• Flexible Duct Pipe - Hot Selling Steel Wire System 1
  • Flexible Duct Pipe - Hot Selling Steel Wire System 2
  • Flexible Duct Pipe - Hot Selling Steel Wire System 3
  • Flexible Duct Pipe - Hot Selling Steel Wire System 4
Flexible Duct Pipe - Hot Selling Steel Wire

Flexible Duct Pipe - Hot Selling Steel Wire

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1. high carbon spring wire
2. Wire dia:0.4-13mm

3 .Standard:DIN17223 GB4357-89

4 .Delivery time:15 days 1*20FCL

5 .MOQ:1 Ton

1. Specification

Material

45#,60#, 65#, 65Mn, 70#, 72A, 72B, 80#, 82B,SAE1060, SAE1065, SAE1070

Dia

0.3-13.0mm

Surface

Smooth, phosphated and lead patent heat treatment

Quality inspection of each coil

Tensile Strength, Tolerance, Surface smooth, Torsion,Bending,Winding, Ellipse , etc.

Certificate

ISO9001,ISO14001,SGS,Jiangsu Famous Brand , Excellent Quality Metallurgical Products

Standard

DIN17223/1-1982,GB4357-89 and other standards .

Application

making springs, steel ropes, cable wires, mattress ,banding wire

Coil weight

15KG-200KG per coil or as per your requirement

Packaging

coils, packed with P.P.cloth or according to customers' request.

Dilivery time

15 days for one 20 feet container.

Loading Capacity

Loading about 20tons in one 20's containe

Tensile Strength

High Carbon Steel Wire

wire diameter(mm)

Tensile Strength(N/mm² )

Grade B

Grade C

Grade D

0.20

2150-2550

2400-2790

2690-3090

0.25

2060-2450

2300-2700

2640-3040

0.30

2010-2400

2300-2700

2640-3040

0.40

1910-2300

2250-2650

2600-2990

0.50

1860-2260

2200-2600

2550-2940

0.60

1760-2160

2110-2550

2450-2840

0.70

1710-2110

2060-2450

2450-2840

0.80

1710-2060

2010-2400

2400-2840

1.00

1600-2010

1960-2300

2300-2690

1.20

1620-1910

1910-2250

2250-2550

1.40

1620-1910

1860-2110

2150-2450

1.60

1570-1860

1810-2160

2110-2400

1.80

1520-1810

1760-2110

2010-2300

2.00

1470-1760

1710-2010

1910-2200

2.20

1420-1710

1660-1960

1810-2110

3.00

1370-1670

1570-1860

1710-1960

4.00

1320-1570

1520-1760

1620-1860

5.00

1320-1570

1470-1710

1570-1810

6.00

1220-1470

1420-1660

1520-1760

7.00

1170-1420

1370-1570

8.00

1170-1420

1370-1570

9.00

1130-1320

1320-1520

10.00

1130-1320

1320-1520

11.00

1080-1270

1270-1470

12.00

1080-1270

1270-1470

13.00

1030-1220

1220-1420

 *Chemical Composition

Steel Grade

GB Standard

Carbon

%

Silicon

%

Manganese

%

Phosphorus

%

Sulphur

%

Chromium

%

Nickel

%

Cuprum

%

60#

0.60-0.61

0.18-0.22

0.52-0.59

0.012

0.007

0.06-0.07

0.05

0.18

65#

0.65

0.21

0.56

0.013

0.008

0.05

0.04

0.14

65Mn

0.60-0.70

0.10-0.25

0.70-1.00

0.030

0.030

0.20

0.20

0.25

70#

0.69-0.71

0.19-0.21

0.53-0.58

0.010-0.012

0.003-0.006

0.01-0.05

0.02-0.04

0.04

72A 72B

0.72

0.19

0.71

0.013

0.006

0.02

0.02

0.03

80#

0.80-0.81

0.22-0.24

0.59-0.76

0.008

0.004

0.04

82A 82B

0.82

0.24-0.25

0.76-0.77

0.011-0.014

0.004-0.007

0.17-0.17

2. Packing

Small coil or large coil for the steel wire : Coils, packed with P.P.cloth or according to customers' request

Z2 packing :200-350KF per coil

Iron spool or wood spool for the steel wire

3. Our service

Sample order: we supply you free sample, you pay for the express cost, which  can be shipped in 3 days

Our promise: Send you a workable price ;

Delivery in time;

Service you in lifetime for free;

Full refund if substandard goods

Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
Flexible pipe with metal materials, such as metal mesh, organ, etc
Q: We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
Construction workers classification and breakdown of ordinary types of work
Q: How to optimize the construction management to improve the quality of construction projects
I suggest you look at Google, there will be a lot, I hope you can find a satisfactory, I wish you a happy life!
Q: What is the difference between a rigid sleeve and a flexible sleeve?
Can be from these aspects, 1) energy saving: wall insulation materials, thermal insulation doors and windows, external shading equipment, renewable energy facilities (such as solar hot water, light guide tube, ground source heat pump), energy saving lamps 2) : Water-saving equipment, rainwater harvesting and utilization facilities 3) Materials: 3R material building energy saving In addition to the material, but also consider the small radical engraved moxibustion Chong Chong Yi wipe design, management, control and other issues.
Q: I am sorry to see your answer on Google, can I also pass a copy of my construction and decoration project?
The difference between a flexible pipe and a rigid pipe is that the flexible pipe causes a change in the temperature of the working fluid due to the fluid or medium in the pipe or the temperature of the working environment, resulting in expansion and expansion of the pipe, causing some changes in the pipe itself, Within the scope of the pipeline itself will not cause damage. Such as plastic pipes, metal pipes. Rigid, such as concrete pipes, such as flues, exhaust shafts. Gas and heat is definitely a metal tube.
Q: Why should the flexible hose be set in the mechanical ventilation system?
Bowl buckle price is high! There are many buckle-style markets, so rent up cheap!
Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long and 4m each) and the fasteners are transported to the hanging plate of the frame
Q: Two hundred galvanized pipe should be under the large flexible tube
Expanded polystyrene board is a common white foam board; this foam board is formed by foaming. The extruded polystyrene board is a color foam board (common colors: gray, blue, yellow, green, etc.); this type of foam is lack of dumplings dumplings. In other words, in addition to color, the production process is the difference between the focus.
Q: Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
EPS board (also known as benzene board) is made of polystyrene board abbreviation. There is raw materials through pre-hair, curing, molding, drying and cutting made. It can be made into different density, different shapes of foam products, but also can produce a variety of different thickness of the foam sheet. Widely used in construction, insulation, packaging, refrigeration, daily necessities, industrial casting and other fields. Can also be used to display the venue, merchandise cabinets, advertising signs and toys manufacturing. At present, in order to meet the national building energy efficiency requirements are mainly used in wall insulation, external wall insulation, to warm.
Q: Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
First of all, the main structure of the construction to be reserved when the knot point, and then with the foot of the lack of rush to maintain the use of steel pipe, the so-called hard link. Combined with the external wall fastener type steel scaffolding specifications

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords