TC7021(QTZ250) Self Erecting Tower Crane Accessories
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our tower crane TC7021(QTZ250) Self Erecting Tower Crane Accessories:
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our tower crane TC7021(QTZ250) Self Erecting Tower Crane Accessories:
1, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our tower crane TC7021(QTZ250) Self Erecting Tower Crane Accessories:
Item | Parameter | ||||
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 40/45/50/55/60/65/70 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 12 | ||||
Tip load @ 70m(t) | 2.1 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-3 | 0-6 | 0-6 | 0-12 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF250-4-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 23.6 | ||||
Mast section size(L×W×H)mm | 2000×2000×3000 | ||||
Working temperature | -40-+60°C | ||||
Total power(KW) | 95 | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V/146A | ||||
FAQ TC7021(QTZ250) Self Erecting Tower Crane Accessories;
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: What do you do to become a crane operator, do you go to school and how long is it?
- OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
- Q: I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
- This Site Might Help You. RE: What happened to Seneca Crane in the Hunger Games? I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of...
- Q: When the earthquake happened, the children wanted to know what they could do to inform other students and raise awareness for the people in Japan. So, we decided to do a show on the earthquake, and to also making the cranes, the origami cranes.thank you! a foreigner. (detail)
- To also make the cranes is the correct way to say it. To also making the cranes is incorrect.
- Q: How to build a tower crane?
- Nowadays, most tower cranes used in construction sites have self lifting function, but they can not leave the coordination of cranes when they are installed.Here's the tower crane installation:1, track laying: few walking tower crane, if the working position is not changed in a stage, rail crane fixtures will be locked.Some tower cranes have no running wheels, and the tower cranes are installed directly on the required basis.2. Install the tower crane chassis parts: installation requirements, installation, and placed in the location of the weight block.3. Install the basic tower, revolving parts and tower cap.Each tower crane has the basic height of the tower installation, the installation height of the rotating device and tower cap, these work is the use of sufficient lifting capacity of the car crane to complete.
- Q: What is a typical hourly wage, and what kind/how much training is required? Is there a special certificate that you have to get, sort of like a driver's or pilot's license? Does it vary much depending on what type of crane (track crane vs. tower crane)?
- Before you can operate a crane, you have to possess a trade certificate from a licensed agency. And before you got one, you have to undergo training and it depends on the extensiveness of the program of a licensed agency. the trade certificate is like a license, it has range of machines which you can operate with once license. Salary differs and it is based on hazards of work. A typical example is the crane operator in construction of Burj Tower. Being on the top of the building is not an easy job so the operator will likely receive salary more than a crane operator who is working in a typical high rise building.
- Q: Hey, can someone let me know some more about the support cable on the top of most cranes. Eg. material, what different types are out there etc. Thanks
- its called wire rope. Cables are for electricity and TV.
- Q: He looked so out of his comfort zone at UFC 140. No support from either Silva or Seagal. Which brings me to another question. Why weren't those 2 by his side? Seagal or Silva are always at his side.Jones' height shouldn't be an issue. He should've at least tried to use it.
- He did. Didn't you watch the fight? Here: youtu.be/3awhIoL54fY
- Q: What are the necessary safety devices on a tower crane?
- (1) lift height limit position limiterFor cranes with variable boom angles, the lifting motion must be stopped immediately when the top of the lifting device rises to the 8OOmm at the lower end of the boom.For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately.(2) lifting moment limiter and maximum lift limiter;When the lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped.If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value.When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.
- Q: Does anyone have any info on John B. Crane?
- Do you mean the Lecturer John B. Crane of the Redpath Chautauqua Collection? Thats the only one I know.
- Q: How many tons are tower cranes QTZ125?
- Nominal lifting torque KN ? m 1250Rated lifting torque KN ? m 1300Maximum lifting weight T 8Operating range M 3~60Maximum rated lifting weight t 1.5Maximum lifting speed m/min 80The lowest steady decline speed of m/min is less than or equal to 7Lifting performance two rate lifting speed m/min 80405.6Lifting weight t 248Four magnification lifting speed m/min 40202.8Lifting weight t 488Variable speed m/min 52/26/8Slew speed r/min 0.63Lifting height independent type M 50Attached m 170Design weight t 42.7 (stand height)Counterweight t 21.2The working environment temperature is Co -20 to +40Maximum working wind speed is m/s 20The maximum wind speed at ceiling is m/s 13
Send your message to us
TC7021(QTZ250) Self Erecting Tower Crane Accessories
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords