• Pressed Limpet Coupler  for Scaffolding Q235 Q345 CNBM System 1
  • Pressed Limpet Coupler  for Scaffolding Q235 Q345 CNBM System 2
Pressed Limpet Coupler  for Scaffolding Q235 Q345 CNBM

Pressed Limpet Coupler for Scaffolding Q235 Q345 CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of  Pressed Limpet Coupler  for Scaffolding

  • Material :SPHC

  • Production Standard :BS1139 EN74

  • Applications :Construction

  • Package :In bag and pallet


  • Pressed Limpet Coupler  for Scaffolding Q235 Q345 CNBM

  • Pressed Limpet Coupler  for Scaffolding Q235 Q345 CNBM

Futures of  Pressed Limpet Coupler for Scaffolding

Coupler is a connector between two moving parts to relay the motion, such as a Universal joint or an Oldham coupler.

  • The scaffolding coupler is the connecting hardware between the steel rail and rail bearing.

  • The Couplers are used to fix the steel rail on rail bearing to keep the rail gauge and prevent their opposite vertical and horizontal movements.

  • The good scaffolding couplers always consider design with less coupler system accessories for easy installation & disassembly.

  • Choose the durable & flexible & high strength couplers can firmly connect the steel rail and rail bearing.

  • Especially recommend the flexible couplers for concrete sleeper moulds application due to enough flexibility requirement from concrete sleeper

  • Our scaffolding couplers are with dual anti-rust processing (deactivation & galvanizing) for a longer lifespan compared to the common couplers.

 

  • Adapting full steel plate with cold press molding,  scaffolding couplers are with advanced structure design.All scaffolding couplers are with very high strength & toughness much higher than international general coupler standards. They totally eliminated the safe hazard compared to common cast iron couplers which easily cause the safe hazard due to scaffolding system collapsing accidents resulted by coupler fracture.

  • Our scaffolding couplers with superior stability & high load bearing capacity are popularly used in various construction/engineering applications.

  • The low-cost  couplers overcome the point & line fitting problems between couplers and tubes due to the Max Joint Area and cause no safe hazard resulted by steel tube slip. Greatly reinforced the mechanical properties & safety to the scaffolding and prolong the couplers lifespan.



  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: Please help me in building professional people (scaffolding)
Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q: Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q: Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
Steel pipes need to be equipped with 210-220 fasteners, 90% of the cross fastener
Q: I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
This specification is applicable to the design, construction and use of the floor (bottom) door type steel pipe scaffold used in industrial and civil construction. The door type steel pipe scaffold for other purposes (such as chimneys, water towers, etc.) can be carried out in accordance with the principles of this specification.
Q: Because my friend wants it done but isn't sure :)
Old enough to spell PIERCED right. <3
Q: This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Foot plate:(1) scaffold with welded steel sheet with 18# wire fence, bundled in the bar.(2) steel bar appear off, the serious corrosion of the prohibition of the use of.(3) the wire binding must use 18# wire binding, and each steel bar binding plate must be above 4
Q: Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
Scaffold Piercing Jewellery
Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
i wouldn't. it may look rly cool now, but wait til u get older. would a job interview go well with that piercing? or a big hole? just think about that.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords