Semi-Rigid Aluminium Flexible Duct Pipe For Air Conditioner System
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Zhejiang China (Mainland) | Brand Name: | CWhose | Model Number: | Hose |
Type: | Ventilation | size: | 3" ~48" ( 076mm ~ 1200mm). | Item name: | 4"-12" Flexible Aluminum foil ducts/expandable aluminum ducting |
Packaging & Delivery
Packaging Detail: | as per customer's. Duct in duct ,seaworth carton.for aluminum vent hose |
Delivery Detail: | 10-20days |
Specifications
4"-12" Flexible Aluminum foil ducts/expandable aluminum ducting
fireproof and airtight
compressible,Many sizes for choice.
4"-12" Flexible Aluminum foil ducts/expandable aluminum ducting
Aluminum foil duct,air ventilation hose is designed for air-cooling and can be used in different forms of heating and ventilation applications.
This product is made with strong 3-ply aluminum foil laminate to resist puncture and tears. One continuous and corrosion resistant helix wire is placed in the duct wall for structural support. Basically, The perfect cooling channel for your air-cooled reflectors with hydroponics set up.
Data : Standard length :10 M, compressed to either 0.4-0.6M.
Diameter :3" ~48" ( 076mm ~ 1200mm).
Air Pressure:Max 25mm WG (2500Pa or 10"WG)
Air Velocity:Max 25mm/sec (4900 ft/min)
Inner diameter ranges from 2″ to 40″ inches
Length: 10 meters or as your request
Specifications:
Light weight for easy transporatation.
High flexibilit for easy bending , compressible
Resistant to toxic chemicals and dramatic environment.
Easy to install over either round or oval ducting
No for especial tools required utting or fixing
Flame resistant
Excellent resistance to chemicals
Small bending radius
It is robust, durable and lightweight.
- Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
- Fourth, the internal structure of the flexible pipe joints and KRJ internal structure is slightly different, flexible pipe joints without back Taiwan or small back out of the station, while the latter is the big back five, flexible pipe fittings standard clamp type flexible pipe fittings disassembly Of the time can be used grinding demolition, shoulder type flexible pipe joints can not Note: Some units on the market now mix these two products, the purpose is to sell low prices for low-priced products, so you can get more profit margins To ask for the data parameters of the drawings to determine whether the flexible pipe joints or flexible pipe joints
- Q: Does the desulfurization and denitrification equipment use metal hoses?
- Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
- Q: What is the difference between a flexible pipe and a rigid pipe? What types of pipes are used for drainage pipes, heat pipes and gas pipelines?
- Stainless steel corrugated hose is not easy to aging, the two ends of the connection is more difficult to fall off, the safety performance is more reliable
- Q: Will the embedded stove why use stainless steel corrugated hose connection?
- 62-2 meets the requirements 3 The deformation rate of the flexible pipe shall not exceed the design requirements or the provisions of regulation 45 the longitudinal wall shall not appear in the pipe wall, and the annular and other deformation shall be in accordance with regulation 462-3 The requirements of the 4 backfill compaction should meet the design requirements, design requirements, should meet the requirements of Table 463- Table 463-2 Flexible pipe groove backfill site and compaction see Figure 463 Article 462-4 meet the requirements of the general items 1 backfill should reach the design elevation, the surface should be flattened Section 462-5 meet the requirements 2 backfill pipe and ancillary structures without damage, settlement, displacement Section 462-6 Conformity to allowable deviation Average pass rate (%)
- Q: I am sorry to see your answer on Google, can I also pass a copy of my construction and decoration project?
- so much? The Lifting workers, shelves workers, electricians, welders
- Q: How to strengthen the construction management and construction quality control
- You can Google Oriental Rainbow's official website, there are rainbow days cat flagship store and other links will have the price and product display, you can also contact Rainbow customer service, it is recommended that you choose the East Rainbow waterproof products and standardized construction team, the East Rain rainbow is the best quality waterproof listed companies RPUF-371 sprayed rigid polyurethane waterproof insulation integrated system "rain rainbow" spray foam polyurethane waterproof insulation integrated system is made of foam polyurethane foam waterproof insulation integrated material and protective surface layer constitute
- Q: How to effectively deepen the construction process management to improve the quality of construction projects
- Oh there seems to be no. I have not seen on the Internet, if there is a thank you to thank
- Q: The first generation of the tube is that year out?
- Are flame retardant, one is benzene board, one is extruded board. Extrusion board is the latest in recent years, the rise of the new insulation sheet, relative to the benzene board, its advantages are: recyclable, can effectively solve the white pollution; physical foam, the production of small harm to the human body ( Benzene is a chemical foam harmful to the human body). Flame-retardant effect and insulation effect is stronger than the benzene board, divided into: B Mangchuan Cao boiling 丨 degree check sand sausage 1 750 or so, B2 level 550 yuan, (B1 flame retardant effect is flame retardant, B2 is relatively poor) Benzene board than the extruded board of various orders cheaper about 200 yuan
- Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
- On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
- Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
- Masonry structure construction, the number of pole set which several
Send your message to us
Semi-Rigid Aluminium Flexible Duct Pipe For Air Conditioner System
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords