• QTZ125 tower crane System 1
  • QTZ125 tower crane System 2
  • QTZ125 tower crane System 3
  • QTZ125 tower crane System 4
QTZ125 tower crane

QTZ125 tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125 tower crane is hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.

All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

400

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

29

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-10.966

11

12

13

14

15

16

17

18

19

20

Lifting capacity(t)

4

3.98

3.64

3.36

3.10

2.89

2.70

2.54

2.39

2.26

2.14

Amplitude(m)

21

22

23

24

25

26

27

28

29

30

31

Lifting capacity(t)

2.04

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

1.35

Amplitude(m)

32

33

34

35

36

37

38

39

40

41

42

Lifting capacity(t)

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

0.99

0.97

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-21.4

22

23

24

25

26

27

28

29

30

Lifting capacity(t)

2

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

Amplitude(m)

31

32

33

34

35

36

37

38

39

40

Lifting capacity(t)

1.35

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

Amplitude(m)

41

42

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.99

0.97

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

 

Q: I have seen a crane sitting in a tree watching over the pond in my front yard. I have never seen any fish in the pond and so i am curious as to why the crane is there. I thought cranes only hangout by ponds if there are fish. Does anyone have an research hypotheses to why the crane is there?thanks in advance
They are opportunistic feeders that change their diet according to the season and their own nutrient requirements. They eat a range of items from suitably sized small rodents, fish, amphibians, and insects, to grain, berries, and plants.The cranes as a family consume a wide range of food, ranging from animal to plant matter. When feeding on land they consume seeds, leaves, nuts and acorns, berries, fruit, insects, worms, snails, small reptiles, mammals and birds. In wetlands roots, rhizomes, tubers and other parts of emergent plants, other molluscs, small fish and amphibians are also consumed as well. The exact composition of the diet varies by location, season and availability. Within the wide range of items consumed there are some patterns; the shorter-billed species usually feed in drier uplands while the longer-billed species feed in wetlands
Q: how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q: how tower crane extend it heights?
They okorder /
Q: For example, self lifting tower crane mounted to 10 meters or 2 floor use. How do you install the third floor now? Is it necessary to remove the crane?. Then add the length of the steel frame on the base seat, and then install the crane above him If so, then 2 cranes are needed. But how is another crane installed?Ask you experts on the construction site of self lifting tower cranes how to install?. Do you use hydraulic jacks like car jacks?
It is required from the upper plus height, then the crane through the motor (hydraulic is not I don't know if not carefully studied to estimate almost) slowly up, because the installation of crane is a separate Union, only the crane is fixed on the top, and is connected to the lower die width ratio some long, above there are for the installation of people stay small table, but also it can open from the opening above the dead ground fill and then fix it by bolt, and then put the live up to OK
Q: feminists always point to sexism. but Ive found 3 women here - who say they have experienced no sexism, and were pleasantly surprised by how excepting their largely male co-workers have been -
I dunno. I tried to get a blue collar job and asked my friend for a reference and he said, You know they won't hire you. Why, because I'm a lady? Yeah. Whatever, I didn't want your stupid job anyway. He's underworked and underpaid anyway, so women aren't exactly lining up to steal his job, anyway.
Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
They put a crane on the ground, and they build 5 stories, say. Then they put the crane on top of the 5th story, and build another 5 stories, then they put it on the 10th story and build 5 more, etc. Or it's hanging on the side of the building, moving upwards as the building rises.
Q: I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
He angered the President by failing to stop the contestants from beating the game, so his death was demanded.
Q: A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m. Calculate the work the crane performs.
I will try to make it very simple. First lets convert the 2355 into a mass. 2355/9.81 = 240.06 Kg Then, we need to get the mass of the soil. Density (p)= m/v m= pv m= 2084*1.81 = 3772.04 Kg Total mass= 4012.1 Kg The final step is to calculate the work done. It can be solved from two perspectives and both will lead to the same solution. Sol. 1: Since that the crane is lifting an object, then the work the crane is doing is against gravity which is calculating the gravitational potential energy gained by the bucket. GPE= mgh= 4012.1*9.81*7.56 = 2.99*10^5 Sol 2: Work done= Force*distance moved in the direction of the force The force in this case will be the weight of the bucket. Work done= (4012.1*9.81)*7.56 = 2.99*10^5
Q: Please help me. I have to write and essay about it and i cant find it on the web!! no anywhere i can get it from ONLINE?!?!?! any particular search engines?
www.okorder /
Q: What was the mekhane (crane) used for in Greek plays?To remove scenery between actsTo lift the king and his court to their viewing boxFor actors playing the godsIt was only used in building and tearing down the set
for actors playing gods. that's where the phrase deus ex machina comes from -- god in a machine.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords