• Painted Spanish Steel Prop 2.0-3.5MM  Q235 Steel Prop Standard EN1065 CNBM System 1
  • Painted Spanish Steel Prop 2.0-3.5MM  Q235 Steel Prop Standard EN1065 CNBM System 2
  • Painted Spanish Steel Prop 2.0-3.5MM  Q235 Steel Prop Standard EN1065 CNBM System 3
Painted Spanish Steel Prop 2.0-3.5MM  Q235 Steel Prop Standard EN1065 CNBM

Painted Spanish Steel Prop 2.0-3.5MM Q235 Steel Prop Standard EN1065 CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Painted Spanish Steel Prop 2.0-3.5MM  Q235 Steel Prop Standard EN1065 

  • Material :Q235 carbon steel

  • Surface treatment :painted/electro-galvanized/power-coating/hot dipped galvanized

  • Standard: EN1065

  • Thickness :1.6mm-3.0mm




  • Painted Spanish Steel Prop 2.0-3.5MM  Q235 Steel Prop Standard EN1065 CNBM

  • Painted Spanish Steel Prop 2.0-3.5MM  Q235 Steel Prop Standard EN1065 CNBM

  • Descriptions of Painted Spanish Steel Prop 2.0-3.5MM Q235 Steel Prop Standard EN1065 

  • Our steel prop is a very Economical & practical & simple & easy installation bracing member with very high bearing capacity.

  • The steel props are very good vertical support suitable for various shaped slab formworks and popularly used in vertical structure support system. 4000 tons annual output.

  • Our steel prop used as a formwork is with very high bearing capacity.

  • Steel prop's vertical load capacity (within 4 meters length) can reach 10 KN.

  • Nuts are strictly manufactured according to national standard and with 10 tons load capacity.

  • Basic load capacity  ≥15KN tested by national authorized organizations.

  • Shortening working hours & high efficiency

  • Firm structured props with high strength bearing capacity perfectly resisted the external shocks.

  • Galvanized prop surface process

  • Practical & Economical  steel props make the buyers feesafe.



FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: How to solve the problem of scaffold pipe repair
Easy to move, straightening, derusting, ash removal, painting can be completed on the same machine at the same time, labor saving, labor-saving, easy to operate, can be adjusted 48mm Phi - Phi 51mm of all types of steel pipe
Q: Scaffolding installation and precautions?
Began to set up the column, should be set up every 6 span of a throw support, even after the installation of the wall is stable, can be removed according to the circumstances.
Q: How to calculate the double wall scaffolding
The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q: i just need to know the age limit with parental permission?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q: how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding
Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q: scaffolding business?
scaffold /, -f(@)ld/ · n. 1 a raised wooden platform used formerly for public executions. 2 a structure made using scaffolding. · v. attach scaffolding to. – DERIVATIVES scaffolder n. – ORIGIN ME: from Anglo-Norman Fr., from OFr. (e)schaffaut, from the base of catafalque.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords