SPECIFICATIONS:
1 MATERIAL:Q235
2 SWIVEL AND DOULE RIGHT ANGLE COUPLER
3 DROP FORGED AND PRESSED
4 BS1139 AND EN74 STANDARD
5 SIZE:48.3*48.3MM
6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.
Pressed swivel coupler 1.02kg galvanized/ hot dipped galvanized
Pressed fixed coupler 0.85kg galvanized / hot dipped galvanized
DROP FORGED SWIVEL COUPLER 0.98kg galvanized / hot dipped galvanized
DROP FORGED SWIVEL COUPLER 1.12kg
DROP FORGED PUT LOG COUPLER 0.62KG galvanized / hot dipped galvanized
DROP FORGED SLEEVE COUPLER 1.1KG galvanized / hot dipped galvanized
DROP FORGED FIXED BEAM COUPLER 1.45KG galvanized / hot dipped galvanized
DROP FORGED SWIVEL GRINDER COUPLER 1.5KG galvanized / hot dipped galvanized
7 SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM
8 Payment terms:30%TT deposit, balance against BL copy or LC at sight
9 FOB .CIF.C&F ,CFR acceptable
10 Delivery time;20-30days after receiving deposit
- Q:Fastener type steel pipe scaffold composed of which components?
- 3.3 foot plate3.3.1 foot plate can be made of steel, wood, bamboo materials, the quality of a single foot board should not be greater than 30kg.3.3.2 stamping steel feet of the material should be consistent with the existing national standard carbon structural steel GB/T700 Q235Class steel provisions.3.3.3 wooden foot plate material should be consistent with the current national standard "wood structure design code" GB50005 IIaMaterial requirements. Foot plate thickness should not be less than 50mm, both ends should be set to the diameter of not less than 4mm platingZinc wire hoop two.3.3.4 bamboo scaffold board shall be adopted by bamboo or bamboo bamboo string plate, bamboo; bamboo string amphipodsshouban shouldIn accordance with the existing industry standards "construction of wood Scaffolding Safety Technical Specifications" JGJ 164 of the relevant provisions.3.4 adjustable support3.4.1 adjustable support screw outer diameter shall not be less than 36mm, diameter and pitch should be in line with the current national standard "ladder"Type screw thread GB/T 5796.2, GB/T 5796.3 provisions.
- Q:Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
- Homework is two, while the long rod is 273m; small bar is 51; rectangular fastener 187; butt fastener 55; rotating fastener 17; a 7 foot board 14 square meters. You can use this to derive the amount per square meter. (average length of 5 meters).
- Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
- oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
- Q:In the U.S.I live in Illinois as well so... yeah :DThank you!
- Location Pierced through from the top rim and coming out on the side rim Procedure can be pierced as two separate piercings and then a long barbell fitted when healed , though more successful and comfortable when pierced straight through initially , the barbell then fitting comfortably as guaranteed to line up exactly This can be multiple pierced with barbells sitting parallel to each other, or designed to sit diagonally forming a cross as well as even being placed vertically from Helix to the lobe. These are only possible where the main cartilage shape of the ear does not protrude preventing a straight passage for the jewellery to sit comfortably. Procedure Needle piercing Complications As there are two piercings and each has the potential to swell a barbell at least 4mm larger than the ear is required to allow for swelling
- Q:I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
- can't draw here, but it's just an x with a flat board on top in 3 dimensions.
- Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q:i need as much detail you can give me on these symbols in the book scarlet letter by Nathaniel Hawthorne. if you have any website references besides cliffs notes and spark notes i would greatly appreciate it!!!
- I for irritable Good thing we're not traveling around together. We'd get in a heap of trouble, lol
- Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
- Cantilever scaffold cantilever beam fixed method is as follows:1, the floor in the rebar at the same time, the embedded two door shaped clamp, each clamping hoop is composed of 2 14mm grade steel made a root diameter, the first door shaped clamp from the wall 450mm, second door shaped clamp from the other end of the 350mm, the door shaped card hook stirrup slab reinforcement, to meet the requirements of the anchorage the cantilever beam, door shaped clamp is inserted in the middle, but also with a fixed electric welding.
- Q:i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- i heard from people after a year an industrial still hurts and they usually have to take them out
- Q:Find the demolishing scheme of scaffold
- Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding heauty swivel coupler
- Loading Port:
- Nanjing
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords