• Ring-lock Scaffolding with Best Prices and Trustable Quality System 1
  • Ring-lock Scaffolding with Best Prices and Trustable Quality System 2
  • Ring-lock Scaffolding with Best Prices and Trustable Quality System 3
Ring-lock Scaffolding with Best Prices and Trustable Quality

Ring-lock Scaffolding with Best Prices and Trustable Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
400 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Ring-lock Scaffolding


Ring-lock Scaffolding consists of adapter plug of ring-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The use of diagonal bracings also helped to improve stability, especially on tall buildings. The first frame system was brought to market by SGB in 1944 and was used extensively for the Ring-lock Scaffolding which used for mobile working platform

installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary 

stand,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.


2.   Main Features of Ring-lock Scaffolding


  •     Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-

        size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

  •     Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than    

        normal

  •     Not easy to lose fastener, portable firm and easy to maintain and transport



3.   Ring-lock Scaffolding Pictures


Ring-lock Scaffolding with Best Prices and Trustable Quality


Ring-lock Scaffolding with Best Prices and Trustable Quality



     4.  Ring-lock Scaffolding Specification


     As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

     The adjustable steel clamp is convenient to use, and can hold tightly.

     There is a prizing part designed in the corner, which can help to position and remove formwork easily.

     The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is     

     perfect.

     The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project    

      demand.


     5.  FAQ of Ring-lock Scaffolding



     What about of our after-sale service?

     Response will be carried out in 24hours  after receiving any complain or request.

     Aluminum-Frame Formwork cost can be refund after order is confirmed. 

     If the products are not based on the requirements, there will be the relevant compensations made for you.


     What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    We can provide you the professional design team.    

    We can provide fashionable and newest styles for you.       

    Please feel free to customize.

Q:i work in construction.
I want to say, that I use to work in construction. Different kind than you but still construction. I walked all day hefting cones around. (Anyone who has carried cones know how heavy they are and when you start carrying more than 5 at a time it is a real work out.) I have to say that when I was doing this I was in the best shape that I have ever been in, in my life. I'm not a professional but you came to Yahoo Answers and we all know that this is not the place that the pro's go to give out free advice. LOL But, if you look at the people who lived in the 1800's and before, did they go to the gym to work out, or did they work out at work? Whether it was in their own field or someone else's. Hence, therefor, I think you are probably getting a pretty good work out. I mean its not like you sit in front of the computer all day long.
Q:How many kinds of wheel buckle scaffolding and adjustable wire base and support?
5, the horizontal bar step using 160cm. (20+3 * 160=500 50 left sweeping bar for jacking cantilever length, right)6, set the wall and box culvert wall connection point, height of 3.40 meters, each one of the three vertical pole distance, no scissors.According to this structure, the landlord to calculate their own, very simple.
Q:Another from the ministry of silly questions…I’d like to support a lightweight tarpaulin over my back yard. Single slope, high side attached to the house and low side attached to a scaffolding pole, running horizontally between two walls. Fair weather, no high winds or pooling. The run of pole would be 8 meters. The longest poles seem to be 6m, so I need to use a coupling. Will this be strong enough – ish? I imagine the most stressed point would be just around the edges of the coupling, so If I used two joints/couplings in the bar, wouldn’t I half the strain on a single one?Also if I made the joints at 1m and 7m would that be better than to have a joint in the middle where the most flexing will be?Also bit more expensive, but with Aluminium the bar will be 20kg lighter – buy will it be as strong joint wise?Will a tubular coupling be as good as a external one?If anyone knows.. Thanks!
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q:I need to rent a scaffle that is motorized so I can reach up to 16 ft
your best thing to do is to look up in the phone book or Internet. there are lots of different companies that rent out lifts. Depending on where you live. I know of a few nationwide ones, Hertz for one. Just call the company and tell them you need a lift. if the work is to be done outside I would use a small boom lift, but if it needs to be done inside just a regular platform lift should do the job. they also come in gas, and electric but being that you only need one to reach 16 ft. you probably only need an electric, just be sure to charge it over night when you are not using it! You will probably have to make a credit card deposit also.
Q:Okay, I'm wanting to get my scaffold pierced, I'm just curious on how much they hurt, and how much they cost. Another thing, how long is it before it heals?
One thing you want to watch out for is that if you have it done too far down, it will make your ear stick out because the bar goes right over the part of your ear that protrudes. But really, especially if you have had other parts pierced, it's not bad at all. Alot of the time they even numb it for you! You can't sleep on it, you have to be careful with your hair, and you can't change the bar for awhile but other than that it is way worth it! There is minor swelling in the first few days and a little bit of bruising but the small discomfort is small price to pay, now it looks awesome and I'm glad!!
Q:Ariel Atom Supercar, Hypercar or a just a bunch of scaffolding?
This is how I look at it, those cars for those of us who actually want to know what open wheel racing is like. Its the closest thing well ever get unless your some F1 driver or Indy driver. Practicality non withstanding on this machine. It is NOT an everyday go to work vehicle. This is the car that you take through the mountains, pull a redlight challenge to anyone you see and smoke em. Ariel Atom, Supercar for the weekends.
Q:how much compensation can i get for falling of scaffolding and breaking my arm?
Did you notify your supervisor that you didn't feel safe on the scaffold, and were told to use it anyway? If yes, quite a bit of compensation and hopefully enough punitive damages to put them out of business. If not, sorry guy, Workman's comp. only. Next time be more safe.
Q:Requirements for the current bowl frame. What is the vertical distance, the horizontal distance and the step distance
The vertical rod spacing is the vertical distance between the scaffold and the bent frame, which is the center distance between two adjacent vertical bars.Refers to the distance between the upper horizontal bar of the frame, that is, the distance between the upper and lower horizontal bars
Q:in the safety scaffolding?
If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.
Q:What is the difference between the new type of scaffold and the scaffold?
Novel scaffold. This new scaffold node adopts the structure of self-locking connection, the bar and the pole connected by mortise and tenon, so that all members of effective connection, to eliminate the impact of human factors; the rod axis intersect in one point, all the axial force, no additional stress, good mechanical performance, reliable connection, the overall composition of the scaffold good quick, simple operation; erection; no loose parts, advantage:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords