• Scaffolding Cuplock System Safe Durable for Construction CNBM System 1
  • Scaffolding Cuplock System Safe Durable for Construction CNBM System 2
  • Scaffolding Cuplock System Safe Durable for Construction CNBM System 3
Scaffolding Cuplock System Safe Durable for Construction CNBM

Scaffolding Cuplock System Safe Durable for Construction CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Scaffolding Cuplock System Safe Durable for Construction

  • Type: Heavy Section Steel

  • Forming: Welding Products

  • Standard:GB, ASTM, DIN, JIS, AISI, BS, En74,Bs1139

  • Member:Steel Column

  • Trademark:Quality Carbon Structural Steel and Alloy Structural Steel

  • Connection Form:Welded Connection

  • Carbon Structural Steel:Q235,Q255,Q345

  • Residential Wall Structure:Wall Support

  • Type of Steel For Building Structure:High-Strength Steel

  • Bs1139, En74 Standard:Tube :48.3mmx3.25mm/2.5mm

  • Export Markets:Global


  • Scaffolding Cuplock System Safe Durable for Construction CNBM

  • Scaffolding Cuplock System Safe Durable for Construction CNBM



  • Scaffolding Cuplock System Safe Durable for Construction CNBM

Descriptions of  Scaffolding Cuplock System Safe Durable for Construction

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of  Scaffolding Cuplock System Safe Durable for Construction

Multi-functional-with the universal joint and fully interchangeable components, the cuplock system can be used in most construction projects for both formwork and access. It is very versatile and diverse. Use in the shipping industries, oil and gas and aviation industries.
Versatile-Verticals are assembled with horizontals and diagonals using secure fixed cup connections. Its versatility has a distinct advantage to conventional scaffolding methods. A positive & ridged connection of four units is achieved in one single action. The cupock system is very cost effective and can be erected safely and quickly.
Time saving-cuplock scaffold is the solution for temporary structures Performance stages. Small teams can erect it safely and quickly.
Economical-Easily assembled system scaffold saves time and labor costs.
Durable-All components are hot dip galvanized and manufactures to international standard.
Easily Stored-Individual pipe elements can be packed in bundles for easy storage and transportation. For returns, material can be packed in steel racks.

  • The Main Components of  Scaffolding Cuplock System Safe Durable for Construction

  • Verticals

  • Description

    Material

    kg/pc

    Article No.

    9'10" Vertical 3.00m

    Q345 φ48.3×3.2

    16.90

    SC1001 3000

    8'2" Vertical 2.50m

    Q345 φ48.3×3.2

    14.20

    SC1001 2500

    6'6" Vertical 2.00m

    Q345 φ48.3×3.2

    11.60

    SC1001 2000

    4'11" Vertical 1.50m

    Q345 φ48.3×3.2

    8.90

    SC1001 1500

    3'3" Vertical 1.00m

    Q345 φ48.3×3.2

    6.20

    SC1001 1000

    1' Vertical 0.50m

    Q345 φ48.3×3.2

    3.50

    SC1001 0500

Horizontals

  • Description

    Material

    kg/pc

    Article No.

    10'0" Horizontal 3.05m

    Q345 φ48.3×3.2

    11.80

    SC1002 3048

    9'0" Horizontal 2.74m

    Q345 φ48.3×3.2

    10.70

    SC1002 2743

    8'2" Horizontal 2.50m

    Q345 φ48.3×3.2

    9.80

    SC1002 2500

    7'0" Horizontal 2.13m

    Q345 φ48.3×3.2

    8.40

    SC1002 2133

    6'6" Horizontal 2.00m

    Q345 φ48.3×3.2

    7.90

    SC1002 2000

    6'0" Horizontal 1.83m

    Q345 φ48.3×3.2

    7.20

    SC1002 1828

    5'11" Horizontal 1.80m

    Q345 φ48.3×3.2

    7.10

    SC1002 1800

    5'0" Horizontal 1.52m

    Q345 φ48.3×3.2

    6.10

    SC1002 1524

    4'11" Horizontal 1.50m

    Q345 φ48.3×3.2

    6.00

    SC1002 1500

    4'1" Horizontal 1.25m

    Q345 φ48.3×3.2

    5.00

    SC1002 1250

    4'0" Horizontal 1.22m

    Q345 φ48.3×3.2

    4.90

    SC1002 1219

    3'6" Horizontal 1.07m

    Q345 φ48.3×3.2

    4.30

    SC1002 1067

    3'3" Horizontal 1.00m

    Q345 φ48.3×3.2

    4.10

    SC1002 1000

    3'0" Horizontal 0.91m

    Q345 φ48.3×3.2

    3.80

    SC1002 0914

    2'11" Horizontal 0.90m

    Q345 φ48.3×3.2

    3.70

    SC1002 0900

    8'0" Horizontal 2.44m

    Q345 φ48.3×3.2

    9.50

    SC1002 2438

    1'10" Horizontal 0.57m

    Q345 φ48.3×3.2

    2.40

    SC1002 0600

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: looking for a scaffolding job in dubai can anyone help?
Hi okorder , we are Dubai based scaffolding contractor.
Q: What's an antonym for the word scaffold?
I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
Q: Method for inspection of foot hand frame fittings
Should adopt the current national standard "straight welded steel pipe" GBT 13793
Q: What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q: what are two burdens for each character? What action does each character indicate that she or he is indeed free from their burdens?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q: The construction scheme of high rise and external cantilever scaffold!
(2): Fastener fastener should comply with the "steel pipe scaffolding fasteners" (GB15831 1995). The provisions of fastener can't crack, porosity, trachoma and other casting defects. Surface fastener and steel tube to contact good fastener clamping steel pipe, the minimum distance of the opening should be less than 5mm.(3) the foot board; steel foot plate generally with thick 2mm steel plate, and the table has a uniform distribution of anti slip hole, board length 2~4m, width 250mm of fir or pine, board length 3~6m, width not less than 150mm.
Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
im talking from experience-scaffold piercings are VERY painful, and take a long time to heal. so there wouldnt be any way you could take it out to hide it for a good few months! it really isnt a great piercing to get unless you can openly look after it properly. anyway you shouldnt disregard what your parents say...i know thats what you want to do!lol really though, its very painfull!
Q: i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords