• Nutrition Geotextile for Riverbank landscape projects Geotextile System 1
  • Nutrition Geotextile for Riverbank landscape projects Geotextile System 2
  • Nutrition Geotextile for Riverbank landscape projects Geotextile System 3
  • Nutrition Geotextile for Riverbank landscape projects Geotextile System 4
Nutrition Geotextile for Riverbank landscape projects Geotextile

Nutrition Geotextile for Riverbank landscape projects Geotextile

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
888 m²
Supply Capability:
280000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of Nutrition Geotextile for Riverbank landscape projects


Made from PROT, L etc. Natural fiber by nonwoven process, it's composed of nonwoven
Geotextile layer and nutritive layer for plants.

Specification of Nutrition Geotextile for Riverbank landscape projects:

200G/M2-400G/M2

L. One side thermally bonded nonwoven geotextile
2. Both sides thermally bonded nonwoven geotextile

Nutrition Geotextile for Riverbank landscape projects Geotextile

Nutrition Geotextile for Riverbank landscape projects Geotextile


Features of Nutrition Geotextile for Riverbank landscape projects:

I. Bigger pore size between textiles, good adhesive ability of soil particle
2. The withstanding ability because of soft surface when ground deformation
3. Excellent drainage and protection ability

Application of Nutrition Geotextile for Riverbank landscape projects:

I. Various landscape projects of municipal construction
2. Landscape projects for riverbank and river dike
3. A|I kinds of ecological resto ration projects

Area


Application of Geosynthetics 

Hydraulic

Lagooning and Water Treatment, Ornamental Ponds, Golf Courses Aquaculture and Desalination Water LagoonsTanks, Reservoirs, Liquid WasteFloating Cover SolutionsDrainage and FiltrationShading Cover Solutions

Environment

Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers

Civil Works

Erosion Control, Secondary Containment, Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.

Building

Parkings,Roofing,Soundproofing building

Q: A complete set of basement waterproof construction program
First, the basement of the external walls of water leakage project engineering basement waterproofing standard GB50108-2001 "underground engineering waterproof technical specifications" secondary waterproof rating. Basement exterior wall waterproof structure with self-waterproof concrete plus coil waterproof, 50 thick polystyrene board protective layer.
Q: What is PE waterproof cloth and PVC tarpaulin
PVC (tarpaulin) Features: coated high-strength polyester waterproof cloth is a high-strength polyester canvas-based cloth, coated with polyvinyl chloride (PVC) paste resin with accelerator, anti-mildew agent, anti-aging agent, anti Electrostatic agents and other chemical additives, made by high temperature plastic. Waterproof, anti-aging, anti-static and other properties; and the product breaking strength, tear elongation, tear strength is much better than the traditional tarpaulin; product appearance colorful, it is pleasing to the eye. The surface of the special treatment from the anti-skid effect, is the international popular waterproof cloth, and the width of large, reaching 2 meters wide, processing products can reduce the patchwork to improve the quality, can be used to heat sealing stitching, The And according to user needs to produce different functions, different colors, different thickness of the product.
Q: What material waterproofing can be mixed with cement sand
Construction can also be used to produce waterproof pulp, waterproofing agent for the amount of cement 3 ‰ -4 ‰, the use of cement label not less than 32.5MPa.
Q: Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q: FRP finished brush on what can be waterproof do not fade
With glass fiber reinforced plastic + color paste even after the use of. Can be waterproof.
Q: What is the car material so that the car can be waterproof, in the rain will not leak in?
Engraving process car sticks A. knife engraving process: refers to the computer will be vector graphics input knife machine, the knife will be cut into a preset film shape, and then by hand will be different colors together Finished, and finally in the finished product posted on the surface of a layer of transparent transfer film, after the stickers to remove the stickers; due to knife car paste production process is complex, high cost of materials, currently only suitable for individual car and Che Youhui team Small customization
Q: I would like to ask how to do in the warm water above,
1, I think the flexible mortar, waterproof paint better, because these materials in the construction process, not to warm the temperature caused too much impact, if the shop waterproofing membrane is too heavy, may affect the warm heat. 2, generally in the floor before the warmth, first do a waterproof, paved to warm to do once.
Q: Why should the use of high pressure perfusion waterproof plugging method
High pressure grouting construction features: 1, a high degree of finished product 2, simple operation; reduce the construction time 3, the construction from the weather; 4, non-toxic pollution;
Q: Villa roof leakage what general reasons, what materials to remedy
Third, for some of the city building cover the construction of red tiles leakage, as long as the removal of tiles on the grass, moss or dust after the replacement of tiles, leak-proof effect is the same. For flat roofs, the roof of the obvious cracks, with the tool will be cracked into a "V" or "U" shape, filling the caulking ointment, filled with cracks and above the use of waterproof wrap around the package.
Q: Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
First, rigid (concrete) waterproof roofing SBS membrane should not be painted before the coating of any waterproof coating, otherwise it will damage the bonding strength of the coil and the grassroots.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords