Tower Cranes Self-ascending China QTZ63(5610)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ63(5610) Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 0.8T
Rated Lifting Moment:400KN.M Max. Lifting Load: 5T
Max. Lifting Height:140M Span: 56M
Model Number: QTZ63(5610)
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
QTZ63(5610) Features
1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Engineers available to service machinery overseas.
QTZ63(5610) Specification
QTZ63(5610) Pictures
QTZ63(5610) FAQ
Q: What is the building hoist main purpose?
A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
- Q: I have a vessel 40 feet off the ground in a platform, and the crane can get to within 30 feet of it (from the side). I'm more curious of the process for sizing them though.
- It okorder and view some of the product guides and review the performance data and load charts. It also depends on what type of support soil or foundation that is capable of supporting the crane.
- Q: I am currently in the Air Force reserves as a heavy equipment operator. I really want to learn how to become a tower crane operator. How would I go about doing this? I live in CA.
- Hey Patrick, I was formerly a tower crane erector out of Washington DC. BUt, to yor question, I wold highly recommend you go to your town's Operator engineers Union Hall and inquire as to the qualifications and requirements to enroll in their apprenticeship program. Yes you will have to go thru the apprenticeship program. A tower crane operator is a coveted job among operators... You have to learn to hold your 'P for long periods as well as have great depth perception You coming out of the service, you should be given some preference Good luck
- Q: what can lead tower crane to blank out?
- (1) tower crane has crack; (2)Brake block friction lining wear up to 50% ofRaw material thickness ; (3)Brake wheel surface wear reaches 5mm ~ 2mm (4)Spring has plastic deformation; (5)Lever system, air travelis more than about 10% of its rated trip
- Q: I was told that this was taking place, so i would like to fax the info to the proper local
- Is that a woof woof dog, or a dogman? A dogman is the person responsible for loading a crane. In days gone by, he often rode on the load while it was being hoisted. Maybe some still do?
- Q: In the Legend of Sleepy Hollow Ichabod Crane has come from?
- New York
- Q: Is there an effective utility for estimating the required size of a crane? I’m an estimator for a mechanical contractor, and it seems we never allow enough money for crane rental. How can I effectively adjust my estimates?
- Sub contract this one section of crane use out to an rigging company using a flat rate. That way if they need a larger crane it is on them the down side is they always bill high but there will not be over runs.
- Q: Why do you think children all over the world still fold paper cranes and send them to Hiroshima? Please answer c:
- I think children send them from all over the world because of what she did and they were inspired by her i guess 0o. ( 1000 paper cranes it hard to make and annoying lol)
- Q: Is the working load of a crane the maximum weight it is able to lift?
- generally the safe working load (SWL) is the max weight a crane can lift in regular operation . but for testing purpose the crane may be loaded more (1.5 times SWL or 2.00 times swl) further it depends on application of the crane. The reason being if you test the crane for higher values, it means it is safe to use within the SWL But the higher value must not cross beyond structure design load
- Q: What are the four major moving mechanisms of a tower crane?
- Tower crane refers to the fuselage for the tower frame, can walk along the track, a crane equipped with rotary arm. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system.
- Q: when do i start bernie cranes missions gta 4?
- You have to have progress enough to be in Algonquin (the second island) and yo have to complete the Hostile Negotiation and No Way on the Subway missions before you encounter Bernie and are able to take mission from him.
Send your message to us
Tower Cranes Self-ascending China QTZ63(5610)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords