• Timber Beam with Competitive Price and High Bearing Capacity System 1
  • Timber Beam with Competitive Price and High Bearing Capacity System 2
Timber Beam with Competitive Price and High Bearing Capacity

Timber Beam with Competitive Price and High Bearing Capacity

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
3000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Table Formwork Description 

 

Table formwork is used for the concrete pouring of wall. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner. Timber beam formwork is a highly efficient and convenient system for medium area slab project. They can be transported to next position as whole table units whether by trolley or by crane lift.  

 

2. Main Features of Table Formwork  

  • Pre-assembled table unites, repositioning work becomes easy and fast.

  • Table height can be adjusted easily via prop in oder to fit different storey requirement.

  • Easy operation, save material and time.

  • High rigidity and repeat rate.

  • High standard components make low cost available.

  • The construction site is safe and fast.

     

3. Table Formwork Images

 

Timber Beam with Competitive Price and High Bearing Capacity

 

Timber Beam with Competitive Price and High Bearing Capacity

 

 

 

4. Table Formwork Specifications

 

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5.FAQ of  Table Formwork

   

1) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

Q: The combination form of bowl buckle type common scaffold?
Bowl buckle type steel pipe scaffolding erection requirements of bowl buckle steel pipe scaffolding column spacing is 1.2m, the vertical distance according to the scaffolding load can be 1.2m, 1.5m, 1.8m, 2.4m, step distance is 1.8m, 2.4m
Q: The bowl locking conditions of scaffolding, to detect what hand to try, or with what tools?
Now the general approach is to use artificial eye detection
Q: PLEASE HELP!!!
A brick is dropped from a high scaffold. What is its velocity after 2.9 s? As an object fall, neglecting air resistance, its velocity increases 9.8 m/s each second. Final velocity = Initial velocity + 9.8 * time Initial velocity = 0 m/s Final velocity = 0 + 9.8 * 2.9 Final velocity = 28.42 m/s
Q: describe Vygotsky’s contribution to our understandingof cognitive development? What is scaffolding?
Cognitive development is the growth of a child when they have sexual urges
Q: The latest version of the external scaffolding erection norms and template engineering construction quality acceptance specification which two ah? Thank you
The current template specification is JGJ162-2008 "construction formwork safety technical specifications"; belong to the high formwork project also must obey GB50666-2011 "concrete structure engineering construction code" fourth chapter
Q: I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
For the convenience of calculation, the working group can according to the corresponding standard scaffolding scaffolding load, the statistics range and ETA lambda value, compiles "m table for the reader to use
Q: What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
Q: A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
If the scaffold weight is uniformly distributed, each rope will support one half of the weight. Left reaction = 95N Right reaction = 95N The 710N worker is standing closer to one end (assume left). Sum moments about the left end = 0 1m * 710N - 3.3m * Right reaction = 0 Right reaction = 710/3.3 = 215.2N Sum forces in Vertical direction = 0 Left reaction = 710 - 215.2 = 494.8N Sum all forces Left reaction = 95N + 494.8N = 589.8N larger tension force Right reaction = 95N + 215.2N = 310.2N smaller tension force
Q: Full house scaffolding height of more than the number of meters experts need to do?
The height of the erection of the frame is more than 24m, and only need to be designed and calculated according to the regulations.
Q: I have my belly button pierced as well and didn't think that hurt, how would you compare it to belly button piercings?
its not that bad, i found the front hurt more than the back, but it's really not that bad.. you will feel it though, compared to the belly

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords