Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube of Low Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube High Quality
1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
- Is the pre embedded parts installation (burial) component hidden in the works inside. Is placed in the structure of casting fittings, for masonry superstructure when the lap. In order to facilitate the installation of engineering equipment based on external fixation. Most embedded parts made of metal, such as steel or iron, can also be used in wood, plastic and other nonmetallic rigid materials.
- Q:I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
- Healing time is generally 6 months. It doesn't hurt to get it pierced but it's very sensitive after its pierced, DO NOT roll the bar around cuz you can damage the cartilage that way, and keep it super clean
- Q:How long is the service life of disc scaffolding?
- Will bring to the construction of a series of security risks, Hunan Billiton Industrial Group Co., Ltd. to provide information is generally 3-5 years
- Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
- The span, the rod step is easy to calculate, I have done the program in general 4.4.8 meters
- Q:Mobile scaffolding accessories prices
- ! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
- Q:Calculation method of complete scaffold
- No matter where we are, we all have time to go with us. It's an eternal departure
- Q:The basic form of external scaffolding
- The limit pin of the upper bowl buckle and the upper bowl buckle is arranged on the steel pipe upright rod according to the 60cm distance, wherein the lower bowl buckle and the limit pin are directly welded on the vertical rod. When the utility model is assembled, the notch of the upper bowl buckle is aligned with the limiting pin, the cross rod joint is inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated. Bowl buckle joints can be connected at the same time 4 bars, can be perpendicular to each other or deflect a certain angle.
- Q:Can you identify Scaffold Grade Aluminum tubing by looking at it.?
- The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
- Q:Bowl buckle type steel pipe scaffolding should set up a few people
- What are the form and structure of bowl buckle scaffold?Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
- Q:So, 12 Days Ago I Went To Blue Banana To Get Scaffolding On My Right Ear. Everything Went Fine And They Did A Brilliant Job. I Clean It With Sea Salt Soaks 2-3 Times A Day And Use A Bit Of Tea Tree Oil After To Help Sooth. I Was Just Wondering From People Who've Experienced This Piercing How Long It Took For Yours To Stop Hurting And The Time It Took For The Swelling To Go Down (: Thank You lt;3
- No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube of Low Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords