• QTZ50(4610A) tower crane System 1
  • QTZ50(4610A) tower crane System 2
  • QTZ50(4610A) tower crane System 3
  • QTZ50(4610A) tower crane System 4
QTZ50(4610A) tower crane

QTZ50(4610A) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ50(4810A) tower crane is hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 48m and the maximum lifting moment of 544kN•m. The tower crane has the lifting height of 30m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises.

2. Lifting Technical Performance
2.1 Lifting Performance Table and Lifting Performance Curve
(1) 4-magnification Lifting Performance Table

 

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q: Ok, so I figured out that last step after watching an origami tutorial thing on youtube
It okorder / The animations on this site are good, showing what you have to do, without hands in the way.
Q: If so, what time of year?
I have lived and worked in Lyon and have never seen a crane fly in the built up area of the city, even when they are at their most active, which is in June. There are some that fly about in gardens but in any case they are harmless even though some people are freaked out by the way they fly. It is their grubs, the Leather Jackets, which are hated by gardeners as they are detrimental to lawns.
Q: what would you wish for?also, when your done making your 1000 cranesm what do you need to do next? to like, make your wish come true??
I would wish for immortality.
Q: [tower crane] and [tower crane] what is the difference between, how to distinguish?
To put it plainly is a great name.A nickname is.
Q: How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
Building Cranes
Q: I have learned how to make crane but I just can't! I've watched about 6-7 videos for it and i still don't get it!
If that doesn't help at all , try pictures with words . Here are my two favourite sites . They have good instructions and pictures . Really simple to understand .
Q: Similarities in theme with Emily Dickinson and Stephen Crane?
Mortality would be the big one
Q: How do cranes use geometry?
If your referring to cranes in construction cranes, then it might form a right triangle with the ground implying the use of trigonometry which is a part of geometry.
Q: total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
To account for the inefficiencies, and startup currents, you should have a 200 kW (200 kVA) inverter with peak power of 800 kW. The batteries would have to store and deliver about 150 kW. But lead acid batteries would need to be of a higher capacity to guarantee that power level for 1/2 hour, which calculates to 75 kW-hour. I'd say 100 kW-hour capacity. A large 12 volt battery can store about 100 amp-hours which translates to 1 kW-hour, so you would need 100 of this size batteries connected in series/parallel. I made a lot of guesses, you should get better numbers for the motors, the inverters and batteries for a more accurate calculation. An inverter of the size needed will not be a 12 volt unit, but probably 48 or 96 volts DC. so you need to configure your batteries in series parallel to get that voltage. Altogether, the 100 large batteries make this not a practical solution. There are lots of large cranes in the world, what do they use for backup? And why do you need backup. With no power, the clutches would keep the crane and loads fixed in position, my guess.
Q: What is the name for a group of cranes?
Here okorder /.. For Magpieix - a sedge of cranes is equally correct, as is a construction of cranes; some collectives have more than one description! ;)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords