Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for Boiler Water
- Loading Port:
- Nanjing
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Sampling cooler used for boiler room or soda assay sample cooling
power station, the water in the boiler and heating system mostly
higher temperature, and high temperature is not convenient to
sampling, also not easy to determine, in the sample should be cool,
so let's introduce the sample of sampling point sampling cooler for
cooling, general requirements to ensure traffic in the 500-700 ml/min,
the sample can take a 30 to 40 degrees cold, satisfy the People's
Republic of China power industry standard DL/T 457-457.
Sampling tubes adopt stainless steel tube, can not use carbon steel or
brass tube, in order to avoid the sample is in the process of sampling
tube of metal corrosion products pollution.
Sampling cooler is suitable for the high temperature of the liquid and
gas media such as sampling, has a compact structure, high heat transfer
efficiency, convenient washing, long service life, etc.
QYL-133/0.3 QYL-159/0.35 QYL-219/0.45 0.38 QYL-273/0.55
(or the user specified) interface optional welding and flange,
Types of sampling
1. Boiler water sampling
Boiler water sample generally removed from the sound of continuous
drainage tube, led to the cooler again.Sampling points should be near
the outfall to elicit the exit of the drum, as far as possible and as far
as possible in a drum derivation after first before discharge valve.
2. Water sampling
After water sampling points generally located in the feed water pump,
high pressure feed pipe economizer before, should be in a small pipe,
vertical pipe to pipe connect water supply samples which led to the
sampling cooler.After water sample tube should be located in feed
water dosing enough to each position.
3. The water sampling
Water sampling points on general in the exit of the condensate pump,
the condensate pipeline, should not be installed in the entrance of the
condensate pump, because of the entrance of the condensate pump
pressure below atmospheric pressure.
4. The hydrophobic sampling
Hydrophobic general sampling in the drain tank.Sampling points are usually
located in around 300 mm from the bottom of the drain tank.
Samples by sampling cooler, 5 will steam condenses into water.Steam in the sampler
flow generally for 20 to 30 kg/h.Demand for sample which leads to the catheter and
cooler, the same as the water sampling.
FAQ
We have organized several common questions for our clients,may help you sincerely:
①How about your company?
A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.
②How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
③How long can we receive the product after purchase?
In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served
- Q: hi, i am in my final year electrical engineering can any one provide me the latest booming seminar topics.
- see this website engineering.electrical-equipment.
- Q: I have two orange electrical outlets in my dorm and I want to plug things like my lamp, fan, phone charger, etc. into them. Is that safe?
- If they fit, then yes. I would use a power surge protector just in case.
- Q: 97 dodge avenger 2.5L V6 front wheel drive 4speed auto.For a little while now i felt a really light jerk type feeling in the engine during light accleration, shruged it off for needing tune-up and plan to take care of it on my next day off. Well today my speedometer droped about 40 MPH then right back to normal. Then a little bit later in the day it's doing the same but also at the same time as that problem the car will jerk like it's trying to stop itself. I then hit a hill where i had to lightly accelrate to keep speed and the jerking i shurged off started again but pretty heavy this time along with the speedometer droping. And then ontop of that the radio kept shutting itself on and off. I have no clue what's going on anymore and if these are related anyone please give me a little advice i'd be very thankful.
- I think maybe also check the idle speed. sounds like its off. I dont think that that is the problem with radio though. for that could be a short in the wire. oh -maybe your alternator. that might cause both, or the car is possesed. lol
- Q: ever had your electrical equip. tripped off by GFCI RECEPTERSdid it damage your hard drives, toasters, microwaves ect.?
- I saw your other question about freezers and GFCI protected circuits. What are you up to? GFCI protected circuits will not harm your electrical equipment or appliances. When they trip it is the same as simply turning off the electricity. No problem. I think you may have issues other than what you are asking.
- Q: Can someone tell me more about this MOS or others that relate to this field of work. Also, how will a soldier be utilized under this MOS. thank you
- Well you won't be a Soldieryou will be a Marine 1142 is a High Tech JobElectronicsCircuit boards and the like Great Background in Electronics for a Civilian Career Do not waste your Time in the CorpTake every Electronics course you can Go to Night School and stay out of the Bars and Strip Joints I was a Sgt 1141/42 in Vietnam Earned an EE Degreeowned a successful Business now RetiredX2 You will be assigned to a Utilities Platoon (Extremely Few in Numbers) Within an Engineering Battalion Probably the Least numbers of Marines in any Outfit Must Maintain and Repair any and all Electrical Generators and Pumpswithin the Command you are assigned to ie: 7th Engrs was assigned to the 1st MarDiv in Vietnam Maybe assigned to an MEB aboard shipFMF and make Landings and set up your equipment SEMPER FI !!!!
- Q: Conduct regular maintenance tests for the electrical equipment.The following actions should be taken to reduce the probability of potential electrical deficiencies at this facility.The Hazard
- potential electrical deficiencies means the possibility that this facility will not work due to electrical problems in other words, future problems caused by lack of maintenance on the electrical equipment. Therefore, the sentence could be rephrased as follows: The following actions should be taken to to make sure all the electrical equipment stays in good working order.
- Q: I plan on starting college next September to study electrical electronic engineering, it's three years in college then moving onto university. In college I would be B Tech qualified and the awarding body is EAL. Is B Tech qualification good ?What Qualifications will I get out of university ?What's the difference between BEng and MEng ? Could an Electrical Engineer work on oil rigs ?
- I have no idea about B Tech. A university will give you either a BSc or BEng (Bachelors degree in Science or in Engineering), which doesn't actually matter much, it's a technical distinction that most employers will ignore. MEng is a masters in engineering, you normally get it from a university that offers a 4 year masters program as a way for students to get a Masters degree (which is normally a post-graduate qualification) while still getting the government funding level offered for undergraduate degrees. In theory these are as good as a true post-graduate degree, in practice they are considered somewhere between a Bachelors and a separate post-grad masters. There may be some small call for electrical engineering on an oil rig but very little, it certainly wouldn't be considered a mainstream source of employment for people with that qualification.
- Q: I have a hanging, pull-string electrical light in my attic. This is very standard stuff. I would like to purchase an electrical device that will screw into the electric light and give me an electrical outlet. Think of this as a device with the base of an electric light bulb and an electical outlet instead of the bulb. I thought I saw one in a hardware store 20 years ago, but I have no idea if this product still exists. I can not think of what it would be called with a technical name when searching for one on the Internet.My business application is to be able to plug equipment into my attic rather than running the cord into the main house.
- Go to Lowes, Home Depot, or any local Ace Hardware and tell them what you have written here. They are still available. Oh yeah, it's called a socket adapter.
- Q: I have heard from a lot of people about the greatness of an EE degree but never got the chance to ask why? So what is so cool about an electrical engineering degree that makes it better than the other engineering degrees out there?
- I've got a Electrical Engineering Diploma. I work in the electrical field. I'd be a Graphic Designer.
- Q: Do they actually build stuff or just wire them? I know this is probably a stupid question.
- Electrical engineering is a broad and expansive field that covers almost every aspect of any device or piece of equipment that uses electricity. I have a friend who is a electrical engineer (and is also the smartest person I know), who knows how to design complex Printed Circuit Boards, right down to complex wiring jobs. He currently works as a product engineer for HP. But they do a lot more than that, from designing electronic devices, to working with and designing the high voltage equipment that is used in power grids. Pretty much anything that uses electricity was designed or is maintained by an electrical engineer.
Send your message to us
Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for Boiler Water
- Loading Port:
- Nanjing
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords