• Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm CNBM System 1
  • Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm CNBM System 2
Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm CNBM

Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Description of  Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm

  • Material :Q235

  • Size :M30, M32, M34, M36, M38, M48

  • Surface treatment :Painted, Electro Galvanized, Powder Painted, HDG

  • Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm CNBM

  • Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm CNBM

  •  

  • Solid Base Jack Electro Galvanized M30x400MM/120x120x4mm Futures:

  • Scaffold Adjustable Screw Jack with threaded bar and Cast nut, adjustable to 600mm, designed to fit inside a Standard / Vertical pole to support the load from a standard, and which, in conjunction with a thick baseplate, is used for levelling of Scaffold purpose.


  • We offer the following base jack for scaffolding:

What are your products advantages?

  • Experience: over ten years in scaffolding manufacturing.

  • Quality: Certified by SGS, BS1139, EN74, Local Test Report.

  • Price: Moderate, Reasonable.

  • Service: Friendly and Responsible. OEM service is available.

Q: I couldn't believe it, but yes it happened...
Yes I can. Did you hear about that drunk guy who survived a 17 story hotel fall. I think he ended up having a broken foot.
Q: 21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q: Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
Is to produce weight between each vertical rod scaffolding force
Q: I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
Most piercings need 6 months to fully heal. Industrial will take up to a year to do so. You have to keep the jewelry in and do not take it out ( not even once ) for the whole period of 1 year. This means that you can't hide it for school. You can't put a retainer on also, cause only titanium or stainless steel material are proper for an open wound aka a new piercing. This piercing is not easy to heal and can stay irritated for long. It goes through cartilage and you have to be really careful with the aftercare and the piercer's info if you want to keep the piercing and yourself healthy. You have to be careful and not touch it or play with it and twist it or take it out. You clean this piercing with sea salt soaks or non alcohol antibacterial soap 2-3 times a day. You dry it with paper towels. If you can do the above daily and be extra careful go get it done. Gluck
Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
Mobile scaffolding in general are on the basis of rent by the day
Q: three examples of scaffolding, thanks
As long as you're on the internet, why not just Google examples of scaffolding rather than expecting someone on YA to do your homework for you?
Q: So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
I think industrials look extremely sexy on guys! I have one in each ear, and they cost 75 each ask to get it pierced with a smaller gauge, they usually pierce with 14g and it looks too big on most people and is more likely to bubble over. Im a girl so this wont be a problem for you, long hair really sucks with these piercings so I suggest pinning it back. Get the ear pierced that you are less likely to sleep on, getting it pulled on while you sleep really agitated the piercing. Keep it clean, use medicated or anti bacterial soap at least five times a day. clean it with qtips. uhm that's all I can think of right now. Best of Luck!
Q: Which accessories are included in a movable scaffold
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords