• QTZ125(6018)tower crane System 1
  • QTZ125(6018)tower crane System 2
  • QTZ125(6018)tower crane System 3
  • QTZ125(6018)tower crane System 4
QTZ125(6018)tower crane

QTZ125(6018)tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125(6018 ) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q:Has anyone actually folded 1000 paper cranes? i want some proof
no. But I have read the book sadako and the thousand paper cranes. I was so sad when I read that. I have always wanted to fold A paper crane.
Q:a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
work done(W) is given by the change in the potential energy(P.E). here, initial P.E = 0. final P.E = mgh = (500)(10)(20) = 100000 J =100 KJ (kilo joules) therefore work done = 100 KJ. here distance means vertical height.But if the crane takes the load parallel to the ground ,then work done will be zero.Time is given here to calculate the power of the crane given by work/time = 10 KW(kilo watts).
Q:I am writing an annotated bib about this topic and I'm not sure where to start looking or what could and couldn't be considered as a theme.
Stephen Crane Works
Q:Something confuses me in dragon ball:When roshi has a flash back, he says crane didn't turn evil until after mutaito fails to kill piccolo, but in the filer where goku goes back in time, crane is an asshole before picolo and roshi referred to him as a friend before the piccolo incident.Also, why in the piccolo flash back are roshi and crane bald but in the filler do they have hair and glasses?Also, why in the filler does crane have a different outfit in the filler than the other students but in the piccolo flash back he has the same outfit as roshi?
The idea is that Crane Hermit is a selfish man that would do anything to get what he wants. In the past, Master Mutaito was there to ram some discipline in his head and have him under control. Following the events of his death and the defeat of King Piccolo, nothing could really stop him from being a selfish jerk again. Roshi probably didn't mention Crane being bad before King Piccolo's arrival because he wasn't really evil before it either. He was selfish and greedy, but not outright despicable as later... at least not that much. Roshi seeing Crane as a friend might imply that Crane had some redeeming qualities during his years as Roshi's rival under Mutaito's guidance. About their baldness, I think they shaved their heads after a while due to how monks and some martial artists tend to shave their heads. That or it's a plot hole due/filler error. It's again either a plot hole/filler error or they just switched outfits once they reached a certain level of their training, just like how you gain a different color of band as you progress in Judo and Karate.
Q:I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
Q:I've only read Hunger Games and watched the movie and noticed a large presence of Seneca Crane in the movie.However, I don't recall him being mentioned in the Hunger Games? Is he even mentioned in the Hunger Games? If so, please provide pages.I know he is definitely mentioned in Catching Fire but I haven't read that yet.
No they just wanted to show who he was and what he did. How he died and why
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
Before the installation and disassembly of 2.0.10 tower cranes, special construction plans shall be worked out to guide operators to perform installation and disassembly operations. The special construction plan shall be prepared according to the actual conditions of the product specifications and the working site of the tower crane, and shall comply with the requirements of the relevant laws, regulations and standards. The special construction plan shall be examined and approved by the technical, safety and equipment departments of the unit, and approved by the technical person in charge, and shall be approved by the supervision unit.2
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:I need the answer badly
The world would be a little less beautiful. The blue crane's role as a predator in its ecosystem would be left empty, allowing its former prey to breed without check until (hopefully) another predator moves in to pick up the slack. Otherwise the ecosystem will be out of balance.
Q:the part of the crane which balances the lifting arm.
get some bodybuilders to help you ...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords