• Scaffolding Parts-Hot Dip Galvanized Tube Lock System 1
  • Scaffolding Parts-Hot Dip Galvanized Tube Lock System 2
  • Scaffolding Parts-Hot Dip Galvanized Tube Lock System 3
Scaffolding Parts-Hot Dip Galvanized Tube Lock

Scaffolding Parts-Hot Dip Galvanized Tube Lock

Ref Price:
get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
5000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications of Scaffolding Parts-hot dip galvanized Tube Lock:

Scaffolding Tube Lock

Weight:1.40kg

Material: Q235

Item

Scaffolding Tube Lock 

Material

Q235

Dimensions 

1.40kg

Standard

EN74

Note

OEM service is available 

MOQ

1000pieces

Package

 

in steel pallet ,carton, plywood case, or as your request 

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days

Quick Details of Scaffolding Parts-hot dip galvanized Tube Lock:

Place of Origin:  China (Mainland) 

Brand Name:  CNBM 

Model Number:  FF-011 

Type:  Scaffolding Parts  Scaffolding Part

Type:  Scaffolding Tube Lock 

Superior quality and competitive price!

•Model No. JY-E014

•Size: refer to the above pictures

•Material: Q235

•Quality: good bearing capacity/durable&stable/skidproof/easy to assemble&dismantle

•Standard: EN74 BS1139

•Certificate: SGS/ISO9001

Packaging & Delivery of Scaffolding Parts-hot dip galvanized Tube Lock:

Packaging Detail: in steel pallet ,carton, plywood case, or as your request

Delivery Detail: 20-30 days

Scaffolding Parts-Cold galvanized Tube Lock

Size: 1.40kg

Standard: EN74

Material: Q235

Superior quality and competitive price!

•Model No. JY-E014

•Size: refer to the above pictures

•Material: Q235

•Quality: good bearing capacity/durable&stable/skidproof/easy to assemble&dismantle

•Standard: EN74 BS1139

•Certificate: SGS/ISO9001

Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

About us:

A) We have much experience in designing and producing the Building steel pipe props .

B) Our pruducts are widely exported to more than 10 countries and regions and very popular among US , the Middle East, South America and Europe and so on.

C) our mission is "quality priority and customer first" .

Our products and services have received good evaluations from customers.

 

We are specializes in designing & manufacturing of various kinds of  formwork systems, including H20 timber-beam formwork, aluminum formwork, steel (aluminum)- frame formwork etc.

All the equipments & formwork systems produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets

 Scaffolding Parts-Cold galvanized Tube Lock

 Scaffolding Parts-hot dip galvanized Tube Lock

 Scaffolding Parts-hot dip galvanized Tube Lock

 

Q: What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q: The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
Q: Advantages and disadvantages of climbing frame and floor type scaffold
2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q: What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b) Factory Information
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords