• Timber Beam formwork with Lower Cost and High Efficiency System 1
  • Timber Beam formwork with Lower Cost and High Efficiency System 2
Timber Beam formwork with Lower Cost and High Efficiency

Timber Beam formwork with Lower Cost and High Efficiency

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
500000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Durable formwork H20 timber beam for support

1.Diameter of inner tube: 40mm,48mm,etc. 

2.Diameter of outer tube:  48m,56mm,60mm etc. 

3.Wall thickness:1.6mm,1.7mm,1.8mm,2mm etc. 

4.Adjustable length:heavy duty 1800-3200mm,2100-3400mm,2200-3900mm ,

   2200-4000mm,3000-5000mm,3500-4000mm etc.        

   light duty 1600-3000mm,1800-3500mm,2000-3500mm etc.  

5.Base plate:120*120*4mm/4.5mm/5mm,150*150*6mm 

6.Shape of base plate:flower or square 

7.Surface : paint,hot dipped galvanized,pre-galvanized,electrical galvanized    

8.Type:with hands cup or open thread 

9.OEM service is available

10.Package:in bundle or in bulk                 

 

Heavy duty prop 

MIN

MAX

Inner tube

Outer tube

1.8m

3.2m

48*2.0mm

60*2.0mm

2.1m

3.4m

48*2.0mm

60*2.0mm

2.2m

4.0m

48*2.0mm

60*2.0mm

2.4m

3.9m

48*2.0mm

60*2.0mm

3.5m

4.0m

48*2.0mm

60*2.0mm

3.0m

5.0m

48*2.0mm

60*2.0mm

 

Light duty prop 

MIN

MAX

Inner tube

Outer tube

1.6m

3.0m

40*2.0mm

48*2.0mm

48*2.0mm

56*2.0mm

1.8m

3.5m

40*2.0mm

48*2.0mm

48*2.0mm

56*2.0mm

2.0m

3.5m

40*2.0mm

48*2.0mm

48*2.0mm

56*2.0mm

 

Timber Beam formwork with Lower Cost and High Efficiency

Timber Beam formwork with Lower Cost and High Efficiency


Q: What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
Q: The difference between the scaffold and the scaffold
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
Q: Advantages and disadvantages of climbing frame and floor type scaffold
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
Q: The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q: What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches