• Rubber End Hose with Two Side Coupling Working Presure 85 BAR 5M*DN125 System 1
  • Rubber End Hose with Two Side Coupling Working Presure 85 BAR 5M*DN125 System 2
  • Rubber End Hose with Two Side Coupling Working Presure 85 BAR 5M*DN125 System 3
Rubber End Hose with Two Side Coupling Working Presure 85 BAR 5M*DN125

Rubber End Hose with Two Side Coupling Working Presure 85 BAR 5M*DN125

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
10 pc
Supply Capability:
5000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

 

Name

Specifications
Diameter*Length
(mm)

Application

Flange diameter

Remarks

Rubber hose

DN125*3000

Concrete pump
Concrete placing boom

148/DN157mm

Rubber hose

DN150*3000

Concrete pump
Concrete placing boom

148/DN157mm

High pressure
Rubber hose

DN125*3000

Concrete pump
Concrete placing boom

148/DN157mm

Two layers of steel wire

High pressure
Rubber hose

DN125*3000

Concrete pump
Concrete placing boom
Piling machine

148/DN157mm

Four layers of steel wire

High pressure
Rubber hose

DN125*4000

Concrete pump
Concrete placing boom
Piling machine

148/DN157mm

High pressure
Rubber hose

DN150*3000

Concrete pump

175mm


Rubber hose

DN80*5000

Mortar pump
Fine stone concrete pump

mini conctete pump

98mm


Rubber hose

DN80*6000

Mortar pump
Fine stone concrete pump

mini conctete pump

98mm


Rubber hose

DN100*5000

Mortar pump
Fine stone concrete pump

mini conctete pump

124mm

End hoseDN65*8000Mortar pump
8m

 

Product Description:

The rubber end hose with two side couplings, normally the hoes is made by NR and reinforced by four layer steel wire, and the two couplings at each side are made by steel material No.ST52, 20#, 37MN5, with hot treatment according to customer’s requests, and also package in bundles or nude packing directly put into container.

 

Inspection & claim: quality should be in conformity with the specification of the manufacturer.  Quantity and packing conditions should be in conformity with the term in this contract.  Should the quality found not in conformity to the specification of manufacturer, or should the inspected quantity found in shortage, or should the packing found damaged, the buyer has the right to claim to the seller. the claim, if any, should be presented to seller within 30 days after cargo's arrival date to the port, together with related inspection report and photos issued and provided by a reputable independent surveyor such as sgs.

Scope of Application of the hose

The  rubber end hose is a concrete delivery for combined use with other concrete pipelines in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

Product Advantages:

OKorder's rubber end hose Channels are durable, strong, and safety. We are the biggest group in this business filed and the majority resources are under our control, which is make sure the delivery time and qualified products, meanwhile we have more than 20 overseas branches our people will go to visit customer very fast for more convenient communication.

 

Governing law and disputes resolution: this contract is governed by the law of the people's republic of china.  any dispute arising out of connection or in connection with the sales contract, including disputes on its conclusion, binding effect, amendment and termination, shall be settled through friendly negotiation.  in case no settlement can be reached, the dispute shall be resolved by china international economic and trade arbitration commission (cietac), to the exclusion of the ordinary courts by an arbitral tribunal in accordance with the arbitration rules of cietac without recourse to the ordinary courts of law.  Such arbitration shall be final and binding upon both parties.  the arbitration fees,unless otherwise awarded shall be borned by the losing party.

 

 

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

 

FAQ:

 

Q1: How long about delivery time?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Rubber End Hose with Two Side Coupling Working Presure 85 BAR 5M*DN125

.jpg

.jpg

Rubber End Hose with Two Side Coupling Working Presure 85 BAR 5M*DN125

 

Q:What are the indications of an inaccurate concrete pump pressure gauge?
There are multiple signs that may suggest an unreliable concrete pump pressure gauge. Below are a few examples: 1. Inconsistent measurements: If the pressure gauge consistently provides varying readings despite consistent concrete pumping conditions, it could indicate an inaccurate gauge. For instance, if the gauge shows a pressure of 1000 psi one moment and then suddenly jumps to 1500 psi without any significant changes in the pumping operation, it could suggest a problem with the gauge. 2. Abnormal readings: If the pressure gauge consistently displays excessively high or low pressure readings that deviate significantly from the expected values, it may imply an inaccurate gauge. It is crucial to be aware of the usual pressure range for the specific concrete pumping operation to identify abnormal readings. 3. Incompatibility with other gauges: If there are multiple pressure gauges installed in the concrete pumping system and they provide notably different readings, it may indicate that one or more of the gauges are inaccurate. By comparing the readings from various gauges, it is possible to determine if a particular gauge is faulty. 4. Insufficient pump performance: If the concrete pump is not performing as anticipated, such as experiencing reduced output or inconsistent flow rates, it may be a result of inaccurate pressure readings. Inaccurate pressure measurements can disrupt the control of the pump's hydraulic system, leading to inefficiencies in pumping operations. 5. Physical damage or wear: Any visible damage or signs of wear on the pressure gauge, such as cracked glass, bent needles, or loose connections, can compromise its accuracy. Such physical damage can result in inaccurate readings and should be promptly addressed. Regular calibration and maintenance of the pressure gauge are essential to ensure accurate readings. If any indications of an inaccurate gauge are observed, it is advisable to consult a professional technician or engineer to assess the situation and take appropriate actions to rectify the issue.
Q:Can I get spare parts for both piston and rotary concrete pumps?
Yes, you can get spare parts for both piston and rotary concrete pumps. Many manufacturers and suppliers offer a wide range of spare parts for these types of pumps. These parts include but are not limited to pistons, seals, valves, wear plates, hydraulic components, and bearings. It is important to ensure that you purchase genuine spare parts from reputable suppliers to ensure the quality and compatibility with your specific pump model. Additionally, it is recommended to have a regular maintenance and inspection schedule for your concrete pump to identify any worn-out parts and replace them promptly to avoid any potential breakdowns or disruptions in your construction projects.
Q:How often should hopper vibrators be inspected or replaced in a concrete pump?
Hopper vibrators in a concrete pump should be regularly inspected to ensure their proper functioning and prevent any potential issues. The frequency of inspections or replacements may vary depending on several factors, including the intensity of use, operating conditions, and the manufacturer's recommendations. As a general guideline, it is advisable to inspect hopper vibrators at least once a year or every 500-600 hours of operation, whichever comes first. However, if the concrete pump is subjected to heavy use or operates in harsh environments, more frequent inspections may be necessary. During the inspection, the hopper vibrators should be checked for any signs of wear, damage, or loose connections. Additionally, the vibration intensity and frequency should be examined to ensure they are within the recommended range. Any issues identified during the inspection should be promptly addressed, either through repairs or replacements, to ensure the hopper vibrators continue to function optimally. Regular inspections and timely replacements of hopper vibrators are crucial to maintain the efficiency and reliability of a concrete pump. Neglecting these inspections can lead to decreased performance, increased downtime, and potentially costly repairs. Therefore, it is essential to follow the manufacturer's guidelines and consult with professionals to determine the appropriate frequency for inspections and replacements based on the specific circumstances of your concrete pump.
Q:Are there any specific guidelines for the installation of control panels or electronic components in concrete pump spare parts?
Specific guidelines exist for the installation of control panels or electronic components in concrete pump spare parts. When installing such components, it is important to consider the following guidelines: 1. Protection from Moisture: Electronic components can be damaged by moisture, so it is advisable to install them in waterproof or moisture-resistant enclosures to prevent damage from water or humidity. 2. Vibration and Shock Absorption: To avoid damage, it is recommended to use shock-absorbing mounts or vibration-resistant enclosures to minimize the impact of vibration and shock on control panels or electronic components. 3. Temperature Control: Extreme temperatures can affect concrete pump spare parts, so it is crucial to install control panels or electronic components in a temperature-controlled environment. This may involve using insulation or cooling systems to maintain a suitable operating temperature. 4. Wiring and Connections: Proper wiring and connections are essential for the functioning of control panels or electronic components. It is important to follow the manufacturer's instructions and guidelines for wiring, ensuring secure connections and providing adequate insulation and protection against short circuits or electrical hazards. 5. Accessibility and Maintenance: Control panels or electronic components should be installed in a way that allows easy access for maintenance and repairs. Sufficient space should be left around the components for easy inspection, servicing, and replacement if needed. By adhering to these guidelines, the installation of control panels or electronic components in concrete pump spare parts can be carried out to ensure their long-term functionality and durability.
Q:What are the indications of a faulty concrete pump hydraulic motor?
There are several signs that can indicate a malfunctioning hydraulic motor in a concrete pump. Some common indicators to watch for are: 1. Power loss: If the hydraulic motor is not working correctly, you may notice a significant decrease in power in the concrete pump. The motor may struggle to generate enough force to effectively pump the concrete, resulting in slower or weaker output. 2. Unusual noises or vibrations: A faulty hydraulic motor may produce abnormal sounds or vibrations while in operation. This could be due to damaged internal components or misalignment, indicating an issue with the motor. 3. Leaking fluids: Proper flow and pressure of hydraulic fluid are essential for the functioning of hydraulic motors. If you observe any fluid leaks around the hydraulic motor or its associated parts, it could be a sign of a faulty motor that requires attention. 4. Overheating: A malfunctioning hydraulic motor may overheat due to increased friction or internal problems. If you notice excessive heat emanating from the motor or its associated parts, it is crucial to address the problem promptly to prevent further damage. 5. Inconsistent or jerky movement: A faulty hydraulic motor can cause the concrete pump to operate unevenly or jerkily. This can result in uneven pouring or difficulty in controlling the flow of concrete, indicating an issue with the motor's performance. 6. Increased energy consumption: A faulty hydraulic motor may consume more energy to function properly. This can lead to a noticeable rise in energy usage, which can be observed through higher electricity bills or added strain on other components of the pump's system. It is important to remember that these signs may vary depending on the specific make and model of the concrete pump hydraulic motor. It is always recommended to consult the manufacturer's guidelines or seek professional assistance to effectively diagnose and address any issues with the hydraulic motor.
Q:What are the different types of concrete pump hydraulic pumps?
There are several different types of hydraulic pumps that are commonly used in concrete pumps. 1. Gear pumps: Gear pumps are one of the most common types of hydraulic pumps used in concrete pumps. They consist of two meshing gears that push the hydraulic fluid from the inlet to the outlet. Gear pumps are known for their simplicity, durability, and reliability. 2. Piston pumps: Piston pumps are another popular type of hydraulic pump used in concrete pumps. They use reciprocating pistons to move the hydraulic fluid. Piston pumps are known for their high pressure capabilities and ability to handle heavy-duty applications. 3. Vane pumps: Vane pumps are often used in smaller concrete pumps or as auxiliary pumps in larger pumps. They use a series of vanes that rotate inside a housing to move the hydraulic fluid. Vane pumps are known for their compact size and efficiency. 4. Radial piston pumps: Radial piston pumps are typically used in high-pressure concrete pumps. They have multiple pistons arranged radially around a central shaft. The pistons move in and out to create the pumping action. Radial piston pumps are known for their high efficiency and power. 5. Axial piston pumps: Axial piston pumps are commonly used in large concrete pumps. They have multiple pistons arranged in a circular pattern around a central shaft. The pistons move in a linear motion to create the pumping action. Axial piston pumps are known for their high flow rates and pressure capabilities. Overall, the choice of hydraulic pump for a concrete pump depends on various factors such as the size of the pump, the desired pressure and flow rate, and the specific application requirements.
Q:Can concrete pump valves be repaired or should they be replaced?
Instead of being replaced, concrete pump valves can frequently undergo repair. The determination of whether to repair or replace a concrete pump valve is contingent upon the extent of the damage and the cost-effectiveness of each alternative. Occasionally, minor problems like clogs or leaks can be effortlessly resolved by cleaning or substituting smaller parts. Nevertheless, if the valve is significantly impaired or deteriorated, replacement might be the more pragmatic resolution. It is advisable to seek the expertise of a professional concrete pump technician to evaluate the valve's condition and ascertain the most suitable course of action.
Q:How do I ensure the reliability of concrete pump spare parts in critical applications?
To guarantee the dependability of concrete pump spare parts in crucial applications, there are various measures you can implement: 1. Select a reputable supplier: Carry out research and choose a trusted supplier renowned for supplying top-notch concrete pump spare parts. Look for suppliers with a solid track record, positive feedback from customers, and certifications that validate their commitment to quality and dependability. 2. Verify product specifications and certifications: Prior to purchasing any spare parts, carefully assess the product specifications and certifications. Ensure that the parts meet the required standards and have undergone thorough testing to ensure their reliability in crucial applications. 3. Perform regular maintenance and inspections: Establish a comprehensive maintenance and inspection schedule for your concrete pump and its spare parts. Regularly inspect for signs of wear, damage, or malfunction. Replace any parts that display signs of deterioration or no longer meet the required specifications. 4. Utilize authentic spare parts: Always opt for genuine spare parts specifically designed for your concrete pump model. Authentic parts are manufactured to the highest standards and are more likely to deliver reliable performance in crucial applications compared to generic or counterfeit alternatives. 5. Maintain an inventory of critical spare parts: Identify the most crucial spare parts that are susceptible to failure or wear and keep a stock of these parts readily available. This will minimize downtime in the event of unexpected failures and ensure the swift replacement of any faulty components. 6. Train and educate operators: Provide comprehensive training to your concrete pump operators on the proper handling and maintenance of spare parts. Educate them on the significance of adhering to manufacturer guidelines and best practices to maximize the reliability and longevity of the equipment. 7. Give priority to safety: Safety should always be a primary concern in crucial applications. Ensure that the spare parts you utilize comply with safety regulations and standards. Regularly evaluate and update safety protocols to minimize the risk of accidents or equipment failure. By following these measures, you can enhance the dependability of concrete pump spare parts in crucial applications, reducing the chances of downtime and ensuring the seamless operation of your equipment.
Q:How often should concrete pump control levers be inspected and replaced?
Regular inspections should be conducted on concrete pump control levers to ensure they are in proper working order. The frequency of these inspections and any necessary replacements will depend on various factors, such as usage levels, environmental conditions, and the quality of equipment maintenance. As a general rule, it is recommended to inspect the control levers at least once a year. This inspection should involve a thorough examination of the lever mechanism to check for any signs of wear, damage, or malfunction. It is also advisable to inspect the levers after any major repairs or maintenance to ensure they have been correctly reinstalled and are functioning properly. If any issues are identified during the inspection, it is crucial to address them promptly. Depending on the severity of the problem, repairs or replacements may be required. Minor repairs can often be carried out on-site, while more significant issues may necessitate the assistance of a professional technician. Regular maintenance, including lubrication and cleaning, is important for extending the lifespan of the control levers. Following the manufacturer's maintenance and usage guidelines can also help prevent premature wear and damage. Ultimately, the frequency of inspections and replacements may vary based on specific circumstances. It is advisable to consult the equipment's manual or the manufacturer for precise recommendations regarding the maintenance and replacement of the control levers.
Q:Is the main pump of the concrete pump electric control or hydraulic control?
General Separated and Closed Open Electromagnet Control Displacement (Current)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords