Scaffolding Parts-Hot Dip Galvanized Tube Lock
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications of Scaffolding Parts-hot dip galvanized Tube Lock:
Scaffolding Tube Lock
Weight:1.40kg
Material: Q235
Item |
Scaffolding Tube Lock |
Material |
Q235 |
Dimensions |
1.40kg |
Standard |
EN74 |
Note |
OEM service is available |
MOQ |
1000pieces |
Package |
in steel pallet ,carton, plywood case, or as your request |
Payment Terms |
TT,L/C, we can contact in detail |
Delivery Time |
20-30days |
Quick Details of Scaffolding Parts-hot dip galvanized Tube Lock:
Place of Origin: China (Mainland)
Brand Name: CNBM
Model Number: FF-011
Type: Scaffolding Parts Scaffolding Part
Type: Scaffolding Tube Lock
Superior quality and competitive price!
•Model No. JY-E014
•Size: refer to the above pictures
•Material: Q235
•Quality: good bearing capacity/durable&stable/skidproof/easy to assemble&dismantle
•Standard: EN74 BS1139
•Certificate: SGS/ISO9001
Packaging & Delivery of Scaffolding Parts-hot dip galvanized Tube Lock:
Packaging Detail: in steel pallet ,carton, plywood case, or as your request
Delivery Detail: 20-30 days
Scaffolding Parts-Cold galvanized Tube Lock
Size: 1.40kg
Standard: EN74
Material: Q235
Superior quality and competitive price!
•Model No. JY-E014
•Size: refer to the above pictures
•Material: Q235
•Quality: good bearing capacity/durable&stable/skidproof/easy to assemble&dismantle
•Standard: EN74 BS1139
•Certificate: SGS/ISO9001
Quality Control
Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.
About us:
A) We have much experience in designing and producing the Building steel pipe props .
B) Our pruducts are widely exported to more than 10 countries and regions and very popular among US , the Middle East, South America and Europe and so on.
C) our mission is "quality priority and customer first" .
Our products and services have received good evaluations from customers.
We are specializes in designing & manufacturing of various kinds of formwork systems, including H20 timber-beam formwork, aluminum formwork, steel (aluminum)- frame formwork etc.
All the equipments & formwork systems produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
- Q: The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- 2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b) Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Hot Dip Galvanized Tube Lock
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords