• Ring Lock  Scaffolding System by HDG for Civil project System 1
  • Ring Lock  Scaffolding System by HDG for Civil project System 2
  • Ring Lock  Scaffolding System by HDG for Civil project System 3
Ring Lock  Scaffolding System by HDG for Civil project

Ring Lock Scaffolding System by HDG for Civil project

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Ring lock Description 

Ringlock Scaffolding system is the most popular used Scaffolding system in the world.It will greatly reduce the cost because of the following advantages

 

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

 

2.Main Features of Ringlock

 It will greatly reduce the cost because of the following advantages

1)Using less pipes

2)Easy to install

3)It can be used again and again for nearly 20years

 

3.Ring lock product pictures:

   Ring Lock  Scaffolding System by HDG for Civil project

 4.Ringlock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 2.7m

11.45

 

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q:I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
You should be using non ionised sea salt dissolved in warm to hot water twice a day to clean the piercing, not savlon (which is to harsh for piercings and will dry out the skin). If the piercing keeps getting caught then it is going to swell and be painful, the area has been through trauma so will be very sensitive. Although swelling at this early stage is still normal and to be expected.
Q:i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q:How long is the service life of disc scaffolding?
Will bring to the construction of a series of security risks, Hunan Billiton Industrial Group Co., Ltd. to provide information is generally 3-5 years
Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q:The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q:there is also shrubs and trees planted on the base of the wall and 14 feet from it
you should have thought about all this before you bid. Now it`s your problem
Q:This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
i sharted. PS: please purchase my new toilet hawaii chair
Q:i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
i heard from people after a year an industrial still hurts and they usually have to take them out

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords