• Ringlock Scaffolding High Quality Guangzhou area System 1
  • Ringlock Scaffolding High Quality Guangzhou area System 2
  • Ringlock Scaffolding High Quality Guangzhou area System 3
  • Ringlock Scaffolding High Quality Guangzhou area System 4
Ringlock Scaffolding High Quality Guangzhou area

Ringlock Scaffolding High Quality Guangzhou area

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
15000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ringlock Scaffolding High Quality Guangzhou area

Ringlock Scaffolding High Quality Guangzhou area

Ringlock Scaffolding High Quality Guangzhou area

Description

Ringlock scaffolding, also called Modular Scaffolding and Multidirectional Scaffolding, the junction enables quick and easy connection of load bearing items as well as reinforcing parts to each other with an enormous rigidity.

Ringlock scaffolding is the new generation product of cuplock sacffolding.The buckle part is a disc which diameter 133mm,and thickness 10mm. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many disc every specific distance ,there is 8 holes on the disc,used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two wedge welded on the ends separately.

 

Detailed information

Name:

RingLock Scaffold System and Accessories

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase, Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be manufactured according to your standards.

 

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Stable and durable thanks to its structual design & automatic welding quality

 

 

FAQ

Q: Delivery?

   Usually we can arrange 10-30days for good to ports according to the order qty.


Q:Standard Specification for bowl type scaffold steel pipe diameter
Scaffolding is also called full house scaffolding, its focus from low to up as follows: the pole is the thickness of 5cm plate, and the length of not less than 3 cross; sweeping bar is complete, height is not more than 10cm
Q:Bowl buckle scaffold is not a steel pipe scaffolding
The buckle of the bowl buckle scaffold can be welded with a bowl buckle, and the node is mainly fixed by a bowl buckle
Q:Hey so I've had my scaffold piercing a day and its bleeding a lot when I woke up this morning, there was even like jelly blood clots, its really painful and super itchy, I know I've only had it a day but I'm a little worried, any advice ? Thanks :)
Is there a reason you haven't any longer been to the ER or pressing care an prolonged time in the past? circulate there now. You gotta use some easy experience here. we will not make it easier to be conscious of what to do while it includes scientific judgements or making up your ideas. you are able to beware for your self.
Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Should be less than or equal to 3 times the vertical pole of the scaffolding.
Q:I've had my industrial piercing for a long time now, but I was wondering if I could put two 14g tongue rings in the holes. Would that damage them or make them crooked? Also, could I use two tongue retainers? Thanks.
Stretching shouldn't harm whilst you're giving it sufficient time... so this particularly isn't a good assessment! A single cartilage piercing does not harm plenty extra desirable than your usually taking place earlobe (lobe being 2, cartilage piercing being 3 on a scale of a million to 10). yet i've got on no account had a scaffold or orbital of any sort, so i've got not got plenty first hand experience. easily however i does no longer project approximately it. it particularly is going to be over in 30 seconds, a million minute tops. and you get to return away with a reasonably new piercing! Yay!
Q:PLEASE HELP!!!
it's been a while, but i think it's significant b/c its foreshawdoing. she later ends up dying on the scaffolds. also, i think she is looking down on everyone and seeing them as sinners, while later the tables will be reversed as they all look down on her for commiting adultery
Q:I would like to ask those who know the specification scaffolding? Can you teach me?
(2) sufficient area;(3)Safety, high altitude operation requirements;(4)Has the advantages of simple structure, convenient assembly and disassembly; (5) according to local conditions, local materials.
Q:The bowl locking conditions of scaffolding, to detect what hand to try, or with what tools?
Scaffolding is relatively new, the old one is round new CD, is surrounded by four jacks, which is used more and more tight, do not need what tools!
Q:Hi guys!...ive had a scaffold piercing for a little over 2 weeks and when i got it done it bled quite alot...this obviously made some scabs...but every time i clean it the scabs come off and its starts bleeding again...and just before i posted this i found abit of puss like fluid round the back of it!I clean it twice a day and avoid touching it What have i done wrong :(Plus my mum is now like quot; i told you so quot; LolCheers :)
Ear cartilage piercings generally take longer to heal than lobe piercings. This is often due to a combination of things, such as the location of the piercing in the cartilage, the type of jewellery used and the tension that jewellery creates to the structure of the cartilage. Using biocompatible plastics (like PTFE), cleaning cartilage regularly, and increasing your intake of minerals will certainly benefit your piercing; however a piercing will almost always be doomed to failure if improper jewellery and poor planning are used and left unmonitored.
Q:From the book quot; The Scarlet Letterquot;
He says not at thois time but that one day he will.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords