• Shoring Props& Scaffolding Material  Q235,Q215 System 1
  • Shoring Props& Scaffolding Material  Q235,Q215 System 2
  • Shoring Props& Scaffolding Material  Q235,Q215 System 3
Shoring Props& Scaffolding Material  Q235,Q215

Shoring Props& Scaffolding Material Q235,Q215

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Shoring Props& Scaffolding Material  Q235,Q215

 

Heavy Duty Prop

Min

Max

Internal tube

External Tube

1.8m

3.2m

48mm x 2.0mm

60mm x2.0mm

2.1m

3.4m

48mm x 2.0mm

60mm x2.0mm

2.2m

3.9m

48mm x 2.0mm

60mm x2.0mm

2.4m

3.9m

48mm x 2.0mm

60mm x2.0mm

3.5m

4.0m

48mm x 2.0mm

60mm x2.0mm

3.0m

5.0m

48mm x 3.5mm

60mm x3.5mm

Other sizes are also available at the buyers option

 

Pictures

Shoring Props& Scaffolding Material  Q235,Q215

Shoring Props& Scaffolding Material  Q235,Q215

Shoring Props& Scaffolding Material  Q235,Q215

Shoring Props& Scaffolding Material  Q235,Q215


Packaging & Delivery

Packaging Detail:

Standard export package

Delivery Detail:

within 25 Days


FAQ

1) What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

    We can provide fashionable and newest styles for you.

    We can design the artwork for you.

    Please feel free to customize.

 

2) What promises can be done by us?

    If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

    If printing required, please advise asap because the whole set need much more time to complete.

    Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers,

such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.

Q: What is the mobile scaffolding materials
About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully determine where is here, you can find the mobile scaffolding, mobile scaffolding because it is easy to find, but now is not the mobile scaffolding too hard to find. About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully here,
Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
well it depends because some bars are thicker than others, if your changing to a bar as thick as the one you have now then i say about a month is good but if its the slightest bit thicker i suggest you wait maybe 2 months and in the mean time make sure your turning it and wiggling it so after the 2 months go by you can change it to a thicker bar without it hurting
Q: A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q: scaffold, where to buy?
northern tools . 1800-556-7885
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
Q: I got an industrial/scaffold piercing a few months ago and currently have captive bead rings in (The piercer put those in after he pierced it). The piercings are now healed enough for me to change the piercing, and I found an industrial bar on ebay which I'd really like to order. Only problem is, it has two choices on the gauge thickness and length, and I don't know which mine is.The gauge sizes available are 1.2mm (16g) or 1.6mm (14g) , and the length options are 32mm, 35mm, 38mm.Does anyone know which would be the best to get? Thanks.
as always,size does matter. the bigger,the better. go with the biggest size you can get. if they have it in extra huge,this is the size you want.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords