• Tower Crane Fixed Leg QTZ80 Accessories China System 1
  • Tower Crane Fixed Leg QTZ80 Accessories China System 2
  • Tower Crane Fixed Leg QTZ80 Accessories China System 3
  • Tower Crane Fixed Leg QTZ80 Accessories China System 4
  • Tower Crane Fixed Leg QTZ80 Accessories China System 5
  • Tower Crane Fixed Leg QTZ80 Accessories China System 6
Tower Crane Fixed Leg QTZ80 Accessories China

Tower Crane Fixed Leg QTZ80 Accessories China

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
8T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
1.3T
Span:
56M
Rated Load Moment:
80T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5613(QTZ80) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC5613

 

Free standing height (m)

46

Max height with attachment (m)

150200

Working range can be adjustedm

445056

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 56mt

1.3

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

14.1

Mast section sizeL×W×Hm

1.8×1.8×2.5

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

Loading diagram

 

56m jib length

R

2.5—13.7

14

20

24.9

26

32

35

38

44

50

56

a=2

4t—24.9m

3.80

2.94

2.63

2.36

1.94

1.63

1.38

a=4

8t—13.7m

7.79

4.12

3.92

3.72

2.86

2.55

2.28

1.86

1.55

1.30

 

50m jib length

R

2.5—15.1

16

22

26

27.6

32

35

38

42

50

a=2

4t---27.6m

3.34

2.99

2.70

2.37

1.88

a=4

8t-15.1m

7.48

5.15

4.22

3.92

3.26

2.91

2.62

2.29

1.80

 

44m jib length

R

2.5—16.3

20.9

26

29.8

32

35

38

40

42

44

a=2

4t---29.8m

3.69

3.31

2.99

2.79

2.63

2.48

a=4

8t---16.3m

6.0

4.64

3.93

3.61

3.23

2.91

2.72

2.55

2.40

 

 Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Main Section TC5613 in China

Tower Crane Main Section TC5613 in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
Q: How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
Building Cranes
Q: More specifically, do Sandhill Cranes eat squirrels?
No! They eat fish and amphibians. .
Q: I see crane flies everywhere but I've never seen them eat anything.
Adult crane flies do not eat at all; most adult crane flies only mate and then die. Crane fly larvae are called leatherjackets or 'leatherjacket slugs' because of the way they move and eat roots (such as those of grass in lawns) and other vegetation.
Q: What is the difference between a crane and a crane in a tower crane?
Informal: hoisting signal worker: refers to the signal flag!Cable man: rope!
Q: what are The performance parameters of tower cranes?
The technical performance of tower crane is expressed in a variety of parameters, the main parameters include the range, starting weight, lifting torque, free height, maximum heightand so on; its general parameters are: a variety of speed, structure, weight, size, tail size and gauge wheelbase, etc.
Q: Ask about the lift and transportation of the jack up tower crane
If it implements specialized subcontracting, it shall be organized by the subcontractor. Led by the security establishment or technician, audit professional and technical personnel to audit the Organization Department of the unit by unit technology, construction technology, safety, quality and other departments, and ultimately approved by the signature of the person in charge of enterprises (393 orders), and the general contractor technology are also responsible to approval.
Q: The fight sequence on the construction crane between 007 and villain Molakka was mezmorizing. But would the laws of gravity allow for it to happen in real life? I mean, acrobats perform similar stunts, but could the average super spy and villain?
anything scripted in general is not realistic,
Q: Does anyone have any info on John B. Crane?
Do you mean the Lecturer John B. Crane of the Redpath Chautauqua Collection? Thats the only one I know.
Q: if the crane starts out at ground level and the skyscraper is being built next to it, how does the crane get moved to the top of the building once the skyscraper has been built to the level of the top of the crane? (eg: the crane can reach a height of 30 stories but the building being const. is 100 stories)
it takes two cranes

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords