• Scaffolding System- Aluminum Platform CNBM System 1
  • Scaffolding System- Aluminum Platform CNBM System 2
Scaffolding System- Aluminum Platform CNBM

Scaffolding System- Aluminum Platform CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS-WP

  • Type: Scaffolding Parts

  • Scaffolding Part Type: Scaffolding Planks

  • Main material: Plywood and aluminium

  • Advantage: Light weight with heavy load

  • Hook: "U" and "O"

Scaffolding System- Aluminum Platform CNBM

2.Packaging & Delivery

Packaging Details:pallet

Delivery Detail:

3.Product Overviews

Model No: RS

Product Name:   Galvanized Ringlock Scaffolding System

4.Features:

1. Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,

2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

3. Ring: Made from cast-steel or pressed steel

4. Ledger connection-peg: made from cast-steel,

5. Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

6. U head screw jack: length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.

7.  Surface: painted/electro (hot dipped) galvanized or to be order

8.  Also can manufacture it as your requirement

 

5.Basic Components

 

6.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

7.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:im asking this because when i get back to school in september i will probably need to take it out for PE once a week in the mornings if thats possible, i cant tell my teacher that i cant do PE because if they found out i had the piercing they wold ask me to take it out as its school rules to not have any piercing other than the lobes.so should i even get it, i really want it.
3 months to a year. Go for it! I got mine last week. let me tell you, everyone is lying when they say it hurts. It'll hurt a little more than your lobes, but not much. What really hurt was when he put the bottom ball on wrong, and couldn't get it off for 15-20 minutes. Here he was playing with a fresh piercing, gripping the middle of the barbell. I was just sitting there with one of those, Whaaaaaa...? expressions on my face. But you're piercing would be okay. I would just leave your hair down, and you'd be fine. Because it would hurt to take it out and you won't wanna irritate it. So I'd try leave it in, until at least early November. Then you can take it out/ put it back in all you want. sleeping on it is no problem, it doesn't hurt, it just feels weird. Like, you can feel the bar, what angle the bar is at, and where the balls are. It's.. weird. Have fun! remember to clean it!
Q:The main load-bearing structure of the bridge is a hole L0=36 m reinforced concrete arch, with a total width of 3.4 meters, the highest to the lowest level of 17 meters, the use of bowl buckle scaffolding, scaffolding longitudinal 0.6m, transverse 0.9m, step 1.2m. Help me to calculate the bearing capacity of ah thank you!
Fulcrum spacing is 60cm longitudinal timbers, fulcrum M, square distance is W then according to uniform load distribution Q=p/wThen according to the number of cross W-1 span continuous beams with calculated Pmax and MmaxIn the calculation of I, W, E the final Mmax/W< limit stress but also to calculate the degree of winding </1400L (I value according to the size of the calculation, i=bh^2/6)The first layer of wood even finished the calculationThen go down and check it outThe second layer is the fulcrum of wood 90cm
Q:Okay I have some questions:-When I get it done can I have- 2 labret retainers put in to hide them from my school?-If I can, how discreet are the retainers?-How long to heal? (Even though the piercer will tell me)-Have you got a picture of a scaffolding piercing with retainers? May I see it (:-And a basic clear cleaning regime?Thankyous (: x
You could but it be best for a bar to be honest. Well retainers are clear and depending on your skin complexion it may be difficult or easy to detect. Industrials hurt I'm not going to lie. It look forever for mine to finally heal enough to wear i can lay on it. Your ear will throb and it will hurt like hell to touch it. The pain goes on for a couple of months. Sorry I have no pictures. For cleaning- Sea salt and warm water.
Q:Now there are many kinds of scaffolding market, like what wheel buckle scaffolding, scaffolding, scaffolding, what. I would like to buy a large number of scaffolding, and then lease out, which type of scaffolding to buy what is better?
. That is the fastest, most new type of scaffolding, especially if you want to have to lease it, scaffolding is more appropriate.
Q:this work wont start till tuesday and the scaffold has blocked my sky tv. am i within my rights to remove this scaffolding?
No you are not within your rights to remove the scaffolding. Call the landlord to see if anything can be done. Or you could read, go for a walk. It is not the end of the world to not have tv.
Q:Scaffolding construction specification is what? Do you know?
Short distance horizontal transportation2, the basic requirements of the scaffold: (1) sufficient strength, stiffness, stability;(2) sufficient area;(3)Safety, high altitude operation requirements;(4)Has the advantages of simple structure, convenient assembly and disassembly; (5) according to local conditions, local materials.
Q:The role of scaffolding and the basic requirements for scaffolding
1, to have enough firmness and stability, to ensure that during the construction of the specified load and climate conditions, no deformation, tilt and shaking2, to have enough area to meet the requirements of material, transportation, operation and walking3, the structure should be simple, erection, demolition and handling to facilitate
Q:How much is the erection height of double row scaffold
Single row fastener type steel pipe scaffold erection height requirements is 25 meters, double row height doubled, is 50 meters.The single row of cuplok scaffolding height requirements on top, is 30 meters. The same double bowl buckle scaffold is doubled 60 meters.
Q:Im going to get a scaffold.how much are they and 1 being no pain and 10 being the worse what would be your rate on the pain 1-10
I would say about a 6 maybe 7... and its a pain for the first few months.. like it gets sore if you lay on it to much ect :)
Q:^^^ thats alll. and does it hurt?
Cost depends on where you go. Pain depends on your pain tolerance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords