Scaffolding formwork pressed swivel coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Lapping Form: | materail: | size: | |||
origin: |
Packaging & Delivery
Packaging Detail: | Standard export seaworthy packing or according to the client's requirments |
Delivery Detail: | within 15-20 days after the confirmation |
Specifications
scaffolding pressed swivel coupler
1. Q235
2. Versatility
3. the structure solid and reliable
4.BV certification
Name | Drop forged double coupler |
Type Of Couplers | British |
Name | swivel coupler |
Material | Q235 |
Surface | zinc plating |
weight | 1.0kg |
Standard Size | 48.3mm |
Standard | EN74,BS1139 etc. |
Technology | Drop forged or pressed |
Package | in cartons or in weaving bags ,25pcs/bags |
- Q: Cantilever scaffold technical disclosure
- Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
- Q: I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
- Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
- Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- well it depends because some bars are thicker than others, if your changing to a bar as thick as the one you have now then i say about a month is good but if its the slightest bit thicker i suggest you wait maybe 2 months and in the mean time make sure your turning it and wiggling it so after the 2 months go by you can change it to a thicker bar without it hurting
- Q: ...and I'm not really sure what to expect. I know that everyones healing time and pain tolerence is different but just some personal storys would be nice. And before you say it I am aware that there are risks as there are risks with any piercing. so I'm 17 from London and wondering:How old do you have to be to get it done?Does anyone know a reputable place i can get it done?How much will it be?any experiences to share?
- I haven't had this piercing but i was thinking of getting one i do have an eyebrow ring and seven earrings in each ear and i use to have a tongue ring, your piercing cartilidge so it is going to sting shouldnt be too bad though for me my most painful piercing was my fourth earring hurt after that it wasnt too bad my seventh was a breeze i knew how to take care of it so that it would heal fast and not get infected. you have to daily sometimes twice a day clean it otherwise it gets infected and its been my exerpience that they get infected easy. the healing time for when you pierce cartilidge is twice that of when you pierce your lobe so about 8-12 weeks give or take as far as i know you have to be 18 to get one if your in the US (or 17 with parental consent) not sure what the age would be over in London as for reputable place most tatto parlors do piercings look for a clean place that sterlizes everything very important (again going on US standards) as for the cost not sure was 10 dollars for ear piercing at wal mart but for this kind of ear piercing i would guess 20-30 dollars cause its at leadt 50 for a eyebrow or tongue ring i know that. i hope this helps good luck
- Q: Topic?Scaffolding construction program how to doSpecial construction scheme
- 6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
- Q: In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
- The rosebush grew to become in front of the darkened, detrimental penal complicated, between many much less suitable flowers. i think of of it symbolized that there is popularity in even the worst of souls. it may serve, enable us to need, to advise some candy ethical blossom, that's found alongside the song, or relieve the darkening of a tale of human frailty and sorrow.
- Q: Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
- Inspection and acceptance1) the relevant provisions on inspection of steel pipesSteel pipes, fasteners, safety nets and other products must have a certificate of quality.All components must have quality inspection report, steel material inspection method must comply with the national standard "metal tensile test method" (GB/T228) the relevant provisions of the quality should be consistent with the "carbon structural steel" (GB/T700) regulations Q235. a steel.The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
- Q: I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
- Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
- Q: i got my scaffold done quite a while ago and it still really hurts and is all lush and crusty,loli know it takes agessss to heal but could i take it out and put normall small earrings in each whole instead? Which would i have to use? thanks
- in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.
- Q: Specification and type of scaffold erection
- Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
Send your message to us
Scaffolding formwork pressed swivel coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords