TCP6022 Topless Tower Crane
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
· Customer can tell Masan the detailed specifications and Masan can make the suitable products for customers.
· Manufacturing Year: 2014
· Jib Length: 60m
· Free Height Under Hook: 50.7m
· Max. Load: 10T
· Tip load: 2.2T
· Mast Section Dimension(m): 2x2x3(L66)
· Hoisting Speed(m/min) & power: 0~85 45Kw frequency
· Slewing Speed (r/min) & power: 0~0.8 2x5.5Kw frequency
· Trolleying Speed (m/min) & power: 0~58 7.5kw frequency
· Cable specification: 3x25+2x16
· Power Supply: 400V(+6% -10%)50HZ
- Q:Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
- The type of "QTZ100" indicates the hoisting tower crane with nominal lifting torque up to 1000KN.m;5610, 5613, 6015 and so on model meaning is, the first 2 digits indicate effective variable amplitude length, the unit is m, and the latter 2 for the largest amplitude of gravity, the unit is KN.These two models do not have any objections, can be converted, not the latter way of expression is more reasonable, and by the current domestic manufacturers widely used.TC5610 nominal lifting torque to 630KN.m, but not up to 800KN.m, so it should be considered QTZ63 series.TC5613 nominal lifting torque reached 800KN.m, but not 1000KN.m, so divided into the QTZ80 series.TC6015 nominal lifting torque reaches 1000KN.m, so it is divided into QTZ100 series.
- Q:What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
- Any modifications to a crane or other hoisting device should be checked with the manufacturer or designed by an Engineer schooled in the proper discipline IE: not an electrical or nuclear engineer.
- Q:In Scottsdale AZ I have never noticed them before this year. They are on the walls all around our doors.
- Crane FLIES not cranes. The winter crane fly has an abundant hatch--well, during early spring or late winter. In this they are just everywhere--this species just does this sort of thing. Typically crane flies are a rather rare sight, such as during the summer months, usually of an entirely different species. There's really not much to explain their abundance.
- Q:Please write in days, hours, weeks, etc.I need math help!!!!
- 7*60 / 60 + 11/60 = 420+11 / 60 = 431/60 seconds to make 1. 431/60 * 1,000,000 = 431,000,000 / 60 = 43,100,000/6 = 21550000/3 seconds. 21550000/3 / 60 = 21550000/180 = 2155000/18 = 1077500/9 minutes 1077500/9 / 60 = 1077500/540 = 107750/54 = 53875/27 hours 53875/27 / 24 = 53875/648 = 83.14040987654320987654320... days. 0.1404098765432098765432...*24 = 3.37037037037037... hours. .37037037037037037... *60 = 22.22222222222... minutes 0.2222222222222*60 = 13.333333333333333 seconds. 83 days, 3 hours, 22 minutes and 13 1/3 seconds.
- Q:Describe how a bottleneck event reduces genetic diversity in a population, and specifically how this has affected the current population of whooping cranes in the U.S
- Well, a bottleneck reduces the number of organisms in a population or species down to a much smaller number than previously existed. In the case of the whooping crane, the species underwent a bottlenck event (although what it is I'm not sure), leaving us with less than 12 individual birds. The more widely accepted number of 6-8 birds has given rise to the several hundred whooping cranes alive today. Since only half a dozen sets of genes were used to create the several hundred, there is not much genetic variability.
- Q:how do cranes get assembled ? on building sites?
- They use hydraulic mobile cranes, (they're telescopic). I watched a crane being disassembled on a building site near my home. How did they do it before they had these mobile cranes? In Switzerland, in places where there are no roads they use helicopters.
- Q:Also, could anyone give me a site with a detailed behind the scenes look on different types of freight ships? I hold a strong interest in the shipping sector and being unsure on little details like these annoy me. Thanks!
- ? ? ? Onboard Cranes from the cabs on each Crane , where'd you think from ?
- Q:Is there a world record for making paper cranes?
- Yes! To commemorate the fiftieth anniversary of the dropping of the atom bomb on Hiroshima, two hundred thousand folded paper cranes were completed by December 15th 1995. Each crane had someone's name and peace message written on it. The intention is to preserve them to hand on to the 21st century. The event was sponsored by the Hiroshima International Cultural Foundation. There are other cool facts at the website below like the world's largest paper crane, most cranes in one hour, etc.
- Q:Notice of tower crane
- Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
- Q:I need help making a origami crane that can flap his wings.
- These okorder It takes quite a few tries to get it right, but once you do it is easy.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TCP6022 Topless Tower Crane
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords