Flat Scaffolding Jack Base
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500000根 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffolding Jack Base
1.Steel material: Q235
2.Length:Customized.
3.Hollow .
4.Shpae of base: U head, plain head.
5.Surface treatment: Oiled Color painted, Hot dip galvanized, Electro galvanized
6.Usage:Scaffolding part, adjusts the balance of scaffolding frame.
Adjustable Scaffolding Base jack
Size: 35/38x4mm, 143x143x5/6mm, 600,914,1524mm
Material: Q235
Surface finish:painted,galvanized
Type: base jack, top jack
Diameter: 30mm, 32mm, 34mm, 36mm, 37mm, 38mm, 40mm
Length: 400mm, 600mm
Base plate: 140*140*5mm
OEM service provided
Screw Jack Base
Dimensions: Diameter 35/38mm, Base plate 143x143x5/6mm, length 600,914,1524mm
Item | Screw Jack Base |
Material | Q235 |
Dimensions | 35/38mm, 100x150mm, 600,914,1524mm |
Surface | Hot-dip galvanization, electro galvanization ,or as your request |
Standard | EN74 |
Note | OEM service is available |
MOQ | 1000pieces |
Package | in steel pallet, or as your request |
Payment Terms | TT,L/C, we can contact in detail |
Delivery Time | 20-30days |
Feature of screw jack base:
1) Base plates provide extra stability.
2) Enables safe use on uneven ground.
3) Galvanization for long lasting protection.
4) Elements safely connected.
Type: base jack, top jack
Diameter: 32mm, 34mm, 38mm
Length: 400mm, 600mm
Base plate: 120*120*5mm, 140*140*5mm, 150*150*6mm
OEM service provided
- Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
- So do the project budget review work, will help improve the design level and investment efficiency
- Q: - Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
- In the late 1950s, oil wells were specially developed for oil
- Q: Why the height increase of ten centimeters increase in housing ten percent
- Jian'an cost is the cost of housing construction and housing equipment installation costs for short
- Q: For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
- Hello, "farmers from the building, the most important is the quality and safety
- Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
- First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
- Q: Can the fifteen typhoon blow up the three - storey house?
- Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
- Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
- Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
- Q: Sprinkling water on the construction helps to help reduce haze days
- to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
- Q: I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
- They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Send your message to us
Flat Scaffolding Jack Base
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500000根 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords