Ring Lock Scaffolding System with High Quality by HDG
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Ring lock Description
Ringlock Scaffolding system is the most popular used Scaffolding system in the world.It will greatly reduce the cost because of the following advantages
Packaging & Delivery
Packaging Details: | Pallet or bag or upon client's request |
Delivery Detail: | 35days |
2.Main Features of Ringlock
It will greatly reduce the cost because of the following advantages
1)Using less pipes
2)Easy to install
3)It can be used again and again for nearly 20years
3.Ring lock product pictures:
4.Ringlock Product Description
Type: | ringlock scaffolding diagonal Brace |
specification | Ø48.3×3.20 |
material: | steel Q235 |
Finished | Hot DIP galvanized, painted |
Diagonal length(m) | Weight(kg) |
0.9m * 1.25m | 6.28 |
1.25m * 2.7m | 11.45 |
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1)How many Scaffolding your company have?
Here comes our 5 types of Scaffolding systems:
- Cup lock Scaffolding(C-Lock Scaffolding)
- Ring lock Scaffolding
-Kwistage Scaffolding
-H-frame Scaffolding
-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.
2)How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
- Q: I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
- Theres no difference scaffold is what they call it in like europe, indusstrial is usa
- Q: Cantilever scaffold technical disclosure
- The surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scarring, delamination, dislocation, hard bending, burrs, indentation and deep drawing.
- Q: In the U.S.I live in Illinois as well so... yeah :DThank you!
- I paid around $55 +tip for mine but it varies from place to place...just call the place you plan on going to and ask them how much they charge.
- Q: I think that'd be extremely entertaining.
- new jack dont want to work with wwe
- Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
- Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
- Q: Im in college football, I would be puting on and taking off my helmet, I usually keep it on though during practice...but would it be wise for me to get an industrial piercing a couple months before 2 a days and the football season...would the sweat maybe infect my ear, but I am a very clean guy? thanks, if you have an answer it will help my decision.....
- trust me, bro. bad idea. industrials are very tempermental at best. your helmet will cause every problem possible. any descent piercer would tell you the same. don't do it. they take up to a year to heal soif you really want one, quit football or wait til you're out of school.
- Q: i have some ?'s on the scarlett letterWhat effect has the 7=year interval had on Dimmesdale ?
- you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
- Q: Because my friend wants it done but isn't sure :)
- In all honestly, I'd try to talk your friend out of getting that hip piercing. Surface piercings, especially one there, Will reject. I don't mean to sound negative, but have her put two dots where she would want the piercing, and move around as she does daily, she will see how much that area moves. The more movement = the less likely it will heal. They could reject after a month, they could reject after two years. It really depends. No matter how well the piercer, or how well she takes care of it, it will reject. I went to the best piercers in state to get my surface work (sternum, nape) done. I also took care of it by doing sea salt soaks once or twice a day. When that didn't work I used the LITHA (leave it the hell alone) method.The sternum rejected in six months, where the nape was doing great up until that two year mark. Then it started rejecting. If you want to see what a rejecting piercing looks like feel free to send me an Email, I have some pics of my sternum piercing early on - when it started rejecting, then a day or two before I took it out. It honestly looked horrible that few days before I took it out. The piercing place I go to won't do surface piercings on minors, so you have to be 18 for that one in Minnesota. For the scaffold/industrial, you have to be 16 with parental consent and 18 without in the United States.
- Q: Bowl buckle type steel pipe scaffolding should set up a few people
- The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated.
- Q: What are the safety requirements for the dismantling of construction scaffolding
- (1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Send your message to us
Ring Lock Scaffolding System with High Quality by HDG
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords