• Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal System 1
  • Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal System 2
  • Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal System 3
Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2 m.t.
Supply Capability:
100000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ringlock Scaffolding 

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance. 


Ringlock scaffold has the following features: 


1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection. 
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Main Features of the Ringlock Scaffolding


Place of Origin

Beijing, China (Mainland)

Product Name: 

Ringlock Scaffolding

Custom Code

7308400000

Color

Silver, golden

Surface treatment

Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating

Material

Q235,Q345.etc

Package

Customized Package

Payment Terms

T/T,L/C

Delivery Detail

15-25 Days

Quality Control

IS09001 Certification, Quality Test

Standard

48.3*3.25*4000mm 

Ledger

48.3*3.25*3072mm

Ledger End

1.2kg


Advantages


1)To be erected easily and quickly

2)Installed to different angels with rosettes of

    two different hole being positioned there

3)Ringlock scaffolding provides complete flexibility to lock in any angel.

4)Diagonal braces are to be tailored in 

  accordance with the lengths of vertical and horizontal tubes




Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Specification of Ringlock Scaffolding


     Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

                 Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

    

 

The Standards(Verticals)

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

3000

3/3.25

48

HDG/Painted

2500

3/3.25

48

HDG/Painted

2000

3/3.25

48

HDG/Painted

1500

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

500

3/3.25

48

HDG/Painted

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal 

The Ledgers(Horizontals)  

Effective Length(mm)

Tube Thickness(mm)

Tube Diameter

Surface Treatment

2000

3/3.25

48

HDG/Painted

1770

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

                                              The Diagonal Brace

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

2411

3

48

HDG/Painted

2244

3

48

HDG/Painted

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

                                                       The bracket

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

730

3

48

HDG/Painted

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

                                                               Plank

Effective Length(mm)

Width(mm)

Height(mm)

Surface Treatme

2050

480

45

HDG

1820

480

45

HDG

3000

240

45

HDG

2000

240

45

HDG

1000

240

45

HDG

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

                                         Hollow Head Jack And Jack Base


Length(mm)

Tube Diameter(mm)

Size of Plate(mm)

Surface Treatment


600

38

150*120*50*4

HDG


600

38

150*150*4

HDG


Accessories


Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal


Packing


Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Inspection

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

    Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

       Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

        Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Project


Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal


More Photos

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal

Scaffolding Ringlock Vertical Easy Assembly Top Quality Metal






Q:above the ground by pulling on a rope weighting 6lb/ft. Set up the integral of how much work is required ( only the integrand)? Let x denote the height above ground.What is the total work?
tie 3 concrete blocks to the end of the rope and let that bucket fly up = let gravity do the work
Q:I'm wanting to get a part of my ear pierced in the summer,which should I get,how much do each hurt,what is the healing period for each.I am getting it in the summer so it has time to heal before I go back to school,Help??
I even have the two piercings and function diverse evaluations on the two one in all them. in my opinion the cartilage piercings harm greater and grew to become right into a greater problematic healing technique then the nostril. I even have 3 helix piercings and the discomfort did no longer final to long grew to become into only sore after the preliminary couple days and of path the piercings themselves. My nostril piercing i in my opinion did no longer have any discomfort with it. there grew to become right into slightly pinch and that grew to become into involved approximately me it did no longer harm after in any respect.
Q:In the process of high-rise building construction, bowl buckle type steel pipe scaffolding foundation and foundation treatment should meet the requirements
The foundation and foundation treatment of bowl buckle scaffold should meet the requirements of standard JGJ166.
Q:In my mind it was and still is one of the most dangerous matches in wrestling history in my mind what's your opinion on the scaffold match?
It is an incredibly dangerous match, but that's what makes it such a spectacle. It's almost the same as watching a tightrope walker or trapeze artist at the circus, because there's always that danger of suffering a life-threatening fall if just one coordinated move goes wrong. Go back and watch NWA Starrcade '86 and watch the Skywalker's Match between the Road Warriors and the Rock 'n' Roll Express. Still makes me antsy to this day.
Q:I got my industrial pierced about three days ago. The shop I wanted to go to closed so I went to another one that cost a bit more. The guy who pierced it said to only clean it with warm water, but when I got my helix, tounge webbing and angel bites I was told that all new piercings need disinfectant. What are some disinfectants I could use and am I right by doing this or should I listen to the piercer?
Well you definitely need to use more than just warm water to clean it. Try using something like Provon soap and do sea salt soaks at least twice a day to keep it clean.
Q:I recently had a scaffold piercing. It seems to be healing well, however it is still sore.My body tends to reject piercings, so is there anything I can do to help it heal?I am currently using saline solution taking vitamins.
your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks
Q:i have two holez i the bottom of my ear and now i wanna get something done to the top i want eather a scaffold or a cartlige and a tragus what do you guyz think
well, i'd say cartilidge is the least painful and probably the most convienent out of the three. i did mine by myself a few times and i wasn't in pain at all. i'd reccomend getting it done though rather than doing it yourself. with a scaffold it is easy things to be caught in it like hair or something since it is a bar.. and my friend got her tragus done. it is the first time i've ever seen her cry a ton. i heard it hurts like a mother.
Q:Bridge template support bowl button steel scaffolding, you need to set the sweeping rod
Sweeping rod: part of the scaffolding works, sweeping rod distance from the ground 200mm, connecting the vertical pole of the horizontal rod. Divided into vertical and horizontal sweep rod, play the role of scaffolding stability.
Q:Pankou scaffolding is good for
Pankou scaffolding hot-dip galvanizing process, the use of up to 15 years of age or above.
Q:in the safety scaffolding?
If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords