• Ring Lock Mobile Scaffolding in Construction System 1
  • Ring Lock Mobile Scaffolding in Construction System 2
  • Ring Lock Mobile Scaffolding in Construction System 3
Ring Lock Mobile Scaffolding in Construction

Ring Lock Mobile Scaffolding in Construction

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Ring lock Description 

Ringlock Scaffolding system is the most popular used Scaffolding system in the world.It will greatly reduce the cost because of the following advantages

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

2.Main Features of Ringlock

 It will greatly reduce the cost because of the following advantages

1.Using less pipes

2.Easy to install

3.It can be used again and again for nearly 20years

3.Ring lock product pictures:

Ring Lock Mobile Scaffolding in Construction

 4.Ringlock Product Description

 

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 2.7m

11.45

 5.FAQ

 We have organized several common questions for our clientsmay help you sincerely

1How many Scaffolding your company have

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q: Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q: How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q: Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q: Specification for construction steel pipe scaffolding and construction safety rules?
48mmX3.0mX6m is a national standard, but you can pay attention when you buy the shelf, generally said that they are 3 thick, but the pipe is under the difference, but the number of questions. There are 2.5 under the difference also has a difference of 111 layers of this standard is certainly enough, most of the South with a cover of 20 layers of it, they are basically the same price
Q: i just need to know the age limit with parental permission?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
If so, its hypertrohic scarring, a common occurence in cartilaginous piercings caused by too much jewelry movement/improperly fitted jewelry. It can be treated by applying tea tree oil to the bump once or twice a day.
Q: 21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q: what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q: How to calculate the vertical force of scaffolding
The maximum reaction force of the rod support is calculated, and the maximum bending moment and deformation are calculated under the most unfavorable load arrangement1 load calculation2 Calculation of bending strength: maximum bending moment calculation for large bar weight uniform load and load distribution of the bending moment and the most unfavorable value3 deflection calculation: the maximum deflection is considered as the calculation of the load distribution of the load and the load of the large span

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords