• Steel H frame Scaffolding Materials Q235 System 1
  • Steel H frame Scaffolding Materials Q235 System 2
  • Steel H frame Scaffolding Materials Q235 System 3
Steel H frame Scaffolding Materials Q235

Steel H frame Scaffolding Materials Q235

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Steel H frame Scaffolding Material Q235


Steel H frame scaffolding (PALLETS)

Size:

1219mm X17000mm or 1219mm*1930mm or 1524mm*1700mm


Material:

Q235  

Finishing:

 painted or galvanized ,powder coated


Details:

1)tube size 42mm*2.0mm or 1.8mm and 25.4mm*1.8mm

2)weight of frame 18.5kg or 13KG or as your demand

3)4feet X6 feet or other size can be done also.

4)good quality and good price  


Picture:

Steel H frame Scaffolding Materials Q235


FAQ

1) What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

    We can provide fashionable and newest styles for you.

    We can design the artwork for you.

    Please feel free to customize.

 

2) What promises can be done by us?

    If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

    If printing required, please advise asap because the whole set need much more time to complete.

    Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers,

such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.

Q: I want to know the classification of scaffolding in the building
Material division according to bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.
Q: What are the dangers of scaffolding
Analysis of the types of scaffolding accidents1) the entire frame dumping or local collapse frame2) the whole frame instability and vertical collapse3) personnel from scaffold falling
Q: Calculation method of complete scaffold
Poetry cannot walk unless it is on the edge of the abyssNo matter where we are, there is always the earth, that is the eternal meeting;
Q: Bracket cast-in-place beam bracket must use bowl buckle scaffold, can not use fastener type scaffolding, there is no mandatory requirements, or specification file requirements!
5.2.5, the calculation of the column, a clear calculation of the type of stud.6.2.4, clear the structure of fastener type column.Local documents, it is not possible to regulate, do not allow the use of fastener type scaffolding. But the top of the column, to use the provisions of backwater, specification.
Q: Electric basket accessories are generic
The safety lock is easy to use, safe and reliable, and the roof beam hanging bearing steel wire rope and the safety rope, electric basket the chain on the ground first assembled into the basket frame control sequence and construction method. Then the steel wire rope through the guide rope pulling hoist hole penetrated to the hook direction pressing, back and forth the move can make the basket handle, the handle can bring down the back and forth promotion, back down, but not at the same time trigger handle. If the steel rod chain load-bearing suspender, then put the safety rope and reinforced bar chain hanging in the fixed roof beam, and then, the chain hanging on a chain bar steel link lower hanging basket, using the chain lift. Because the chain travel is limited, so in the process of lifting, has to replace the chain, the chain of artificial lift, such as lifting relay.
Q: What are the common rules for calculating the amount of scaffolding works
The calculation of masonry construction height within 1.35 ~ 3.6m according to the calculation in the scaffold; scaffold height above 3.6m, the independent brick columns are less than 3.6m in height according to the circumference of the core column is built by scaffolding in height according to the calculation; at an altitude of 3.6m and above at the circumference of the core column is built by 3.6m and calculated by single row height scaffolding.
Q: hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q: Bowl buckle type steel pipe scaffolding should set up a few people
Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.
Q: What is the service life of the mobile scaffolding accessories?
In actual use, there are a lot of mobile scaffolding accessories because of deformation, and other reasons, resulting in a lot of scaffolding accessories are not easy to use, or even eliminated. Therefore, the overall life of about 5 years. Therefore, the use of mobile scaffolding accessories should pay attention to the maintenance, so that its useful life to get more, the value of the use of more perfect.
Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484