Steel Coupler Rebar Galvanized Scaffolding Scaffolding Screw Jack Low Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 6000 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Galvanized Scaffolding Scaffolding Screw Jack Low Price
1.Description of Steel Coupler Rebar Galvanized Scaffolding Scaffolding Screw Jack Low Price:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Galvanized Scaffolding Scaffolding Screw Jack Low Price:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Galvanized Scaffolding Scaffolding Screw Jack Low Price:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
- Q:Standard for inspection of portal scaffolding
- 1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
- Q:i got my scaffold piercing 4 days ago and it still hurtsit usually doesn't hurt when nothing touches it, but then with the lightest touch of a finger or anything else, it hurts badly.i just cleaned it with h2Ocean and a q-tip and now it hurts really bad. :|should it not be hurting by now? or is this normal.? if its normal.. how long until it heals/stops hurting like a *****. hah
- go the the dr or you piercer
- Q:Erection of scaffolding accessories
- Erection of scaffolding accessories:Door frame should be installed from one end to the other end of the extension, and layer by layer to change the direction of the set, not the opposite. After the completion of one step, should check and adjust its level and verticality. Scaffolding should be built around the building, continuous, synchronous erection elevation, in the form of a closed structure around the building; if not closed, the scaffold should be added at both ends of the wall.
- Q:Topic?Scaffolding construction program how to doSpecial construction scheme
- 6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
- Q:Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q:It's when u get two ear piercing and there connected by a tongue ring. So question is where can I get it and how old? I'll be gettin it in Rhode island . Please anwser
- I have one and im 12. Im from Tennessee.
- Q:Can you identify Scaffold Grade Aluminum tubing by looking at it.?
- The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
- Q:In the U.S.I live in Illinois as well so... yeah :DThank you!
- I paid around $55 +tip for mine but it varies from place to place...just call the place you plan on going to and ask them how much they charge.
- Q:What is the mobile scaffolding materials
- The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
- Q:Because my friend wants it done but isn't sure :)
- In all honestly, I'd try to talk your friend out of getting that hip piercing. Surface piercings, especially one there, Will reject. I don't mean to sound negative, but have her put two dots where she would want the piercing, and move around as she does daily, she will see how much that area moves. The more movement = the less likely it will heal. They could reject after a month, they could reject after two years. It really depends. No matter how well the piercer, or how well she takes care of it, it will reject. I went to the best piercers in state to get my surface work (sternum, nape) done. I also took care of it by doing sea salt soaks once or twice a day. When that didn't work I used the LITHA (leave it the hell alone) method.The sternum rejected in six months, where the nape was doing great up until that two year mark. Then it started rejecting. If you want to see what a rejecting piercing looks like feel free to send me an Email, I have some pics of my sternum piercing early on - when it started rejecting, then a day or two before I took it out. It honestly looked horrible that few days before I took it out. The piercing place I go to won't do surface piercings on minors, so you have to be 18 for that one in Minnesota. For the scaffold/industrial, you have to be 16 with parental consent and 18 without in the United States.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Coupler Rebar Galvanized Scaffolding Scaffolding Screw Jack Low Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 6000 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords