British Pressed Double Coupler for Scaffolding Q235 Q345 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 30000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of British Pressed Double Coupler for Scaffolding
Material :SPHC
Production Standard :JIS
Applications :Construction
Package :In bag and pallet
Futures of British Pressed Double Coupler for Scaffolding
Scaffolding coupler is the connecting hardware between the steel rail and rail bearing.
The Couplers are used to fix the steel rail on rail bearing to keep the rail gauge and prevent their opposite vertical and horizontal movements.
The good scaffolding couplers always consider design with less coupler system accessories for easy installation & disassembly.
Choose the durable & flexible & high strength couplers can firmly connect the steel rail and rail bearing.
Especially recommend the flexible couplers for concrete sleeper moulds application due to enough flexibility requirement from concrete sleeper
Our scaffolding couplers are with dual anti-rust processing (deactivation & galvanizing) for a longer lifespan compared to the common couplers.
Adapting full steel plate with cold press molding, our scaffolding couplers are with advanced structure design.All scaffolding couplers are with very high strength & toughness much higher than international general coupler standards. They totally eliminated the safe hazard compared to common iron casted couplers which easily cause the safe hazard due to scaffolding system collapsing accidents resulted by coupler fracture.
Our scaffolding couplers with superior stability & high load bearing capacity are popularly used in various construction/engineering applications.
The low-cost scaffolding couplers overcome the point & line fitting problems between couplers and tubes due to the Max Joint Area and cause no safe hazard resulted by steel tube slip. Greatly reinforced the mechanical properties & safety to the scaffolding and prolong the couplers lifespan.
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q:Which accessories are included in a movable scaffold
- Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
- Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
- Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
- Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- 10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
- Q:hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
- leave the dry blood let it heal be patient
- Q:The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
- Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
- Q:In the U.S.I live in Illinois as well so... yeah :DThank you!
- I paid around $55 +tip for mine but it varies from place to place...just call the place you plan on going to and ask them how much they charge.
- Q:I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
- can't draw here, but it's just an x with a flat board on top in 3 dimensions.
- Q:What are the common rules for calculating the amount of scaffolding works
- General rules for the calculation of scaffolding:Masonry works (including building blocks) are higher than 1m when calculated by external scaffolding. Independent column height of less than 3.6m according to the core of the core of the circumference of the height of the calculation of the height of the project; the height of more than 3.6m of the column core circumference plus 3.6m multiplied by the actual height of the project to calculate the amount of masonry.
- Q:Okay so I want to get either done, I just want to know which one is more painful. Not felling that nervous because I have had my nose and tongue done. I want to know which one is more painful and how to clean each of them. And also with the lip, is it more like the tongue with what foods you can eat and how hard it is to eat?
- Everyone is different as far as what piercings they think hurt more or less, but based on my own experience, I'd say the scaffolding hurt more by far. Now, I've never had my lower lip pierced, but I had my upper lip area (I used to have angel bites), so I'd image it would have to be similar to the lower lip as far as pain, care, healing. As far as cleaning them, it's like most other piercings, where the best thing for you to use is warm sea salt water. But although everyone's different, the lip is going to be the faster healing of the two I'd say for basically anyone. The scaffolding takes up to a year to fully heal. The lip heals relatively fast;usually anything involving your mouth area heals quicker than other areas of the body-I'm sure you noticed how your tongue healed fast. Or even if you accidentally bite or cut anything involving your mouth, tongue, inside of your cheeks, etc., it heals faster than other areas. As far as the foods other aftercare with it, it is somewhat similar to your tongue in caring for it-just follow your piercer's instructions you'll be fine. Good luck!
- Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
British Pressed Double Coupler for Scaffolding Q235 Q345 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 30000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords