• The ladder System 1
  • The ladder System 2
  • The ladder System 3
  • The ladder System 4
  • The ladder System 5
The ladder

The ladder

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
3000t kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ringlock scaffolding


We have the professional team of experienced design engineering to make perfect design for you.




Characteristics & Applications :


1.Bearing capacity is big and long service life, up to 20 years.

2.High material utilization, safe and reliable.

3.Flexible use and it is very  fast to set up.

4.Not easy to lost (consumption).

5.Transportation is convenient, easy to manage.

6.It is beautiful and clean.


Market:


The products are exported to all countries around the world,such as The United States, South Korea, Malaysia, India, England, Cambodia, Australia.










Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q: has anyone done this? Does this work out really well?thanks,Chad
My dad's been talking about doing this on his property. Might spook the deer at first, so put it up well ahead of time
Q: Another from the ministry of silly questions…I’d like to support a lightweight tarpaulin over my back yard. Single slope, high side attached to the house and low side attached to a scaffolding pole, running horizontally between two walls. Fair weather, no high winds or pooling. The run of pole would be 8 meters. The longest poles seem to be 6m, so I need to use a coupling. Will this be strong enough – ish? I imagine the most stressed point would be just around the edges of the coupling, so If I used two joints/couplings in the bar, wouldn’t I half the strain on a single one?Also if I made the joints at 1m and 7m would that be better than to have a joint in the middle where the most flexing will be?Also bit more expensive, but with Aluminium the bar will be 20kg lighter – buy will it be as strong joint wise?Will a tubular coupling be as good as a external one?If anyone knows.. Thanks!
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q: What are the specifications for the setting of the wheel - fastener scaffold
Technical code for safety of steel tubular scaffold with couplers in construction
Q: I have already got a cartilage piercing, and I was considering getting a scaffold bar. I don't mind pain, but soon as it was in an unusual place, I was just a little bit curious.
I even have had 31 piercings performed and that i think of that lip piercings harm decrease than scaffold piercings through fact the therapeutic technique is longer in Scaffold piercings. bypass get the lip piercing performed! :)
Q: I got my scaffolding piercing yesterday (a bar through the cartilage) and when i woke up this morning there was quite a lot of blood, i mean like there was big clumps of it around the holes. I've cleaned it up and it seems to look okay and it isn't any more painful than when i got it done yesterday. Is this normal?Thanks (:
well when i got my lip pierced idk if this is the same thing but when i woke up the next morning there was blood on my pillow, my face, and running down my neck and now its fine just be sure to clean it every day and it should be fine
Q: i work in construction.
Yes!
Q: What are the components of the bowl buckle joint in the bowl buckle scaffold
What are the form and structure of bowl buckle scaffold?
Q: Now there are many kinds of scaffolding market, like what wheel buckle scaffolding, scaffolding, scaffolding, what. I would like to buy a large number of scaffolding, and then lease out, which type of scaffolding to buy what is better?
. That is the fastest, most new type of scaffolding, especially if you want to have to lease it, scaffolding is more appropriate.
Q: What kind body jewlery would match a scaffold piercing?
Anything as long as you match silver with silver and not with gold

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords