Q: The relationship between the height of the scaffold and the design load
Compared with the steel pipe scaffolding, saving more than 500 thousand yuan of funds;
Q: Hi people, just wondering if the main Angkor Wat temple is still under restoration/renovation with all that green tarpaulin and scaffolding on it?I'm wondering when that will be off as it might obstruct the amazing views.Is there any restoration schedules?thanks!!
Basically Angkor Wat is always under construction. The green tarpaulin is still there on the left side, it does ruin the photo opportunity a little bit.
Q: is it possible to have an industrial piercing done in 2 stages? so like 1 hole first and then a few weeks later the 2nd hole done. ive found a place that for 2 holes is cheaper than having the whole process done as one. Please help :)
yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.
Q: What person or place to scaffold?
Since 80s, Chinese achievements in the development of advanced scaffolding series, with multi function significantly, such as gantry scaffolding series, cuplok steel tubular scaffolding series, annual output has reached tens of thousands of tons of scale, and has a certain number of exports.
Q: Bowl buckle scaffold weight per meter
The most commonly used part of the bowl buckle scaffold is 3130MM

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches