• Scaffolding System- "U" head        CNBM System 1
  • Scaffolding System- "U" head        CNBM System 2
  • Scaffolding System- "U" head        CNBM System 3
Scaffolding System- "U" head        CNBM

Scaffolding System- "U" head CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: CS-UH

  • Material: Steel

  • Surface Finish: paint/galvanized

  • Type: Formwork head

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description

Model No: FAS-DG

Product Name: Facade Scaffolding System--Double Guardrail

 

3.Feature:

1. Made of Φ33.7mm x 2.25mm thickness steel tube and rectangle tube,

    Length(mm): 1570/2070/2570/3070.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requirement.

 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding System-

Q: Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q: Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q: The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q: On the issue of compensation after the event of force majeure
The cleaning and repair costs of the works do not include scaffolding
Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
There are columns: pipe pile, frame column, independent column, structural column, Cylindrical, L-shaped columns; brick columns, concrete columns, wooden columns Beam: frame beam, connecting beam, over beam, ring beam, cantilever beam, curved beam; steel beam, wooden beam, concrete beam Plate: cast-in-place board, prefabricated flat plate, prefabricated hollow plate; reinforced concrete plate, wood board Wall: brick wall, concrete wall, roof daughter wall, light partition Doors: solid wood doors, plywood doors, steel doors Windows: steel windows, wooden windows, aluminum windows, steel windows Building accessories are construction and construction components other than building blocks, such as scaffolding, pipe thread regulators for construction, construction bars, triangular construction supports, and steel joints
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
That is, the upper and lower with a pump on the 90-degree bend, the two of them with the root 1 m straight tube connected to each other, and the other round steel to do two large diameter 18 meters, and then some straight round 2 large circle made of a hoop, and then the two straight with elbow straight fixed Below the elbow tow pump up the pump tube, the top elbow root 2 m straight tube It can be in the range of 4 meters to rotate the fabric, such as to move the car can be used in place
Q: How to do a good job of typhoon during the mass transfer mobilization work
Such as: all kinds of dangerous housing, plant, shed, temporary buildings (such as walls, etc
Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
this could be a 2d concern. The moments approximately any factor interior the gadget would desire to stability, in the different case the gadget (scaffold) would rotate. additionally, the vertical forces would desire to stability, or the gadget (scaffold) would translate. it form of feels to me that to the superb from the middle of the scaffold it somewhat is a distance one 6th of the dimensions of the scaffold is comparable to saying 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any factor. i will evaluate the left facet of the scaffold, the place the 2d produced by the left rope is 0. comprehensive M = 0 = scaffold M + guy M + suited rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is considered a factor mass located at its center the strain F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign remedy for F. To get the strain in the different rope, you are able to basically evaluate the vertical forces interior the gadget. on the different hand, you should sum the moments approximately another factor (say, the superb rope). wish this permits.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches