• Scaffolding System- "U" head        CNBM System 1
  • Scaffolding System- "U" head        CNBM System 2
  • Scaffolding System- "U" head        CNBM System 3
Scaffolding System- "U" head        CNBM

Scaffolding System- "U" head CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: CS-UH

  • Material: Steel

  • Surface Finish: paint/galvanized

  • Type: Formwork head

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description

Model No: FAS-DG

Product Name: Facade Scaffolding System--Double Guardrail

 

3.Feature:

1. Made of Φ33.7mm x 2.25mm thickness steel tube and rectangle tube,

    Length(mm): 1570/2070/2570/3070.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requirement.

 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding System-

Q: There is a 5.0 kg pail of paint to one side, as shown. How close to the end can he approach safely? Express your answer using two significant figures. If there is more than one answer, separate them by commas.
I am looking for as shown, as I am not psychic.
Q: How to carry out fire inspection at construction site construction site (including information and site)
the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
Q: A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q: Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q: (Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q: Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety
Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding load shall not exceed 270kg & nbsp; # 47; m
Q: How to do a good job of typhoon during the mass transfer mobilization work
Such as: all kinds of dangerous housing, plant, shed, temporary buildings (such as walls, etc
Q: I would like to know what the scope of responsibility for the construction engineering supervision is specific
The definition of project supervision responsibility is a longstanding problem that has long plagued the supervision industry
Q: I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches