• Aircon Flexible Duct - UK BS Certified Aluminum Flexible Ducting System 1
  • Aircon Flexible Duct - UK BS Certified Aluminum Flexible Ducting System 2
  • Aircon Flexible Duct - UK BS Certified Aluminum Flexible Ducting System 3
Aircon Flexible Duct - UK BS Certified Aluminum Flexible Ducting

Aircon Flexible Duct - UK BS Certified Aluminum Flexible Ducting

Ref Price:
$1.50 / pc get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
50 pc
Supply Capability:
700000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Application and benefits of Flexible Duct

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 

Non-insulated Flexible Duct

Structure: double-layer aluminum foils +1 layer of PET film.

Structure: 1 layer aluminium foil+ 1 layer of PET film

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm
 

Insulated Acoustic Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm
 

Combined Flexible Duct

Structure: flexible duct PVC jacket. 

REMARK: Special structure is available according to customer's requirements

 

Pictures of Flexible Duct  

 

FAQ of Aluminium Flexible Duct:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box. 

 

 

Q: Will metal hose be used on the wastewater treatment equipment?
I think the most Easy to find expert design, rather than the general artisans knowChina's external wall insulation industry portal to provide users with a lot of information, you can refer to the next
Q: For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
Project Name: Construction Lifting Machinery Safety Supervision and Management Provisions Expiry date: June
Q: Does the desulfurization and denitrification equipment use metal hoses?
You are a few classes in the hospital, ah, I finished up
Q: Flexible pipe trench backfill inspection batch quality acceptance record how to fill
Go to the site to run you may have a harvest; The The The The
Q: The sound of water pipes will not produce infrasound damage to the human body?
Most of the polyethylene benzene board insulation, paste the external walls.
Q: How to strengthen the construction management and construction quality control
Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
Q: How is the flexible casing of the fire pond connected to the tube?
Composite tube: in a tube of the tube with more than two electrode system, each electrode system independently through the electronic flow, to achieve their own functions, this tube is called composite pipe
Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
According to the requirements of the "Construction Engineering Safety Protection and Civilian Construction Measures Fees and the Use and Management Regulations", the document shall include at least the following parts: 1. Safety equipment: safety nets, safety belts, helmets, etc .; , The entrance and the edge of the protection facilities: stairs, elevator, channel mouth, reserved hole, balcony around the floor around the roof around the foundation pit, unloading platform on both sides of the platform and the upper and lower access and other security facilities; . tower cranes, external elevators, well frame hoists and other construction works from the construction of the steel, the use of high-quality steel, Heavy equipment and supporting protective facilities; Fifth, the construction of electricity: in line with regulatory requirements of the temporary electricity system, the standardization of electrical boxes, electrical protection devices, power lines laying, foreign protection measures, etc .; six, construction machinery; : Including the construction of lifting equipment and external elevators, safety nets, steel scaffolding and other detection. Ten, safety education and training; nine, safety signs, signs and safety publicity column; ten, civilized construction and environmental protection: construction site fencing and site hard ground, dust control, noise control, drainage measures, , Temporary facilities: including offices, dormitories, cafes, toilets, shower, etc .; . fire equipment and facilities; thirteen, emergency rescue equipment; . foundation pit deformation monitoring; fifteen, underground safety Protection and monitoring.
Q: Is the flexible sleeve of the broken wall used as a second retest?
There is a staircase in the middle of the tower crane, from the stairs began to climb
Q: To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
It should be JGJ130-2001 Ministry of Construction 2001-02-9 approved 2001-06-01 implementation

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords