• Scaffolding with The Best Quantity Quick Assemble System 1
  • Scaffolding with The Best Quantity Quick Assemble System 2
Scaffolding with The Best Quantity Quick Assemble

Scaffolding with The Best Quantity Quick Assemble

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
15000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.


2.   Main Features of Cup-lock Scaffolding

     .Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding,            props, etc. Applied to high-rise building, bridge, water tower, and so on.

     .Avoid using bolt in assembly and low down labor intensity

    .Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

    .Not easy to lose fastener, portable firm and easy to maintain and transport

3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

   .There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

   .5 times fast of adapter plug assembly and disassembly than normal

   .Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

.We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

  . If printing required, please advise asap because the whole set need much more time to complete.

  . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

   .Packing:  As Customer's Requirements

  .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Q:im 15 and i really want scaffolding, but i was wondering if it hurts like looooooads... has anyone got it done? did it hurt alot? and also can it get infected real bad?
yesh! and it takes over a year to heal, it hurts to sleep on that side of your head also in the cold it stings (: but if you really want it, get it.
Q:The bowl locking conditions of scaffolding, to detect what hand to try, or with what tools?
Now the general approach is to use artificial eye detection
Q:What is scaffolding pole, bar, scissors support?
Bowl buckle steel pipe scaffolding when using steel pipe, as a single steel scaffolding, when the use of steel when the edge of the cross bar, for the steel based scaffolding
Q:What is the bowl buckle scaffold, bowl buckle scaffold what are the characteristics?
The vertical rod is installed on the 48mm 3.5mm steel pipe with a certain length diameter of 0.6m x, and the welding rod is welded on the top. Vertical bearing bar for scaffold;
Q:JGJ 130-2011 also has a carpenter scaffolding specification, who has to share the upload thank you
Technical code for safety of steel tubular scaffold with JGJ 128-2010 construction
Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Should be less than or equal to 3 times the vertical pole of the scaffolding.
Q:Hi my next door neighbours are building an extension to their house. The builders asked if we would allow scaffolding to be placed on part of our driveway. Now, these builders are taking too long and the builders attitude is rude when questioned how long they gonna take to finnish. If we want the scaffolding to go, what righs have we got as we gave verbal permission to the builders to have it put up by scaffolders and the planned extension not yet completed?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q:Bowl buckle scaffold construction needs to pay attention to what problems
Arrange training for the erection of timberman. ?Set up, when the demolition of the establishment of warning signs, assigned to monitor. ?Erection is completed, after acceptance of the listing.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
think of statics (in terms of forces and torques): because of fact the gadget is in equilibrium, the sum of the forces = 0 and the sum of the torques = 0 on the grounds that sum of forces = 0, then: ft(left) + ft(suitable) - Fg(scaffold) - Fg(employee) = 0 on the grounds that sum of torques = 0, then: -Set some element as your axis of rotation. for my area, I set between the ft as my axis. to that end, my torque equation will become ft(suitable)(2.ninety m) – Fg(scaffold)(a million.40 5 m) – Fg(employee)(a million.ninety m) = 0 you already know Fg(scaffold), Fg(employee), so resolve for ft(suitable). Plug this value into the tension equation and resolve for ft(left).
Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from the left end. What is the tension in the left hand side wire?(g = 9.8 m/s2)Answer in newtons
85kg. is 42.5kg each cable. 6.4/1.4 = 4.571:1 ratio. Add both sides. (440/5.571) x 4.571 = 361kg. Add the 42.5, = 403.52kg. 403.52 x 9.8 = 3,954.5N tension in left cable.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords