QTZ63 TC5610 Self Erected Top Quality Tower Crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 50 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Characteristics of Tower Crane
1)This tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Key Processing Step to ensure the quality
1, Advanced material -heat -treatment processing to ensure the quality.
2, Automatic union melt welding ensure its beautiful looking and strong welding joints.
3, Double sided milling machine ensure each mast section connected closely and firmly.
4,All steel experience rust removal for twice.
Main Technical Parameter
Packaging Details: | 40 HC containers; Wodden cage for electrical parts Steel box for small parts |
Delivery Detail: | 20-25 days after received the advanced money |
China National Building Materials (Group) Corporation (CNBM), established in 1984,
now is one of the largest state-owned group corporation in China, dealing with building
materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD
and total staff is more than 100,000.
CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment
produced by CNBM are compliant with the National level quality standard, and wins great
reputation for their endurable performance in worldwide markets.
Key reason for CNBM's achievements:
Research and Development (R&D)
- Our own systems of production engineering.
- Production design from the concept to the engineering details.
- National level research academy for various building equipment for over 30 years.
- Continuous development of new solutions and products adapted to the requirements of our clients.
- Technical experts with abundant experience in relative fields.
Production
- Complete quality control system.
- Nearly 20 years experiences in manufacturing fields.
- Full production capacity up to 1000 tower cranes annually (with various load from 4tons to 40tons ).
Commercial & marketing
- Customer-oriented philosophy.
- Full international business experiences.
- Global network & localization strategy.
- Professional & high efficiency team.
Service
Under the guidance of "globalization + localization" strategy, in most of our main markets, the marketing
operations & after sales services are carried out by CNBM's local partner companies.
To provide enough & timely support to the local partners, CNBM has set up 6 branches in the world (with more to ensuring the best services to the end-users along with high quality equipment.
Our Service Branch
CNBM INTERNATIONAL CORPORATION U.A.E BRANCH
CNBM INTERNATIONAL CORPORATION K.S.A BRANCH
CNBM INTERNATIONAL CORPORATION IRAN BRANCH
CNBM (U.S.A) CORPORATION
CNBM INTERNATIONAL(RUSSIA)CORPORATION
CNBM INDIA CORPORATION
CNBM NIGERIA CORPORATION
CNBM KAZAKHSTAN BRANCH
CNBM VIETNAM COMPANY LIMITED
UNDER CONSTRUCTION OTHER PLACES
Service
----Providing timely delivery, standby engineers are ready to slove any of your problem
----Providing all-embraced warranty of products quality, worksite installation guidance
----Providing ample spare parts and training of operation and maintenance
----Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
- Q: could someone give me a good summary on the red badge of courage, and yes i did read the book and i have trouble understanding, and help would be good thanks!!
- A kid, full of beans, runs off to join the army to annoy his mum, but on the eve of battle suddenly becomes paranoid that he'll do something to disgrace himself through cowardice. (That's actually as far as I got in the book so far.) I am given to understand, though, that in his own mind at least he does disgrace himself and endeavours for the rest of the book to redeem his manliness. In that sense the story arc, or at least the character arc, is not dissimilar to The Four Feathers. The point of the story is to counterpoint the myths of warrior gung-ho and daring-do, and to analyse the inner anxieties and motivations of the individual, volunteer-citizen soldier, and by extension the expectations of society. The novel also presents the battlefield with an unprecedented realism; that is to say, Crane presents the actual fog of war that authors have always set out to clear.
- Q: how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- Usually it is the rigger who attaches the lifting gear not the crane operator who needs to know about centriods and even then the real trick is getting the slings or other lifting devices in the exact place. That tends to be a bit of trial and error unless the lifting points are clearly marked.
- Q: why do siberian crane migrate in india?
- Would you spend a winter in Siberia if you could fly south?
- Q: What does tower crane jacking up mean?
- Attached tower crane upper work structure and the lifting sleeve frame connected to the lifting sleeve frame is installed on the lifting jack.
- Q: I'm looking for estimate including installation, vertical support beams, and bus bars. Details: rectangular shaped building 500 ft long split lengthwise into two sections. 500ft X 4lengths of craneways is 2000ft. The crane runways are bolted to building frame but are self supporting on I-beams (104 vertical supporting beams X 24ft. height). The crane runways can support 10ton hoists. The bus bars (electrical conductor assembly) run along all (2000ft) of crane runways.
- the only 5'6 girl I know of who did runway was Devon Aoki. Everyone else is at least 5'9+ except Kate Moss who is 5'7.5. The average height for runway is 5'10
- Q: Can anyone give me a summary of The Veteran by Stephen Crane?
- I okorder /
- Q: we have a project starting that will require a stack built 1km high in the air?How will they install this?
- Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
- Q: how to make a magnetic crane on cheap price?
- The whole crane or just the lifting device? Not easy to be cheap in either case - the crane because of safety concerns and the lifting head because it requires a lot of now high priced copper wire, well insulated, and a hefty electrical source with long cables to get the power to the head. Best (probably) to buy used if you want to save money.
- Q: How do cranes use geometry?
- If your referring to cranes in construction cranes, then it might form a right triangle with the ground implying the use of trigonometry which is a part of geometry.
- Q: mobile tower etc (uk)
- Tower cranes and Gantry Cranes Since toer cranes are the most used in the construction industry gantry Cranes are used in all Ports for loading and unloading containers has a vast scope of work
Send your message to us
QTZ63 TC5610 Self Erected Top Quality Tower Crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 50 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords